ML18004A552: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}



Revision as of 20:02, 19 April 2019

Urges Denial of Util Request for Exemption from full-scale Drill of Evacuation Plan.Problems W/May 1985 Drill Underline Need for Addl Drill
ML18004A552
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/27/1986
From: CROSSEN C R
AFFILIATION NOT ASSIGNED
To: DENTON H
Office of Nuclear Reactor Regulation
References
NUDOCS 8610060390
Download: ML18004A552 (4)


Text

REGUL/QRY INFQR>WTIQN DIBTRlaUTI

~SYSTEN (R IDS)ACCESSION NBR: Gbi0060390 DOC.DATE: 86/09/27 NOTARIZED:

NQ DOCKET FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i.Carolina 05000400 AUTH.NANE AUTHOR AFFILIATION CROSBEN>C.R.Affiliation Not Assigned RECIP.NANE RECIPIENT AFFILIATION DENTQNp H.R.Office of Nuclear Reactor Regulationi Director (post 85ii25

SUBJECT:

Urges denial of util request for exemption from ful 1-scale drill of evacuation plan.Problems e/Nag 1'785 drill underline need f or add 1 dri 1 l.DISTRIBUTION CODE: YE03D COPI EB RECEIVED: LTR ENCL SI ZE: TITLE: Request for NRR Action (e.g.2.206 Petitions) 0 Related Correspondenc NOTES: Application for permit renewal-Fi led.05000400 RECIPIENT ID CODE/NANE PMR-A PD2 LA BUCl(LEY, 8 Oi INTERNAL: EDO/ACB ELD/R 04 COP IEB LTTR ENCL RECIP I ENT ID CODE/MANE PWR-A PD2 PD ELD/HDSi NRR DIR COP IEB LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02C)TOTAL NUNBER OF COPIES REQUIRED: LTTR i i ENCL I f,~-', t' Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

I am writing to insist that you do not grant CPErL's request for an exemption from a full-scale drill of the evacuation plan for the Shearon Harris Nuclear Power Plant.This full-scale drill is required by law and was part of an agreement made between CPErL and the Chatham County Board of Commissioners, under which the Board agreed to rejoin the evacuation plan.A full scale drill is needed because there were problems with the drill conducted in May of 1985, and because there have been changes made to the plan since that time.Both Lee and Chatham Counties have instituted some changes, and only a full-scale drill will reveal whether those changes will resolve the many problems raised after the 1985 drill, and since that time.A"scaled down" drill involving only a test of notification procedures, and without the participation of all state level participants in the plan, is simply not adequate to test the plan's effectiveness, nor to ensure that local residents will be adequately protected in the event of an accident.I do not believe that CML should be allowed to be exempt from the law, especially since they have led our public officials to believe that a full-scale drill will be conducted this summer or fall.Yours sincerely,<~+g.Crossen Ze.~$<<3S Pittsboro, 9g 27312 Bb100b0390 Bb0927 PDR*DOCK 05000400 H.PDR]gy9 lo J I h 0