i-'
Alabama Power Comp:ny -
f
- 40 invemess Osntir Parkw
- y.
Post office Box 1295 Birmingham, Alabama 35201 1
Telephone 205 868 5581
_j i
s W. G. Hairston, til Senior Vice President Nuclear operations -
Alabama Power -
the southem electicsystem
]
January-26, 1990
'i i
Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Comission Attention: Document Control Desk.
(
Washington, D. C. 20555 Gentlemen:
Joseph M. Farley. Nuclear Plant Units 1 and 2
[
Inoperable Fire Protection Water Storage Tanks 24-Hour Report i
In accordance with 'mchnical ' Specification 3.7.ll.l.b, a 24-hour telephone.
notification was provided to the NRC on January 25, 1990, regarding both fire :
a protection water storage tanks decreasing below their Technical 4 Specification.
minimum level. 'Ihis letter serves as confirmation of the above' notification.
On January 25, 1990, at'9:59 a.m., a crack in the fire protection system yard-main occurred. The crack was located in the portion of the_ header' supplying the cooling towers ar.d resulted in both fire protection water storage tanks.
decreasing below their required minimum level. The leak was subsequently isolated and level restored to above-minimum within two hours.
A Special Report will be submitted to the NRC within 14 days.
If you have any-4 questions, please advise.
Respectfull h tted, b%
I O W. G. Hairston,-III WGH:emb/NEL-26.27
,)
cc Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell
)
9002060162 900126 i
PDR ADOCK 05000348 S
PDC Q. }'
..