ML20207H738

From kanterella
Jump to navigation Jump to search
Forwards Reactive Physical Security Insp Rept 50-341/86-37 on 861201-04 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR73.21)
ML20207H738
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20207H743 List:
References
NUDOCS 8701080080
Download: ML20207H738 (2)


See also: IR 05000341/1986037

Text

N

VMS

.

0o. -n.,,%n . . . . _ ,

v

DEC 31 1986

Docket No. 50-341

The Detroit Edison Company

ATTN: B. Ralph Sylvia

Group Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the Reactive Physical Security inspection conducted by

Messrs. T. J. Madeda, J. L. Belanger, and J. R. Kniceley of this office

on December 1-4, 1986, of activities at the Enrico Fermi Atomic Power Plant,

Unit 2, authorized by NRC Operating License No. NPF-43 and to the discussion

of our findings with Mr. F. Agosti and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure

to this letter, our report of the inspection, and your response to the

violation identified in the enclosure to this letter will not be placed in

the NRC Public Document Room. Therefore, your statement of corrective action

regarding the violation identified in the enclosure should be submitted as

a separate enclosure to your transmittal letter in the manner prescribed.

We will gladly discuss any questions you have concerning this inspection.

G*

&

8701030080 861231

PDR ADOCK 05000341

O PDR

Enclosure contains

SAFEGUARDS INFORMATION

Upon separation this

-... ce is Decontrolled

n \n -< nn,

LU M it L/ y ug

s

. .

_

-

...mny g g3, e

Sn. -tT OU/m ud ou v. . . . . .

The Detroit Edison Company 2

DEC 31 19P6

The responses directed by this letter and the accompanying Notice

are not subject to the clearance procedures of the Office of Management

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

l Sincerely,

W.lL. Axel son, Chief

Nuclear Materials Safety and

Safeguards Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-341/86037(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosures:

J. E. Conen, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/PWR-B/SSPB

ACRS

cc w/ enclosures, w/o

UNCLASSIFIE0 SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

l Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voight, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of Enclosure contains

Civil Preparedness SAFEGUARDS INFORMATION

Upon separation this

page is Decontrolled

(

,

RIII RIII RIII RIII III

i

gchk#

Madeda/ib

RIII @

Belanger

yd

Kniceley

h

Creeb

ud

AxR;on

t

Wrigh

WSW ( 2 [1tl86

q--...,- - - - my

l oiu muut u\ud li'il Ut\lvin a lUn