Special Rept 90-004:on 900427,fire Barriers Nonfunctional for More than 7 Days.Caused by Planned Const Activities to Modify Primary Access Point.Fire Barriers Expected to Be Restored by 900701
ML20043B586
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/24/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
90-004, 90-4, NUDOCS 9005300251
Download: ML20043B586 (2)


Text

.

3 l

1 -

),f; ,

Alabama Power Compiny -

40 inverness Cinter Pukway Post Office Box 1295 Birmingham, Alabama 35201 Telephone 205 868-5581

.i W. G. Hairs?on, til -

Senior Vice President Nuclear Operations Alabama Power the southern electric $ystem

} fay 24,1990 Docket No. 50-348 U..S. Nuclear Regolatory-Commission ATTN: Document Control Desk I Vashington, D. C. 20555 i

Joseph M. Farley Nuclear Plant - Unit 1-Special Report No.90-004, Fire Barriers Non-functional. '

~For More Than Seven Days ,

Gentlemen:

In accordance with the requirements of Technical Specification 3.7.12, the enclosed Special Report No.90-004, Unit 1,.is. submitted.-

Respectfully submitted,-

tt) YY V. G. Hairston, III I

1 VGH,III/ JAR:mgd 18.1.39 '

Enclosure cci Mr. S. D. Ebneter tir. S. T. 'lof fman i-Mr. G. F. Maxwell  ;

i

l i

-l sj l

9005300251 900524 ADOCK 0500 8

{DR 4gg- ,

/ //.

. l

, 't

Beginning at 1330 on April 27, 1990, breaches were made to several fire barrier valls as a part of planned construction activities to modify the Primary Access Point (PAP). A total of'three fire barrier valls (north and. 4 vest vall of room.465 and vest vall of room 466) and two. fire barrier doors M;

-: (doors 456 and 457) have been removed while-the PAP-is being remodeled.

Technical-Specification 3.7.12 requires that all non-functional fire barrier-penetrations be restored-to functional status within seven days or-a Special Report must be submitted within the.next 30 days. Therefore,c this Special Report is being submitted. '

4 t

The fire barriers are-expected to be restored on approximately July _1, -q 1990. Technical Specification action requirements are being met. ,j i