a-A U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-341/86037(DRSS)
Docket No. 50-341 License No. NPF-43 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue Detroit, MI 48226 Facility Name: Enrico Fermi Atomic Power Plant Inspection At: Plant Site Inspection Conducted: December 1-4, 1986 Date of Previous Physical Security Inspection: September 22-25, 1986 Type of Inspection: Unannounced, Reactive Physical Security Inspection Inspectors:
hb b
IN'J N b
-
T. J. Madeda
Date
"
Physical Security Inspector 9 1. 04mps
/4/3 //BC J. L. Belangef Date Physical Security Inspector 12btb S @-
N J". R. Kniceley Date Physical Security Inspector Approved By:
3.1.O'24W/ M
/4/@/F(
J. _ R. Creed, Chfef Date Safeguards Section Inspection Summary Inspection on December 1-4, 1986 (Report No. 50-341/86037(DRSS))
Areas Inspected: Included Management Effectiveness; Security Organization; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers-Protected and Vital Area ; Access Control-Personnel, and Packages; Alarm Stations; Training and Qualifications; Safeguards Contingency Plan and Safeguards Information.
Review licensee progress on the implementation of their Nuclear Security Improvement Program (NSIP).
Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except for the following area: Compensatory Measures - Failure to adequately implement a compensatory measure at a degraded vital area portal.