Insp Repts 50-416/86-33 on 860929-1003.No Violations or Deviations Identified.Major Areas Inspected:Inservice Insp, Review of Procedures,Observation of Work & Work Activities & Data Review & Evaluation
ML20214Q356
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/29/1986
From: Blake J, Coley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20214Q348 List:
References
50-416-86-33, NUDOCS 8612050118
Download: ML20214Q356 (8)


Text

_. . _ . ..

. .e

.

, UNITED STATES

  • -

g aEtrug>o - NUCLEAR REGULATORY COMMIS$10N g , REGION ll

, j 101 MARIETTA STREET. * 's ATLANTA, GEORGI A 30323

\....../

Report N /86-33 Licensee: Mississippi Power and Light Company Jackson, MS 39205 Docket No.: 50-416 License No. : NPF-29

. Facility Name: Grand Gulf Inspection Conduct ,'d: S >tember 29 - October 3, 1986 Inspec r: whrpM '/81A;7 /d i

/J . L T - ey ? ate Signed Approved by: _

jg)j~ d i .jJ.J. ake, n D e S' ned r Engineering Branch

./ Division of Reactor Safety SUMMARY Scope: This routine, announced inspection was conducted in the areas of inservice inspection, review of procedures, observation of work and work activi-l ties, and data review and evaluatio Results: No violations or deviations were identified.

i e

!

!

l

,.

i l

l l

r

_ _ .

[

'

8612050118 861103 PDR ADOCK 05000416 O PDR

- - - - _ . - _ . - - - -. . - _ - - - _,, _

_ -_- _- _ _- - - - --. . , . .

_ _ ._._ . _ _ . _ _ _ . _ _ . _ - _ _ _ - _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _. _ _ _ . . . . .

'

. ..

- i i

.

-

.

L REPORT DETAILS i

I

j Persons Contacted

,

Licensee Employees

  • C. R. Hutchinson, Grand Gulf Nuclear Station, General Manager  :
  • L. F. Caughtery, Compliance Superintendent i-
  • J. E. Reaves, Quality Assurance Duty Manager
*R. A. Courtney, Quality Assurance Supervisor

! *R. S. Lewis, Nuclear Plant Engineer l *J. D. Bailey, Compliance Coordinator

Other licensee employees contacted included engineers,. technicians, i mechanics, security force members, and office personnel.

i '

i NRC Resident Inspector

  • F. Smith, Resident Inspector

} * Attended exit interview i

l' Exit Interview i l The inspection scope and findings were summarized on October 3,1986, with

'

!

! those persons indicated in paragraph 1 above. The inspector described the

! areas inspected and discussed in detail the inspection finding No l j dissenting comments were received from the licensee. The following new item

, was identified durino this inspectio L

j -

Inspector Followup Item 416/86-33-01, Administrative Corrections Needed [

For Radiographic Procedure No. M-RT-XG-2, Revision !

. The licensee did not identify as proprietary any of the materials provided <

, to or reviewed by the inspector during this inspectio I Licensee Action on Previous Enforcement Matters

.

This subject was not addressed in the inspection.

i

!

4 Unresolved Items

<

Unresolved items were not identified during the inspectio I f

! Inservice Inspection (ISI) - Review of Procedures (73052) (Unit 1)

The inspector reviewed the licensee's approved ISI program for the first 10

year interval. The program was written to comply with the ASME Boiler and 1 Pressure Vessel (B&PV) Code,Section XI, 1977 Edition with Addenda through

!I

t 1 i A,_ - , - , - , I

. ..

.

. .

.the Summer 197 The licensee is presently in the first refueling outage of the first perio General Electric (GE) Apparatus and Engineering Services is performing the Ultrasonic examinations of components and piping using licensee approved GE procedures. U.S. Testing was performing the required surfaces examinations in accordance with Mississippi Power and Light's (MP&L) program and proce-dures, and MP&L was performing the required visual examinations.

.# The following prog rammatic procedure and manuals were reviewed to determine if they were consistent with regulatory requirements and licensee commitments:

j MP&L's Inservice Inspection Ten Year Program -

-

General Electric's Quality Assurance Manual for Inservice Inspec-

tion Services for Grand Gulf 1 & 2 (QAM-3 Revision 10)

-

General Electric Apparatus and Engineering Services Procedure for Quality Assurance Indoctrination and Training (QA-1, Revision 0)

-

General Electric Apparatus and Engineering Services Procedure for

Qualification and Certification of Non-Destructive Examination l Personnel (QC-2 Revision 4)

-

Nondestructive Examination Turnover Request for the Fi rst Refueling Outage (Outage Plan)

'

The following GE Procedures were reviewed in the areas of procedural approval requirements for qualification of NDE personnel and compila-

,

tion of requiced records:

-

Procedure for UT Examination of Pressure Vessel Welds (UT-1, Re )

!

-

Procedure for UT Examination of Threads in RPV Flange (UT-6, Rev.

!

1)

-

Procedure for Remote Ultrasonic Examination of Reactor Pressure Vessel Welds and Base Material (UT-9, Rev. 1)

l

-

Remote UT Examination of Nozzle to Vessel Welds (UT-10, Rev. 1)

,

-

Procedure for Evaluation of Ultrasonic Indications in Reactor Pressure Vessel Welds (UT1.11.3, Rev. 0)

-

Procedure for UT Examination of Nuclear Piping Systems (UT-14, Rev. 1)

-

Procedure for Manual Ultrasonic Examination of CRC Welds (UT-20, i

Rev. 2)

.

!

-

- _ _ _ . __ ..

. . ..

t n'

.

-

,

,

-

Procedure for UT Examination of Pressu're Retaining Bolting Exceeding Two Inches in Diameter (UT-21, Rev.1)

-

Procedure for Nozzle Inner Radius Remote Ultrasonic Examination (UT-28, Rev. 1)

-

Procedure for Ultrasonic Examination of Austenitic Metal Welds of i IGSCC'(UT-30, Rev. 14)

-

Ultrasonic Planar Flaw Sizinc (UT1.35, Rev. 3)

.

'

-

Procedure for Ultrasonic Examination of Pipe Welds Using Automated Equipment (UT-43, Rev. 8)

-

Procedure for Ultrasonic Examination of Recirculation Piping Caps

for IGSCC (UT-46, Rev. 1)

-

Procedure for Automated Ultrasonic Examination of CRC Welds >

'

(UT-47, Rev. 1)

i -

Procedure for Automated Ultrasonic Examination of Dissimilar Metal

'

Welds (UT-51, Rev.1)

-

Procedure for Ultrasonic Examination of Dissimilar Metal Welds (UT-53, Rev. 0)

-

Ultrasonic Examination of Nozzle Inner Radius for Nozzles with Inside Diameter of Less Than Ten Inches (UT-54, Rev. 0)

! -

Procedure for Ultrasonic Examination of Jet Pump Beams for Middle t South Energy, Inc. , MP&L (09-08, Rev. 0)

!

.

l

-

Review Process and Analysis of Recorded Indications (NDE-1, Rev.

! 0)

i

-

Procedure for Zero Reference Location and Data Recording for i Non-Destructive Examination (NDE-49, Rev. 0)

! The following GE and MP&L procedures were reviewed for technical

! content and to determine if they were consistent with the requirements l

of the ASME, B&PV Code.

!

-

GE Procedure for Remote Ultrasonic Examination of Reactor Pressure l

Vessel Welds and Base Material (UT-9, Rev. 1)

-

GE Remote UT Examination of Nozzle to Vessel Welds (UT-10, Rev. 1)

-

GE Procedure for Nozzle Inner Radius Remote Ultrasonic Examination (UT-28 Rev. 1)

,

t

'i _ . _ . ~ - - . - - _ . . . _ -,

- - . . _ _ . _ . , , , _ _ _ -

_ . ~ , , . _ - , _ _ , , , _ _ . . , . _ _ _ _

_ _ __ _ _ _ ,

. ..

...

.

.

'

-

GE Procedure for Ultrasonic Examination of Pipe Weld using Automated Equipment (UT-43, Rev. 8)

-

MP&L Quality Assurance Procedure Liquid Penetrant Examination (QAP.9.50, Rev. 0)

-

MP&L Quality Assurance Procedure Magnetic Particle Examination (Yoke Method) (QAP9.60)

-

MP&L Nondestructive Examination Standard for Radiography (M-RT-XG-2, Rev. 1)

During the inspector's review of MP&L's radiographic procedure M-RT-XG-2, Rev. 1, the following administrative errors were noted:

'

,

(1) The scope of the document (paragraph 1.2) identified that this l standard was written to comply with the ASME B&PV Code,Section V,

'

Article 2, 1974 Edition including Addenda through Summer 197 The ISI program requirements for radiographic examination is the l

ASME B&PV Code,Section V and XI Article 2, 1977 Edition including Addenda through Summer 1979, however, the inspectors review of the procedure did not identify any technical requirement that would not meet the 1977 Code. The licensee should update the scope of the document to include the 1974 Construction Code and the 1977 ISI 10 year interval Code prior to its use in the progra (2) Paragraph 3.0, entitled, " Equipment, Materials and Personnel,"

should describe the method used to determine actual effective source size. Attachment 1 (Radiographic-Technique Sheet), depicts the actual source size being derived from a formula. However, the radiographic procedure does not identify the values to be used in

,

the formula.

. (3) Paragraph 4.6.2 has a typographical error that changed the acceptance criteria for geometrical unsharpness from .070 inch to

.70 inch for material thicker than 4 inches. A Boiling Water Reactor like Grand Gulf, however, does not have materials thicker than 4 inches with the exception of some portions of the reactor

vessel.

.

'

The inspector iJentified the above administrative concerns as Inspector Followup Item 416/86-33-01, Administrative Corrections Needed for Radiographic Procedure No. M-RT-XG-2, Revision Within the areas examined, no violations or deviations were identifie . - -- - - - .- _ . - -

. ..

.

..

.

e Inservice Inspection - Observation of Work and Work Activities (73753)

(Unit 1)

The inspector observed the ISI activities described below to determine whether these activities were being performed in accordance with regulatory requirements and licensee procedure See paragraph 5 above for the

applicable cod Examiner Qualification ,

.

The inspector reviewed the qualification documentation for the below

'

listed examiners in the following areas: employer's name; person certified; activity qualified to perf;.n; effective period of certifi-i cation; signature of employer's designated representatives; basis used for certification; and annual visual acuity, color vision examination and periodic recertification.

4 Examiner Method Level I

T. White UT II P. Ramsey UT III A. Clay UT III R. Anderson UT II F. Witherspoon UT II S. Whiddon UT II M. Sessoms UT II R. Lindeman UT III B. Dummer UT II In process ultrasonic examinations (UT) of the recirculation system 12 inch diameter riser pipe welds listed below were observed by the i

inspecto The examination of these welds was conducted by General Electric using SMART automated ultrasonic syste Weld N Component Configuration Calibration Sheet No.

>

G-11-8206A Elbow to Pipe 862012/862011 G-001-U40 Pipe to Safe-end 862507 G-11-B231-B Elbow to Pipe 862505

,

The abcve UT examinations including calibrations were compared with the l requirements of the applicable procedure and code in the following

'

areas:

-

Availability of and compliance with approved NDE procedures

-

Use of knowledgeable NDE personnel

-

Use of NDE personnel qualified to the proper level

,

-

Recording of inspection results

.

I

-

.

e t- e -.--.i-,- iy-e- se------,.y a _.-y--%,#1,. --T,.-e- y-,4- - -wr-,--,- ----y y 17--.9-- --w-,,,-9-yw---- -pw w w, y g---

(')..

!

, e .-

-

.

'

. ..

,

'

!

! -

Type of apparatus used

--

Extent of coverage of weldment

-~ Calibration requirements

-

Search unit

!

-

Beam angles

-

DAC curves

-

Reference level for monitoring discontinuities

-

Method of demonstration of penetration

-

Limits of evaluating and recording indications

-

Recording significant indications

-

Acceptance limits In process UT calibration and crawler positioning for reactor vessel circumferential weld A-B was observed by the inspecto The UT

] examination of this vessel weld was performed with an automated remote ultrasonic system which presents the data in a digitize for This system is normally referred to as the GE Blue Boy System. The name has

been derived from the enclosure that houses the system. The six l

channel calibrations were compared with the requirements of the

applicable procedure and code as described in paragraph b. abov Within the areas examined, no violation or deviations was identifie . Inservice Inspection, Data Review and Evaluation, Unit 1 (73755) l

~

The inspector reviewed UT data which included computer disc and VCR tapes

! that had been evaluated by GE examiner However, this data was not j considered completed data since GE's evaluation required in many situations that ~ supplemental examinations be performed. The inspector reviewed the j data to ascertain whether the methods, techniques and extent of the examina-

{- tion complied with the ISI plan and applicable NDE procedures; findings were

! properly evaluated by qualified personnel; and programmatic deviations were recorded as required. Records for the following welds were reviewed:

}

Weld N System Size Evaluation Status

,

G11-8206A Recirculation 12" Dia Requires Further

,

Evaluation Utilizing Manual UT i

G11-A26-B Recirculation 12" Dia Requires Further

Evaluation Utilizing j Manual UT G11-8282-A Recirculation 12" Dia Requires Further

-

Evaluation Utilizing 1 Manual UT i

G-11-A51-B Recirculation 12" Dia Requires Further Evaluation Utilizing Manual UT

-

f

.

-

, -_ . _ . , ,. _..__ - . - - - . - _ _ - - - . _ - . - -

'

I :,l . ..

.

. ..

G11-8333-A Recirculation 12" Dia Satisfactory b

G11-A102-A Recirculation 12" Dia Satisfactory G11-A26-A Recirculation 12" Dia Satisfactory G11-B257-B Recirculation 12" Dia Satisfactory A-B Reactor Vessel 100?; Satisfactory Weld Nozzle B3-8 Vessel to Nozzle 100?; Satisfactory Within this area of examination, no violation or deviations was identified.

!

i

!

l

!

,

!

!

!