ML19332C828
| ML19332C828 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/21/1989 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 89-005, 89-5, NUDOCS 8911290052 | |
| Download: ML19332C828 (2) | |
Text
~
y(;5 g.
[ Alabirra Pbwer Compmy s
40 inverness Center Parkry J.
Post Offee Box 1295
, Birmingham, Alabama 35201.-
1 Telephono 205 868-5581 2'
4
~
.' W. G. Hairston, l11 --
zi Senior Vice President
> n Nuclear Operations >
gg g
7 November 21,:1989 IN some *tesystem
. i.. ;
Docket'No. 50-348
(
_ U. ' S. Nuclear Regulatory Commission ATTN Document' Control Desk
. Washington, D. C.~20555 Joseph M. Farley Nuclear Plant - Unit 1 Special Report No.89-005, Fire Barrier Penetration Open-For More Than Seven Days 4
Gentlemen:
In 'accordance with the requirements of Technical Specificatior. 3.7.12, the-(
enclosed Special Report No.89-005, Unit 1, is submitted.
Respectfully submitted, h.
. Y~j
~
W. G. Hairston, III
.VGH,III/ JAR:md.11.37 1
Enclosure
.cc Mr. S. D. Ebneter Mr. E. A. Reeves Mr.'G. F. Maxwell-
+
e I
8911290052 891121
/
l{
FDR ADOCK 05000348 S
PDC h.
i 8
'm
< 3, s
}
?
lM '
Enclosure 5
t l
Special R? port No.89-005, Unit 1 Fire Barrier Penetration open For More Than Seven Days he containment equipment hatch was open for more than seven days during I
the Unit 1 ninth refueling outage. We hatch was opened to support outage 12
. activities. We seven-day time limit for the equipment hatch was exceeded on October 30, 1989. Since the containment wall is considered to be a fire barrier, opening this hatch constitutes breaching a fire barrier.
Technical Specification 3.7.12 requires that, within one hour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol.. Technical
' specification action statement requirements were met in that personnel were present continuously when the hatch was'open. Technical Specification 3.7.12.also requires that breached fire barriers be restored to functional status within-seven days or a Special Report must be submitted within the following 30 days.- Due to the scope of the work in progress, it was not practical to close this-hatch within seven. days. Therefore, this Special
- Report is being submitted. The containment equipment hatch was closed on November 3, 1989.