Forwards Comments on Facility Restart Program Plan, Submitted on 861007.Requests Response to Comments within 30 Days,Per 870227 Telcon
ML20207T530
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/03/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8703240103
Download: ML20207T530 (2)


Text

l o6 /

A a pagy *#

Tennessee Valley Authority (AfiN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

NRC COMMENTS TO BROWNS FERRY UNIT 2 RESTART TEST PROGRAM PLAN Enclosed are our comments to the Browns Ferry Unit 2 Restart Test Program Plan which was submitted to us by you in a letter dated October 7,1986. As a general comment, we note that the elements provided in your plan are broad in scope and are guidance from which the Restart Test Program will be developed.

Further, we request that you respond to our detailed comments within 30 days as agreed by a telephone conversation on February 27, 1987, between M. May of your staff and A. Ignatonis of my staff. Your prompt response to our informa-tion request will better accommodate your development and our inspection l planning schedules for this effort.

)

Should you have any questions concerning this letter, please contact us.

Sincerely, CANNNAL sl0NED BY 04RY G. 2ECH Gary G. Zech, Assistant Director, Regional Inspections DivisionofTVAProjects OfficeofSpecialProjects

Enclosure:

Comments to Browns Ferry Unit 2 Restart Test Program Plans cc w/ enc 1

6K P. Poorehn, Site Director Browns Ferry Nuclear Plant (R'. L. Gridley, Olrector Nuclear Safet V. W. Cantrell,y and LicensingActing Director 1

M.fuclear J. May,Engineering Site Licensing Manager bec w/ enc 1:

I LJT Keppler, OSP OSP iS; Ebneter,i, OSP J; Zwolinsk iBkLlaw,OSP OIA J.Connellyl K. Barr, Ri l lNRCResidentInspector i NRC Document control Desk l

-l '

State of Alabama

(,0 (

Algnatonis g32%

p

[5 0 l

l 3/JA/87 il E- " " "

. .o MAR ~ 31987 ENCLOSURE Browns ferry Unit 2 Restsrt Test Program Plan Comments:

1. Provide the documentation and the bases that will be used for declaring systems operable that:

will not be included in the Restart Test Program Plan will not have a system test specification developed recolve minimal or no testing

2. Section !! A lists plant systems for which test specifications will be written; provide justification for not including ECCs initiation signals and the automatic depressurization system.
3. The establishment of those administrative controls which will be used to conduct the test program and document test results are not well defined in your RTP plan. The program should address, in sufficient detall, attributes that are spec' flCally germain to a test program. Exampics of these are, but not Ilmited to: ,

1 test organization I preparation review and approval of test documents and test results interface between licensee organization controls for handling test interruptions, test discrepancies, corrective actions, test requirements existing plant administrative controls that will be applicable to the restart test program controls for scheduling test activities 1