Forwards Safety Insp Rept 50-461/89-06 on 890206-0303. Violations Noted.Util Should Be Prepared to Explain Why Corrective Actions Failed to Identify Unqualified Kynar Butt Splices & Justify Missing Weep Holes
ML20236D642
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/16/1989
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20236D644 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8903230203
Download: ML20236D642 (2)


See also: IR 05000461/1989006

Text

,

_ - - - - - - _ . - - - - - - _

.. *

x* ,

.

4

!

MAR 161989

!

!

Docket No. 50-461

EA 89-059

)

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice

President

500 South 27th Street

Decatur, IL 62525 J

Gentlemen:

1

This refers to the routine safety inspection conducted by Mr. A. S. Gautam q

and other NRC representatives of this office on February 6 through March 3,

1989, of activities at the Clinton Power Station, Unit 1, authorized by )

NRC Operating License No. NPF-62 and to.the alscussion of our findings j

with Mr. D. P. Hall and others of your staff at the conclusion of the ,

inspection. I

1

This inspection included a review of licensee actions relative to previously

identified environmental qualification findings.

Within this area, the inspection consisted of a selective examination of

procedures and representative records, observations, and interviews with

personnel.

During this inspection,.certain of your. activities apper ad to be in violation

of NRC requirements. We are releasing this report at t.is time for your

information. Following an Enforcement Conference, you will be notified by

separate correspondence of our decision regarding enforcement actions based

on the findings of this inspection. No written response is required until

you are notified of the proposed enforcement actions. ~ Please be prepared

I to discuss how you handle corrective actions from a programmatic standpoint,

,,

'

why your corrective actions failed to identify unqualified Kynar butt splices

and justify missing weep holes, what type of verifications you utilized during

the initial walkdowns in November 1987, and what controls are placed on

correspondence submitted to the NRC to ensure its adequacy.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

i

b

l

'

,

I ?,k32 % h e90316c500ty81 i\

'

O

- _ _ - _ - - _

Y60/ -

m m

,

l

l

'

.

1

'

,

,

1

-Illino.is Power Company 24 MAN 161989'

1

We will gladly discuss any questions you have concerning .this inspection.

Sincerely,

bG!NAL SIGNED DY. HUBERT J. MILLEP

l

H. J. Miller, Director

Division of Reactor Safety

Enclosure: Inspection Report l

No.50-461/89006(DRS)- i

cc w/ enclosure:

D. P. Hall -Vice President

J. S. Perry, Assistant

Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

DCD/DCB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard 1

J. W. McCaffrey, Chief, Public l

Utilities' Division I

H. S. Tay!or, Quality Assurance

Division, Sargent & Lundy )

Engineert  ;

David Rosenblatt, Governor's  !

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

J. Lieberman, OE

bec. L.C b c O ;Oh'

b. D M M A> "

yu -

RIII RI RITI RIII RIII RIII

$C1"

bautam/jk

f

G'R ing f

Gurdner e C]ooper/Whh .V

Niller

$hafe'r

03/15/89 03/ib /89 03/#/89 03/4/89 03//t /89 03/4 /89 03/j4/89