Special Rept 89-004:during Refueling Outage,Six Steam Generator Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Total of 24 Steam Generator Tubes Plugged
ML19327B970
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/01/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-004, 89-4, NUDOCS 8911140282
Download: ML19327B970 (2)


Text

<n l % .

'l ' O Al'abama Power Company

  • ~ *.. 40 inverness Center Parkway. - i c , ', Post Offlee Box 1295
  1. . , Birmin0 ham, Alabama 35201 -

r Telephone 205 868 5581

' W. G. Haltoton, Ill  ;

i f$'l, lR. i t'enior Vice President

N aclear Operations . ggh3gg g the southem s4ectnc system .  ;

November 1, 1989 i

+

i Docket No. 50-348 i E

U. S. Nuclear Regulatory Commission

. ATTN: Document Control Desk Vashington, D. C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 l Special Report No.89-004, Steam Generator Tube Plugging [

. Gentlemen In accordance with the requirements of Technical Specification 4.4.6.5.a, the enclosed Special Report No.89-004, Unit 1, is submitted. F Respectfully submitted, W.). $ & C W. G. Hairston, III t

1

(

VGH,III/JARimd 10.60 Enclosure cc: Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell 7 8911140282 891101 PDR ADOCK 05000348 PDC g

QY o r

..v ,,

. c- , y , - - - - . , , _... - - - . . , , , .

.s ,. .-

, Enclosure Special Report No.89-004, Unit 1 Steam Generator Tube Plugging The following steam generator tube plugging report is being submitted in accordance with Technical Specification 4.4.6.5.a.

During the current Unit 1 Cycle 9 - 10 refueling outage, six tubes exceeded the pluggablo limit based on eddy current testing results. One tube was plugged in the 1A steam generator and five tubes were plugged in the IC steam generator. In addition, the eddy current indications for eighteen tubes were not quantifiable and the tubes were plugged as a precautionary measure. The eighteen tubes that vere plugged as a precautionary measure included three tubes in the 1A steam generator, two tubes in the IB steam generator, and thirteen tubes in the IC steam generator. .Thus a total of twenty-four steam generator tubes were plugged. This tube plugging was completed on October 23, 1989.

The complete results of the steam generator tube inservice inspection vill be reported in'accordance with Technical Specification 4.4.6.5.b.

9 l

l 1' -

- . - _ , , - _