Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:67975
| stage = Approval
}}
}}


Line 25: Line 27:
GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 - REMOVAL 0F
GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 - REMOVAL 0F
                             -ORGANIZATION CHARTS FROM TECHNICAL SPECIFICATIONS (TAC NO. 67975)
                             -ORGANIZATION CHARTS FROM TECHNICAL SPECIFICATIONS (TAC NO. 67975)
By letter dated May 2, 1988, System Energy Resources, Inc. (the licensee)
By {{letter dated|date=May 2, 1988|text=letter dated May 2, 1988}}, System Energy Resources, Inc. (the licensee)
               -requested removal of organization charts from the GGNS Unit 1 Technical Specifications. Guidance for this change to Technical Specifications was provided in Generic Letter 88-06.
               -requested removal of organization charts from the GGNS Unit 1 Technical Specifications. Guidance for this change to Technical Specifications was provided in Generic Letter 88-06.
The NRC staff is reviewing your request and finds that additional information is needed to complete its review. Technical Specification Figure 6.2.2-1, "Unit Organization," specifies that the four top management positions "must have been a SR0 or have been certified on a plant of this type." The intent of-Generic Letter 88-06 was that qualification requirements such as this identi-fied on the unit organization chart should be retained in the unit Technical Specifications. For GGNS Unit 1, it is the staff's position that the Manager, Plant Operations, should retain this qualification requirement in the TS and that deletion of this requirement from the TS for the other three managers should be justified and considered in the analysis of no significant hazards considerations. Provide a revision to your application to address the staff's position.
The NRC staff is reviewing your request and finds that additional information is needed to complete its review. Technical Specification Figure 6.2.2-1, "Unit Organization," specifies that the four top management positions "must have been a SR0 or have been certified on a plant of this type." The intent of-Generic Letter 88-06 was that qualification requirements such as this identi-fied on the unit organization chart should be retained in the unit Technical Specifications. For GGNS Unit 1, it is the staff's position that the Manager, Plant Operations, should retain this qualification requirement in the TS and that deletion of this requirement from the TS for the other three managers should be justified and considered in the analysis of no significant hazards considerations. Provide a revision to your application to address the staff's position.

Revision as of 06:58, 10 December 2021

Requests Addl Info Re Review of 880502 Request for Removal of Organization Charts from Facility Tech Specs.Info Should Be Provided by 880525
ML20154G963
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/19/1988
From: Kintner L
Office of Nuclear Reactor Regulation
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
GL-88-06, GL-88-6, TAC-67975, NUDOCS 8805250177
Download: ML20154G963 (2)


Text

.__ -

' I988 DISTRIBUTION Docket No. 50-416 'Docketfiled L. Kintner NRC PDR OGC Mr. Oliver D. Kingsley, Jr. Local PDR E. Jordan Vice President, Nuclear Operations PD21 r/f J. Partlow System Energy Resources, Inc. S. Varga E. Butcher P. O. Box 23054 G. Lainas ACRS (10)

Jackson, Mississippi 39205 E. Adensam A. Gody P. Anderson

Dear hr. Kingsley:

SUBJECT:

GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 - REMOVAL 0F

-ORGANIZATION CHARTS FROM TECHNICAL SPECIFICATIONS (TAC NO. 67975)

By letter dated May 2, 1988, System Energy Resources, Inc. (the licensee)

-requested removal of organization charts from the GGNS Unit 1 Technical Specifications. Guidance for this change to Technical Specifications was provided in Generic Letter 88-06.

The NRC staff is reviewing your request and finds that additional information is needed to complete its review. Technical Specification Figure 6.2.2-1, "Unit Organization," specifies that the four top management positions "must have been a SR0 or have been certified on a plant of this type." The intent of-Generic Letter 88-06 was that qualification requirements such as this identi-fied on the unit organization chart should be retained in the unit Technical Specifications. For GGNS Unit 1, it is the staff's position that the Manager, Plant Operations, should retain this qualification requirement in the TS and that deletion of this requirement from the TS for the other three managers should be justified and considered in the analysis of no significant hazards considerations. Provide a revision to your application to address the staff's position.

In order to complete our review as scheduled, you are requested to provide the above information by May 25, 1988. This request was discussed with Mr. Matt Crawford on May 11, 1988.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.96-511.

Sincerely,

\6\

8805250177 880519 Lester L. Kintner, Sr. Project Manager DR Project Directorate 11-1 ADOCK 05000416 PDR Division of Reactor Projects 1/11 cc: See next page

  • SEE PREVIOUS C0hCURRENCE A n i 0FC RPR:PM:P
LA:(PD
DRPR: PEB:DLPQ :D:g21 MPR :  :  :

.:... ....:............:... .p .....:............:............:...........

NAME : pan i  : LK ner:ch: AGody*  : EA$ensam  :  :  :

.....:...__.......:.........__.:............:...d........:............:............:...........

DATE : 5/R/88 :_ 5/14/88  : 5/17/88 : S /88  :  :  :

0FFICIAL RECORD COPY r\-

Mr. Oliver D. Kingsley, Jr.

System Energy Resources, Inc. Grand Gulf Nuclear Station (GGNS) cc:

Mr. Ted H. Cloninger Mr. C R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager and Support System Energy Resources, Inc.

System Energy Resources, Inc. Post Office Box 756 Post Office Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1400 L Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20005-3502 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Utilities System Services, Inc.

639 Loyola Avenue, 3rd Floor Mr. Jack McMillan, Director New Orleans, Louisiana 70113 Division of Solid Waste Management Mississippi Department of Natural Mr. John G. Cesare Resources Director, Nuclear Licensing Post Office Box 10385 System Energy Resources, Inc. Jackson, Mississippi 39209 P.O. Box 23054 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

State Health Officer Mr. C. B. Hogg, Project Manager State Board of Health Bechtel Power Corporation P.O. Box 1700 P. 0. Box 2166 Jackson, Mississippi 39205 Houston, Texas 77252-2166 '

President Mr. Ross C. Butcher Claiborne County Board of Supervisors ,

Senior Resident Inspector Port Gibson, Mississippi 39150 ,

U. 5. Nuclear Regulatory Comission i 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. James E. Cross GGNS Site Director Systems Energy Resources, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

-_