W3P84-3595, Forwards Rev 1 to Alert/Notification Sys. Summary of Encl Rept Will Replace Rev 0 in App K to Emergency Plan. Thereafter,Rept Will Be Maintained as Separate Document. Alert/Notification Sys Now Complete

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Alert/Notification Sys. Summary of Encl Rept Will Replace Rev 0 in App K to Emergency Plan. Thereafter,Rept Will Be Maintained as Separate Document. Alert/Notification Sys Now Complete
ML20101L655
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/28/1984
From: Cook K
LOUISIANA POWER & LIGHT CO.
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML20101L659 List:
References
W3P84-3595, NUDOCS 8501020323
Download: ML20101L655 (1)


Text

. ,

E MioDLE south uTiuTIES SYSTW LOUISIANA POWER & L1GHT 242 OeanOnOE S1 NEE 1 P O BOX 6008

  • NEW OALEANS. LOUIStANA 70174 * (504) 366-2345 December 28, 1984 W3P84-3595 3-A45 3-A1.01.04 A4.05 Director of Nuclear Reactor Regulation Attention: Mr. G.W. Knighton Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 Emergency Alert / Notification System Report Update

Dear Mr. Knighton:

Attached are two copies of the updated Alert / Notification System Report developed by Louisiana Power & Light. This report provides the current status of information submitted earlier this year and describes the implemen-tation and testing of the system to be used for the alert and notification of the public in the event of an accident at Waterford 3.

Please be advised that Revision 0 of this report presently appears as Appendix K to the Waterford 3 Emergency Plan. It is our intention to remove this document from the Plan in its next revision. In its place, we will insert a summary of Revision 1 of this report and its findings. Revision 1 will then be maintained as a separate document.

At the present time, LP&L considers the alert / notification system for Waterford 3 to be complete and we are in the process of implementing the regular maintenance and testing program for the system.

Very truly yours, K. W. Cook Nuclear Support & Licensing Manager KWC/RJP/ch Attachments cc (w/ attachments): E.L. Blake, W.M. Stevenson, R.D. Martin, D.M. Crutchfield, J. Wilson, G.L. Constable, D. Perrotti, C. Hackney l