ML18004A598: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:REQUL RY INFORNATION DISTRIBUTI SYSTEN (R IDS)~ACCESSION NBR: 8610200392 DOC.DATE: 86/10/14 NOTARIZED:
{{#Wiki_filter:REQUL     RY INFORNATION       DISTRIBUTI     SYSTEN (R IDS)     ~
NO DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear Power PlantI Unit i~Carolina 05000400 AU TH.,NAME AUTHOR AFFILIATION Affiliation Not Assigned REC IP.NANE RECIPIENT AFFILIATION Of fice of Nuclear Reactor Regulation.
ACCESSION NBR: 8610200392           DOC. DATE:     86/10/14 NOTARIZED: NO                 DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear           Power     PlantI Unit i~ Carolina         05000400 AUTH.,NAME             AUTHOR AFFILIATION Affiliation Not Assigned REC IP. NANE           RECIPIENT AFFILIATION Of fice of Nuclear Reactor Regulation.             Direc tor (p ost 851125
Direc tor (p ost 851125  


==SUBJECT:==
==SUBJECT:==
Opposes util request for exemption from emergency preparedness exercise requirements of 10CFR50i App E to conduct full participation exercise within 1 gr prior to b eg inning c ommer c i a 1 op era t i on.DIETR IDUTION CODE: YEOSD COPIEE RECEIVED: LTR 0 ENCL/SIZE: TITLE:-Request for NRR Action (e.g.2.206 Petitions)
Opposes   util request for exemption from emergency to preparedness exercise requirements of 10CFR50i App E conduct full participation exercise within 1 gr prior to b eg inning c ommer c i a 1 op era t i on.
Zc Related Correspondenc NOTES: Application for permit renewal filed.05000400 REC I P IENT ID CODE/NANE PWR-A PD2 LA BUCKLEY>B 01 INTERNAL!EDO/ACB COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DlR COPIES LTTR ENCL R F E EXTERNAL: LPDR NSIC 04 03 05 NRC PDR 02 TOTAL NUi>)BER OF COPIES REQUIRED: LTTR ENCL ii P  
DIETR IDUTION CODE: YEOSD TITLE: -Request     for NRR COPIEE RECEIVED: LTR Action (e. g. 2. 206 0  ENCL Petitions)   Zc
,'ear Mr.Den.ton: I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, p J Oi Bbi0200392 Bb1014 PDR ADOGK 05000400 H PDR 0, 4 A~}}
                                                                            /Related SIZE:
Correspondenc NOTES: Application for permit renewal filed.                                             05000400 I
REC P IENT           COPIES                RECIPIENT            COPIES ID CODE/NANE         LTTR ENCL          ID CODE/NANE          LTTR ENCL PWR-A PD2 LA                               PWR-A PD2 PD BUCKLEY> B       01 INTERNAL! EDO/ACB                                       ELD/HDS1 NRR DlR R     F   E     04 EXTERNAL: LPDR               03                       NRC PDR       02 NSIC              05 TOTAL NUi>)BER OF   COPIES REQUIRED: LTTR                 ENCL   ii
 
P
      ,'ear   Mr. Den.ton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
        -Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,                                     J pOi Bbi0200392 Bb1014 PDR ADOGK 05000400 H               PDR
 
0, 4
      ~
A}}

Latest revision as of 07:09, 22 October 2019

Opposes Util Request for Exemption from Emergency Preparedness Exercise Requirements of 10CFR50,App E to Conduct Full Participation Exercise within 1 Yr Prior to Beginning Commercial Operation
ML18004A598
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/1986
From:
AFFILIATION NOT ASSIGNED
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8610200392
Download: ML18004A598 (4)


Text

REQUL RY INFORNATION DISTRIBUTI SYSTEN (R IDS) ~

ACCESSION NBR: 8610200392 DOC. DATE: 86/10/14 NOTARIZED: NO DOCKET 0 FACIL: 50-400 Shearon Harris Nuclear Power PlantI Unit i~ Carolina 05000400 AUTH.,NAME AUTHOR AFFILIATION Affiliation Not Assigned REC IP. NANE RECIPIENT AFFILIATION Of fice of Nuclear Reactor Regulation. Direc tor (p ost 851125

SUBJECT:

Opposes util request for exemption from emergency to preparedness exercise requirements of 10CFR50i App E conduct full participation exercise within 1 gr prior to b eg inning c ommer c i a 1 op era t i on.

DIETR IDUTION CODE: YEOSD TITLE: -Request for NRR COPIEE RECEIVED: LTR Action (e. g. 2. 206 0 ENCL Petitions) Zc

/Related SIZE:

Correspondenc NOTES: Application for permit renewal filed. 05000400 I

REC P IENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A PD2 LA PWR-A PD2 PD BUCKLEY> B 01 INTERNAL! EDO/ACB ELD/HDS1 NRR DlR R F E 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUi>)BER OF COPIES REQUIRED: LTTR ENCL ii

P

,'ear Mr. Den.ton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, J pOi Bbi0200392 Bb1014 PDR ADOGK 05000400 H PDR

0, 4

~

A