ML18022A386: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/06/1986
| issue date = 09/06/1986
| title = Urges Denial of Util Request for Exemption from Conduct of Full Participation Exercise of Emergency Response Plan,Per 10CFR50,App E.Recommends Exercise Be Conducted Before Facility Permitted to Operate
| title = Urges Denial of Util Request for Exemption from Conduct of Full Participation Exercise of Emergency Response Plan,Per 10CFR50,App E.Recommends Exercise Be Conducted Before Facility Permitted to Operate
| author name = EVANS M B, SOAKEFELD E
| author name = Evans M, Soakefeld E
| author affiliation = AFFILIATION NOT ASSIGNED
| author affiliation = AFFILIATION NOT ASSIGNED
| addressee name = DENTON H
| addressee name = Denton H
| addressee affiliation = NRC
| addressee affiliation = NRC
| docket = 05000400
| docket = 05000400

Revision as of 04:54, 18 June 2019

Urges Denial of Util Request for Exemption from Conduct of Full Participation Exercise of Emergency Response Plan,Per 10CFR50,App E.Recommends Exercise Be Conducted Before Facility Permitted to Operate
ML18022A386
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/06/1986
From: Marilyn Evans, Soakefeld E
AFFILIATION NOT ASSIGNED
To: Harold Denton
NRC
References
NUDOCS 8609110295
Download: ML18022A386 (4)


Text

ACCESSION NBR FAC IL: 50-400 AUTH.MANE EVANS'.B.SOANEFELDi E.REC IP.NAI'lE DENTQN>H.REGULATORY INFORNATION DISTRIBUTION.SYSTEM (RIDS)8609ii0295 DOC.DATE'6/09/06 NOTARIZED:

NO Shearon Hav v is Nuclear Power Planti Unit i.Carolina AUTHOR AFFILIATION Affiliation NotAssigned Affiliation Not Assigned RECIPIENT AFFILIATION NRC-No Detailed Af f iliation Given DOCKET 0 05000400

SUBJECT:

Uvges denial of util vequest+ov exemption from conduct of full pav ticipation exev'cise of emergency v esponse plans pev'OCFR50 App E.Recommends exev cise be conducted fefore facility permitted to operate.DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL Sl ZE: TITLE: Request for NRR Action (e.g.2.206 Petitions) 8c-Related Correspondenc NOTES: Application fov pev mit v eneval filed.05000400 RECIPIENT ID CODE/NAI'IE PWR-A PD2 LA BUCNLEY, B Oi INTERNAL: EDO/ACB COPIES LTTR ENCL RECIPIENT ID CODE/MANE PWR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: LPDR NSIC IL 04 03 05 NRC PDR 02 TOTAL NUMBER QF COPIES REQUIRED: LTTR++ENCL ii

")-')Q').>i

()).~j,).~)"(iI fg I')g l f<"'~"~p(J$8"'3Tig>-~t(f j.i<<'Q~"g 4k I i)ZU.'."I'T'"VQ'I')6'")E)~)>i!~l 4'h'Tamil'>>)(Ut i.i'ti~~i.3E T'K~K>,K', I;>,',ll.I,'," s)ji')bS)~I;i@~A tot: iron.<))i).):l'I 6 9 ll I)L c.'i+A 8'fl'l'lTQ+I'i P,)It..31)AE I)I" Ih)'I', T:",>>')-',)I (f)r'g')j Q)N QE$LQQQ$9), f)i+4)()g)gt URN I 0+:)))br(a>3

())~)'T i (TO i t'ai))9X9'TQi O'RSUI)J'7 E i,fd)4)).>>f)<~)t)4')i)<<U, li, (<<3U<'.'T9 6, off))I, 9 9".)T<)'q)'T I)0(>'Q>"TS())9 1'0 92 I 3%()K'.)f)0I 04(l): 3 f.'I"T*'.i g 1)<)'I')'TO'I.)'I I)')4.)U4A

],~d 9 ci i 3 i'9)(9 I))(!)AlAN'3'.))1,'I)I IA 0()I" I.98 S~Sq()Ot');)-k:t.'.e-))q I),()).i),;:<EB'I'N.->>"~'ITJ."0391303R 83K~N'3 Q)lO-'>':3003 Nl))I'())fl'." l I').(L'rrE')R)~((Tc,~99 602.R.I)n3<<)i+)A VHI~i s)-I 1'>)P)rt (40

"'-':"-:

>IJNDERSIZED DOCUMENTS Q.

Dear.Mr.Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, unde~10 CFR 5(Appendix E, that the Company conduct full participation exercise of the Emergency Respon.Plan for its Shearon Harris nuclear power plan/within one year before be innin commercial ooL.'OQ greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be g~+conducted before the plant is permitted to ga operate at all...~Jg y~q,.Sincerely, pS e(i

"'-'.'""'-"UN'DE RS IZED DOCUMENTS I a

Dear Mr.Denton:

I wish to urge exemption from Appendix E, tha n e denial of CPS,L's request for the requirement, under 10 CER 50, t the Company conduct a full partxczpatzo xercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at, all.Sincerely,~go])0