ML20195E680

From kanterella
Jump to navigation Jump to search
Forwards Overview of Formal Training Program to Support Application for Dual Unit Licenses & Differences Between Units 1 & 2 Training Program for Licensed Operators,Per NRC Request Made at Dec 1987 Meeting
ML20195E680
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/11/1988
From: Bockhold G
GEORGIA POWER CO.
To: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20195B388 List:
References
NOT-01438, NOT-1438, NUDOCS 8811100229
Download: ML20195E680 (10)


Text

m; a 8:.+ ::~:a .

  • . : ,r ;;, a* c t
;+ E
s t;.

. . . . . "sL:r;: a 4;tN

..:e: ....';4. *4 c.4 !! 4 t H -

f -

A ver. pr.,.c gorgihe May 11,1988 Plant Vootle - Unite 1 42 Dual Unit Licenses Log: NOT-01438 Security Code: NC U. S. Nuclear Regulatory Commission Operations Branch Division of Reactor Safety Region II - Suite 2900 101 Marietta Street, FW Atlanta, Georgia 30323 Attention: Caudio A. Julian .

Gentlemen Georgia Power Company is supplying the information in this letter and its attachments as esquested by the NRC at the GPC -

NRC Region II meeting of December 1987. As discussed at the meeting, Gecrgia Power Company wall be applying for dual unit licenses for its operators licensed on unit i at ths Vogtle Electric Generating Plant in the fall of 1988.

Attachment I contains an overview of the formal training program to support the application for dual unit licenses.

Attachment 2 which have II contains tne differences between VEGP units 1 and been approved for inclusion in a differences training program for licensed operators.

Due to the limited number of differences and the nintaal operational effect of the differences. Georgia Power Company will request a waiver of both the written and operational (simulator and plant walkthroagh) exastnations for those licensed operators who complete the training program.

88111002P9 801 OPS PDR A DO':H ObOOO424 V PDH b

l t

~

l .

TO: U.S. Nuclear Regulatory Comalesion DATE: May 11, 1988 PAllE: 2 LOC: NOT-01438 If you have any questions regarding this letter or its a t tachterit s please contact Mr. Paul D. Rushton at (404) i 826-3301.

Sincerely, 7

l G. Acekhold, Jr. 1 General Manager WMW:PDR:kso A Ichsents 4

e

Attachment I Page 1 of 2 Description of VEGP Training Program for Conversion of Unit 1 Operator Licenses to Dual Unit Licenses In accordance with dual unit licensing requirements of NUREG 1021 and 10 CFR 55 VEGP will develop and present a formal training and evaluation program for candidates seeking conversion of a Operator License for Vogtle Unit 1 to a license for Vogtle Units 1 and 2.

The program will include differences training per NUREG 1021 section ES 106 cover,ing:

1. Facility Design and Systems Relevant to Contt*', Room Personnel
2. Technical Specifications
3. Procedures . Primarily Abnormal and Emergency Operating L Procedures
4. Control Room Design and Instrument Location
5. Operational Characteristics. '

Each candidate will participate in a program of approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br />, which will include classroom and in-plant instruction distributed within the:

1. VEGP Licensed Operator Requalification Program 12 Hours of classroom instruction cosering appropriate portions of the five NUREG 1021 topics and the effects of common systems failure with the appropriate oper tor  ;

response.

)

2. Unit 2 On-shift Assignment Program i
s. 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of Unit 2 control room training emphasizing the location and operation of Unit 2 controls, instruments .

and systems.

b. Completion of a plant walkthrough checklist covering Unit 2 and Common equipuent locations.

The training will include a written P. hour differences examination and a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in-plant walk-through examination covering appropriate portions of the five required topics for each candidate.

Approximately two-thirds of VEGP's 69 licensed operators will have completed this program by September 9 1989 and all will have taken at least one annual requalification examination during the 1986-1988 requalification program cycle.

Attachment I Page 2 of 2 Members of this group who have passed the differences training program and have passed the applicable requalification examination VIGP annual will submit license applications, with the appropriate waiver, Unit 1 - Unit 2 liconses. to convert their Unit 1 licenses to 1

1 4

t Attachment II Page 1 of 6 Engility Desinn ansi EY.111ga Relevant ta;t Control Rnsa and Onorational Characteristics -

Enrsonn.1

1. Boron Injection Tank (BIT) and The BIT Reciro System

Reference:

1X4DB119 2X4DB119 Description of Change:

not installed on Unit 2 while The BIT and BIT recirc system were disabled in place.

Unit 1 has the components i physical difference.

This is not an operating difference but The unit 2 high head injection valves i will use the same nomenclature (Bit Outlet Valves) as unit 1.  ;

2. Haste Evaporator

Reference:

DCN-6164 .

Description of Change: l The Unit 2 Waste Evaporator installation will not be completed.

3. Haste Monitor Tank Capacity

Reference:

DCH-6164 Description of Change:

gallon tanks designated asUnit 2 willtanks.

common have 2 additional 20.000 4

NSCH Fan Vibration Roset Switches

Reference:

DCR 87-V1E0261 ,

2X3BD-K03A,B.C.D.E.F.G. and H '

2X3D-BA-D03F l 2X3D-AA-F39A  !

Description of Change: Unit 2 will have a vibration trip L time delay and reset switches for the NSCW Tower Fans in the control room. Unit 1 may have them installed later, r

5. HSCH Aux Containment Cooler Isolation Yalves

Reference:

2X4DB135-1.135-2 l 2X3D-BD-K04L and M .

Description of Change: Unit 2 valves are l that the outlet valves must be opened first.

interlooked so When opening ,

the outlet valves they stroke for 3 seconds, wait for 60 seconds, and then finish stroking open. This allowe the header to backfill. ,

t

6. HSCW High Point Vacuum Breakers

Reference:

1X4DB134 and 1X4DB135  !

2X4DB134 and 2X4DB135 Description of Change: Unit 2 has added Vacuum breakers to the High points in the NSCH Systeme. Unit 1 has no plans to t incorporate the change.

7. Heater Drain Pumps

Reference:

2X4DB163-3 and 163-4 1 Description of Change: Valves 2-1310-X4-521 and 522 were added on unit 2 to allow warm up of the heater drain pumps  !

prior to placing them in service to reduce thermal shock.

Attachment II

. Page 2 of 6

8. Diesel Generator System

Reference:

1X4DB170-1 und 2 2X4DB170-1 and 2 2X3D-BH-G02B Description of Change: The Unit 2 DG fuel oil transfer pumps have case aoflocal /rennto transfer switch to transfer control in a control room fire. The switch is located on the front of the breaker cubicle for the pump. This may have an impact on AOP 18038.

Reference:

DCR-87V1E0206 2X5DT0029 and 30 Description of Change: The fuel oil storage tank low level alarm setpoint was raised from 54 +/- 3.6 inches to 56 +/-

3.6 inches to allow more time for operator action.

will be changed in the future. Unit 1

Reference:

2X4DB170-1 and 2 Description of Change: Unit 2 has a drain line installed on the day tank so that the day tank can be drained back to the fuel oil storage tank.

i valve. The line has a lock closed isolation-

Reference:

ODR T-2-87-0034 and WHO 2-88-01663 Description of Change: Unit 2 has added orifices in the air logio system to allow the low lube oil pressure trip to be active during an emergency start coincident with a normal

, chutd ewn. Unit 1 has not made this change.

Rafarence: ODR T-2-87-00447 and WHO 2-88-00060 Description of Change: On unit 2 the syno, mode select switches turn in the opposite direction. They have been revised to make-up in the manual and auto positions as shown on elementaries and instruction manual bill of materials.

l No design change documents have been issued to make this '

s change in unit 1.

l i

Reference:

DR T-1-86-2118 Description of Change: The Unit 2 sequencers have a pushbutton to allow resetting of the sequencer reset

! sequencer fails to complete the required loading if the sequence.

' Unit i requires a circuit card to be palled to complete this task. This Change may have an impact on the EOPs. '

9, Auxiliary Building HVAC

Reference:

YFCRB-6471. DCR-87V1E0177 '

' 2X3D-BG-D02C F.L.P and S 2X5DN026-1 1 2X5DN050-1  !

2X4DB206-1 Description of Change: On a CVI signal the Unit 2 Auxiliary j Building HVAC units will trip to comply with FSAR 9.4.3.2.2.3  :

< l

Attachment II Page 3 of 6

10. CRDH Low Flow Alarm

Reference:

DCR-67V1E0297 2X3D-BO-B02A Description of Change: On unit 2 with less than 2 CRDH f ans running a low flow alarm will annunciate on ALB52E08. Unit 1 has deferred this change.

11. Control Building Electrical Penetration Filter Units

Reference:

1X4DB209 2X4DB209 Description of Change : The unit 2 electrical penetration filter units have been deleted. The unit i filter units will remain in service. ,

12. Main Feed Pump Seal Injection

Reference:

2X4DB168-2 Description of Change: Unit 2 HTP seal injection filters i have filter D/P indication that unit i doesn't.

13. RHR Hini-flow Orifices l

Reference:

Letter. Westinghouse to Bectel dated 12/10/85 l FSD-SS-GAI-4028, GP 10232. SO GAZ-280 l Description of Change: Unit 2 RHR mini-flow orifices are vi. sed smaller that the unit 1 orifices.

i

14. Aunnunciator Power Supplies

Reference:

NCE-02268 Description of Change: Unit 2 uses a different type of annunciator inverter which incorporates an automatic transfer between the AC/DC power supplies. Both Unit 1 and Unit 2 power supplies will auto swap from the primary AC to

the backup DC on a loss of primary power. Unit 2 power supplies will auto swap f rom the DC backup to primary AC when the primary power is available provided the source selector switch is in the AC position. On Unit 1, it le a manual operation to transfer from DC back to AC.
15. Condensate System

Reference:

MFCRA-4046 1 2X4D5165-1 2X4DB168-1 Description of Change: Fill and vent of the unit 2 condensate system will be by use of the condensate domin backwash pump -

using the CSTs as a water source. The water will enter the condensate system through a 12" flush connection on the condens ate pump discharge header. Unit one vill use the condensate pumps and the condenser as a water source.

l 1

i

_ _ . . _ - . - - - _ _ _ - - - ._ ~ - . _ _ _ _ . _ _ _ _ . - - _ _

c Attachment II Page 4 of 6 Technical Specificatient '

Anticipated Differences and/or Changes to be made to the Unit 1 Tech Specs when Common Tech Specs are issued

1. RTNDT Limits and Copper Content

Reference:

TS 3.4.9 page 3/4 4-30 Figure 3. 4-2 page 3/4 4-31

Description:

Unit i Values Unit 2 Values Actual Copper Content . 06 MT. 5 .05 MT 5 Actual Initial RTNDT 30 F 40 F TS will be revised to reflect unit 2.

2. Spray Additive Flowrates

Reference:

TS 4.6.2.2d page 3/4 6-14

Description:

Unit 1 Values Unit 2 Values Train A Eductor Flowrate 120 +/- 30 GPM Not Determined Train B Eductor Flowrate 130 +/- 30 GPM Not Determined

3. Piping Penetration Area Filtration System

Reference:

TS 3. 7. 7 and 4. 7. 7 page 3/4 7-17

Description:

Unit 1 Value Unit 2 Value -

Flow Rate Through HEPA Filter 15500 CFM Not Determined

4. Area Temperature Monitoring

Reference:

TS 3.7.10 page 3/4 7-27 Table 3.7-3 page 3/4 7-26

Description:

There will be new rooms associated with unit 2 added to table 3. 7-3.

5. Spent Fuel Storage Pools Capacity

Reference:

TS 5.6.3 page 5-5 i

Description:

East Pool (Unit 1) 936 fuel assemblies Nest Pool (Unit 2) 2006 fuel assemblies Both numbers are proposed, i

l a

Attachment II Page 5 of 6

~

P roced u res, Primarily Abnormal and Emergency Operating Procedures Limitad operational differences should exist in the EOPs and AOPs.

These differences may include:

1. A reference in the remote shutdown AOP regarding the remote operation of the unit 2 DG fuel oil transfer pumps.
2. Reference in the EOPs to the sequencer reset pushbutton.

Conten1 Ecss Damian and Instrument Lncationa Control Room Layout The Unit 2 Main Control Board (QMCB) is a rotated image of the Unit 1 Main Control Board. On sections A, B, and C of the Main Control Board the left-right relationship for all the controls and displays is identical. This identical relationship for the A, B, and C section includes the board layout and labeling.

The Control Room Design Review will note any differences this summer.

None are planned or expected.

The one exception to identical layout on the Main Control Board is the D section. The D section was a backfit after the control room design was completed and floor space did not allow identical arrangement. an Section D contains the same equipment on both units (RVLIS, PSMS, and Main Steam Bypass Isolation Valves).

Section D is on the left end of section A on unit 1 and to the right of section B on unit 2. This will require looking lef' unit 1 and right on unit 2 to verify that the Main Steam Bypass on Isolation Valves are shut on a Main Steam Isolation.

There should be no impact on routine unit operation.

The rest of the Unit 2 Control Boards appear as if the Unit 1 Boards were moved west. Their appearance on unit 2 will be the s ame as on unit 1 if you are standing in front of them. The Electrical Auxiliary Board (GEAB) will appear somewhat different from the center of the control room. In unit 1 it is over the right This willshoulder and in unit 2 it will be over the left shoulder.

require a slightly different scanning pattern during immediate operator action in the EOPs but should have no impact on unit oseration. The high voltage section of the QEAB is different to reflect the differences in the switchyards but the Unit 2 inplant distribution systems will appear identical Unit 1.

The common distribution system is on the Unit 1 QEAB.

The control boards will be different to the extent that most common equipment is located on unit one. The Process and Effluent Radiation Monitoring System Panel (PERMS) non-safety related communications console for unit 2 will be at the west end of the QIAB instead of the east end of the Relay Panel as it is on unit 1. See AX5D52-A02 ( Attached ) for the control room layout.

Attachment II 4

Page 6 of 6 Control Room Wall I A security wall was erected through the center of the common control room went into effect.

to separate unit 1 from unit 2 when unit 1 security Original plans were for this wall to be removed when unit 2 security went into effect. Current plans are to leave most of the wall to reduce separation, cost, provide unit and reduce inter-unit noise. The wall will be open i

on the Shift the QPCP, Supervisors station, near the south door, and behind Plant Computers The image plant computer (PROTEUS and ERF) terminals will be in mirror locations. The PROTEUS computer will be identical function. The IRT computer will be identical except that in the common radiation monitors and weather data only on unit 1. will be displayed Hanned Differences Valve and Instrument Labeling Program '

The valves and instruments located at the Vogtle Electric Generating Plant are labeled with unique labels unit number, that indicate of the valve system number. valve or instrument number, the name appropriate, or instrument indicating its purpose, the train if and any special notes about the component.

has white rectangular (3" X 4") labels and unit 2 has roundUnit 1 diameter) blue labels. (4" Operations Procedure Binders The lineupunit specifio procedure binders (system operating procedures.

procedures, operations surveillance procedures, etc.) are marked indicating which unit they belong to. Unit 1 procedures are marked large 2.

with a large 1 and unit 2 procedures are marked with a m

i