MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl ML20205H4051999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3891999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1).Page 2 in Third Amend Power Sales Contract of Incoming Submittal Not Included ML20205A9441999-03-25025 March 1999 Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d ML20205H3811999-03-24024 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3621999-03-22022 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81, as Requested IAW 10CFR50.75(f)(1) ML20204G4361999-03-18018 March 1999 Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Vegp,Iaw Requirements of 10CFR50.54(w)(3) ML20204C0591999-03-17017 March 1999 Forwards Rev 0 to WCAP-15160, Evaluation of Pressurized Thermal Shock for Vegp,Unit 2 & Rev 0 to WCAP-15159, Analysis of Capsule X from Vegp,Unit 2 Reactor Vessel Radiation Surveillance Program ML20207K9551999-03-11011 March 1999 Forwards Response to Rai,Pertaining to Positive Alcohol Test of Licensed Operator.Encl Info Provided for NRC Use in Evaluation of Fitness for Duty Occurrence.Encl Withheld,Per 10CFR2.790(a)(6) ML20207L9721999-03-10010 March 1999 Forwards Rev 15 to EPIP 91104-C of Manual Set 6 of Vogtle Epips.Without Encl ML20207B0191999-02-25025 February 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 980701-1231,IAW 10CFR26.71(d) 05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 9812291999-01-27027 January 1999 Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 ML20199F7701999-01-13013 January 1999 Submits Revised Response to RAI Re Licensee 980713 Proposed Amend to Ts,Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Protection Channels. Corrected Copy of Table,Encl ML20199F7981999-01-13013 January 1999 Forwards Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage. Change Bar in Margin of Affected Pages Denotes Changes to Rept ML20199G1381999-01-13013 January 1999 Forwards Copy of Permit Renewal Application Package for NPDES Permit Number GA0026786,per Section 3.2 of VP Environ Protection Plan 05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.731999-01-13013 January 1999 Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 ML20198F6131998-12-18018 December 1998 Forwards Revised Certification of Medical Exam Form for License SOP-21147.Licensee Being Treated for Hypertension. Util Requests That Individual License Be Amended to Reflect Change in Status ML20198L6631998-12-18018 December 1998 Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21 ML20198D9291998-12-16016 December 1998 Forwards Requested Info Re Request to Revise TSs Elimination of Periodic Pressure Sensor Response Time Tests & Elimination of Periodic Protection Channel Response Time Tests ML20198D9991998-12-16016 December 1998 Forwards Responses to 980916 RAI Re Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations ML20198D8171998-12-14014 December 1998 Forwards NRC Form 396 & Form 398 for Renewal of License OP-20993.Without Encls ML20206N3051998-12-0808 December 1998 Submits RAI Re Replacement of Nuclear Instrument Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys 1999-09-20
[Table view] Category:UTILITY TO NRC
MONTHYEARELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam1990-09-0606 September 1990 Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam ELV-01599, Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator1990-09-0404 September 1990 Discusses Mods to HED-1114 Re Plant Dcrdr,Per . Amber Monitor Light Covers Installed for Spare Pumps to Make Status of Pumps Readily Apparent to Operator ELV-02059, Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B1990-08-30030 August 1990 Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B ELV-01956, Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request1990-08-30030 August 1990 Forwards Listed Documents in Response to Request for Addl Info Re Settlement Monitoring Program,Per 900614 Request ELV-02050, Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required1990-08-30030 August 1990 Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required ELV-02028, Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d)1990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for First Six Month Period,Per 10CFR26.71(d) ELV-02022, Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld1990-08-22022 August 1990 Forwards Revised LER Re Apparent Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld ELV-02027, Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively1990-08-20020 August 1990 Forwards Rev 0 to Core Operating Limits Rept, for Cycle 3, Per Amends 32 & 12 to Licenses NPF-68 & NPF-79,respectively ELV-01973, Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical1990-08-14014 August 1990 Submits Rept Re Results of Leakage Exams Conducted During Spring 1990 Refueling Outage,Per TMI Item III.D.1.1.None of Identified Leakage Considered Excessive.Work Orders Issued in Effort to Reduce Leakage to Level as Low Practical ELV-01918, Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion1990-08-0303 August 1990 Responds to NRC 900612 Request for Comments & Suggestions on Draft risk-based Insp Guide.Util Conducting Individual Plant Exam & Will Withhold Comment on risk-based Insp Guide Until Completion ELV-01943, Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned1990-07-27027 July 1990 Responds to Violation & Proposed Imposition of Civil Penalty in Insp Repts 50-424/90-11 & 50-425/90-11.Corrective Action: Complete Audit of Contents of Safeguards Info Container Performed & Unassigned Safeguards Info Dispositioned ELV-01949, Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable1990-07-26026 July 1990 Forwards Info Re Status of Pen Branch Fault Investigation. Investigations Conducted So Far Still Indicate That Pen Branch Fault Not Capable ELV-01500, Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities1990-07-25025 July 1990 Forwards Nuclear Decommissioning Funding Plan for Plant.Info Provides Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Facilities ML20055H6441990-07-23023 July 1990 Submits Summary of Snubber Types & Sample Plans for Functional Testing to Be Performed During Sept 1990 Outage ML20044B0311990-07-13013 July 1990 Forwards Vogtle Electric Generating Plant Unit 1 Reactor Containment Bldg 1990 Integrated Leakage Rate Test Final Rept. ML20044B1541990-07-12012 July 1990 Responds to NRC 900612 Ltr Re Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Eop Step Deviation Documents to Be Upgraded,Adding More Justification & Temporary Change Issued to Correct EOP Deficiencies ELV-01867, Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered1990-07-12012 July 1990 Responds to Violations Noted in Insp Repts 50-424/90-10 & 50-425/90-10.Corrective Action:Level Indication Error Corrected After Discrepancy Discovered ML20055F1651990-07-0909 July 1990 Forwards Comments Re NUREG-1410 ELV-01858, Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete1990-07-0606 July 1990 Advises That Full Compliance W/Violation Will Not Be Achieved Until Nov 1990,when Evaluation of VP-2693 Complete ML20044A8851990-07-0606 July 1990 Forwards Response to NRC Question on Steam Generator Level Instrumentation Setpoints,Per Revised Instrument Line Tap Locations.Tap Location Will Be Changed from Above Transition Cone to Below Transition Cone ELV-01834, Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21)1990-06-28028 June 1990 Forwards Response & Comments to Regulatory Effectiveness Review Rept.Encl Withheld (Ref 10CFR73.21) ML20044A2791990-06-25025 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Indicating Status of Each Generic Safety Issue Encl ML20043J0171990-06-22022 June 1990 Discusses Corrective Actions for Plant Site Area Emergency, Per 900514 Ltr.Jacket Water High Temp Switches Calibr for Diesel Generators,Using Revised Calibr Procedure ML20043H3061990-06-15015 June 1990 Forwards Rev 3 to ISI-P-014, Inservice Insp Program, for Review & Approval,Per Tech Spec 4.0.5 Re Surveillance Requirements.Rev Includes Withdrawal of Relief Requests RR-45,47,48 & 54 ML20043G2071990-06-12012 June 1990 Forwards Amend 18 to Physical Security & Contingency Plan. Amend Withheld (Ref 10CFR73.21) ML20043G1021990-06-0606 June 1990 Requests Temporary Waiver of Compliance from Requirements of Action Statement 27 of Tech Spec 3.3.2 for Period of 6 H When Two Operating Control Room Emergency Filtration Sys Trains Shut Down for Required Testing ML20043E6901990-06-0505 June 1990 Forwards Rev 12 to Emergency Plan & Detailed Description & Justification of Changes.W/O Rev ML20043G7651990-06-0505 June 1990 Forwards Rev 13 to Emergency Plan & Description & Justification of Changes ML20043B5991990-05-25025 May 1990 Forwards Scope & Objectives Re 1990 Annual Emergency Preparedness Exercise to Be Conducted on 900801 ML20043B5981990-05-24024 May 1990 Responds to Violations Noted in Insp Rept 50-424/90-05 on 900217-0330.Corrective Actions:Locked Valve Procedure Revised to Eliminate Utilization of Hold Tag on Valves Required by Tech Specs to Be Secured in Position ML20043B6291990-05-22022 May 1990 Forwards Rev 5 to ISI-P-008, Inservice Testing Program, Per Tech Specs 4.0.5 Re Surveillance Requirements & Generic Ltr 89-04 ML20043B6351990-05-22022 May 1990 Forwards Rev 2 to ISI-P-016, Inservice Testing Program, Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. ML20042H0601990-05-14014 May 1990 Forwards Summary of Corrective Actions for 900320 Site Area Emergency Due to Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability.Truck Driver Disciplined for Lack of Attention ML20042G7301990-05-11011 May 1990 Forwards Revised Pages for May 1989,Jan & Mar 1990 Monthly Operating Repts for Vogtle Electric Generating Plant,Units 1 & 2.Revs Necessary Due to Errors Discovered in Ref Repts ML20042E2911990-04-18018 April 1990 Forwards Amend 17 to Security Plan.Amend Withheld (Ref 10CFR2.790) ML20042E7481990-04-0909 April 1990 Requests Approval to Return Facility to Mode 2 & Subsequent Power Operation,Per 900320 Event Re Loss of Offsite Power Concurrent W/Loss of Onsite Emergency Diesel Generator Capability ML20012E9001990-03-28028 March 1990 Provides Supplemental Response to Station Blackout Rule,Per NUMARC 900104 Request.Mods & Associated Procedure Changes Identified in Sections B & C W/Exception of Mods to Seals Will Be Completed 1 Yr from Acceptance of Analysis ML20012E8581990-03-28028 March 1990 Suppls Response to NRC Bulletin 88-010,Suppl 1 Re Traceability Reviews on Molded Case Circuit Breakers Installed in safety-related Applications.All Breakers Procured & Installed in Class 1E Equipment Reviewed ML20012E9761990-03-27027 March 1990 Requests Withdrawal of Inservice Insp Relief Requests RR-45, RR-47,RR-48 & Conditional Withdrawal of RR-54 Based on Reasons Discussed in Encl,Per 900206 Conference Call ML20012D8561990-03-22022 March 1990 Submits Special Rept 1-90-02 Re Number of Steam Generator Tubes Plugged During 1R2.One of Four Tubes Exceeded Plugging Limit & Required Plugging.Remaining Three Tubes Plugged as Precautionary Measure.No Defective Tubes Detected ML20012D6641990-03-22022 March 1990 Provides Followup Written Request for Waiver of Compliance to Make Tech Spec 3.04 Inapplicable to Tech Spec 3.8.1.2 to Permit Entry Into Mode 5 W/Operability of Diesel Generator a & Associated Load Sequencer Unverified ML20012D3681990-03-19019 March 1990 Forwards Proprietary & Nonproprietary Suppl 2 to WCAP-12218 & WCAP-12219, Supplementary Assessment of Leak-Before-Break for Pressurizer Surge Lines of Vogtle Units 1 & 2, Per 900226 Request.Proprietary Rept Withheld (Ref 10CFR2.790) ML20012D3401990-03-19019 March 1990 Submits Response to 891121 Request for Addl Info Re Settlement Monitoring Program.Current Surveying Procedures Used by Plant to Monitor Settlement of Major Structures Outlined in Procedure 84301-C.W/41 Oversize Drawings ML20012D6631990-03-15015 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in Lwrs.Overfill Protection Sys Sufficiently Separate from Control Portion of Main Feedwater Control Sys & Not Powered from Same Source ML20012C4681990-03-0606 March 1990 Provides Summary Rept of Property Damage Insurance Levels, Per 10CFR50.54(w)(1) ML20012B2891990-03-0606 March 1990 Forwards Plant Pipe Break Isometrics,Vols 1 & 2 & Advises That Encl Figures Have Been Revised to Be Consistent W/Pipe Analysis in Effect at Time That Unit 2 Received Ol,Including Revs Through 890930.W/309 Oversize Figures ML20012B2421990-03-0606 March 1990 Forwards Cycle 3 Radial Peaking Factor Limit Rept & Elevation Dependent Peaking Factor Vs Core Height Graph ML20011F5291990-02-26026 February 1990 Withdraws 881107 Proposed Amend to Tech Spec 3.8.1.1, Revising Action Requirements for Inoperable Diesel Generator to Clarify Acceptability of Air Roll Tests on Remaining Operable Diesel Generator ML20011F5261990-02-26026 February 1990 Forwards 1989 Annual Rept - Part 1. Part 2 Will Be Submitted by 900501 ML20011E8911990-02-12012 February 1990 Advises That Hh Butterworth No Longer Employed by Util 1990-09-06
[Table view] |
Text
m; a 8:.+ ::~:a .
- ;+ E
- s t;.
. . . . . "sL:r;: a 4;tN
..:e: ....';4. *4 c.4 !! 4 t H -
f -
A ver. pr.,.c gorgihe May 11,1988 Plant Vootle - Unite 1 42 Dual Unit Licenses Log: NOT-01438 Security Code: NC U. S. Nuclear Regulatory Commission Operations Branch Division of Reactor Safety Region II - Suite 2900 101 Marietta Street, FW Atlanta, Georgia 30323 Attention: Caudio A. Julian .
Gentlemen Georgia Power Company is supplying the information in this letter and its attachments as esquested by the NRC at the GPC -
NRC Region II meeting of December 1987. As discussed at the meeting, Gecrgia Power Company wall be applying for dual unit licenses for its operators licensed on unit i at ths Vogtle Electric Generating Plant in the fall of 1988.
Attachment I contains an overview of the formal training program to support the application for dual unit licenses.
Attachment 2 which have II contains tne differences between VEGP units 1 and been approved for inclusion in a differences training program for licensed operators.
Due to the limited number of differences and the nintaal operational effect of the differences. Georgia Power Company will request a waiver of both the written and operational (simulator and plant walkthroagh) exastnations for those licensed operators who complete the training program.
88111002P9 801 OPS PDR A DO':H ObOOO424 V PDH b
l t
~
l .
TO: U.S. Nuclear Regulatory Comalesion DATE: May 11, 1988 PAllE: 2 LOC: NOT-01438 If you have any questions regarding this letter or its a t tachterit s please contact Mr. Paul D. Rushton at (404) i 826-3301.
Sincerely, 7
l G. Acekhold, Jr. 1 General Manager WMW:PDR:kso A Ichsents 4
e
Attachment I Page 1 of 2 Description of VEGP Training Program for Conversion of Unit 1 Operator Licenses to Dual Unit Licenses In accordance with dual unit licensing requirements of NUREG 1021 and 10 CFR 55 VEGP will develop and present a formal training and evaluation program for candidates seeking conversion of a Operator License for Vogtle Unit 1 to a license for Vogtle Units 1 and 2.
The program will include differences training per NUREG 1021 section ES 106 cover,ing:
- 1. Facility Design and Systems Relevant to Contt*', Room Personnel
- 2. Technical Specifications
- 3. Procedures . Primarily Abnormal and Emergency Operating L Procedures
- 4. Control Room Design and Instrument Location
- 5. Operational Characteristics. '
Each candidate will participate in a program of approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br />, which will include classroom and in-plant instruction distributed within the:
- 1. VEGP Licensed Operator Requalification Program 12 Hours of classroom instruction cosering appropriate portions of the five NUREG 1021 topics and the effects of common systems failure with the appropriate oper tor ;
response.
)
- 2. Unit 2 On-shift Assignment Program i
- s. 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of Unit 2 control room training emphasizing the location and operation of Unit 2 controls, instruments .
and systems.
- b. Completion of a plant walkthrough checklist covering Unit 2 and Common equipuent locations.
The training will include a written P. hour differences examination and a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in-plant walk-through examination covering appropriate portions of the five required topics for each candidate.
Approximately two-thirds of VEGP's 69 licensed operators will have completed this program by September 9 1989 and all will have taken at least one annual requalification examination during the 1986-1988 requalification program cycle.
Attachment I Page 2 of 2 Members of this group who have passed the differences training program and have passed the applicable requalification examination VIGP annual will submit license applications, with the appropriate waiver, Unit 1 - Unit 2 liconses. to convert their Unit 1 licenses to 1
1 4
t Attachment II Page 1 of 6 Engility Desinn ansi EY.111ga Relevant ta;t Control Rnsa and Onorational Characteristics -
Enrsonn.1
- 1. Boron Injection Tank (BIT) and The BIT Reciro System
Reference:
1X4DB119 2X4DB119 Description of Change:
not installed on Unit 2 while The BIT and BIT recirc system were disabled in place.
Unit 1 has the components i physical difference.
This is not an operating difference but The unit 2 high head injection valves i will use the same nomenclature (Bit Outlet Valves) as unit 1. ;
- 2. Haste Evaporator
Reference:
DCN-6164 .
Description of Change: l The Unit 2 Waste Evaporator installation will not be completed.
- 3. Haste Monitor Tank Capacity
Reference:
DCH-6164 Description of Change:
gallon tanks designated asUnit 2 willtanks.
common have 2 additional 20.000 4
NSCH Fan Vibration Roset Switches
Reference:
DCR 87-V1E0261 ,
2X3BD-K03A,B.C.D.E.F.G. and H '
2X3D-BA-D03F l 2X3D-AA-F39A !
Description of Change: Unit 2 will have a vibration trip L time delay and reset switches for the NSCW Tower Fans in the control room. Unit 1 may have them installed later, r
- 5. HSCH Aux Containment Cooler Isolation Yalves
Reference:
2X4DB135-1.135-2 l 2X3D-BD-K04L and M .
Description of Change: Unit 2 valves are l that the outlet valves must be opened first.
interlooked so When opening ,
the outlet valves they stroke for 3 seconds, wait for 60 seconds, and then finish stroking open. This allowe the header to backfill. ,
t
- 6. HSCW High Point Vacuum Breakers
Reference:
1X4DB134 and 1X4DB135 !
2X4DB134 and 2X4DB135 Description of Change: Unit 2 has added Vacuum breakers to the High points in the NSCH Systeme. Unit 1 has no plans to t incorporate the change.
- 7. Heater Drain Pumps
Reference:
2X4DB163-3 and 163-4 1 Description of Change: Valves 2-1310-X4-521 and 522 were added on unit 2 to allow warm up of the heater drain pumps !
prior to placing them in service to reduce thermal shock.
Attachment II
. Page 2 of 6
- 8. Diesel Generator System
Reference:
1X4DB170-1 und 2 2X4DB170-1 and 2 2X3D-BH-G02B Description of Change: The Unit 2 DG fuel oil transfer pumps have case aoflocal /rennto transfer switch to transfer control in a control room fire. The switch is located on the front of the breaker cubicle for the pump. This may have an impact on AOP 18038.
Reference:
DCR-87V1E0206 2X5DT0029 and 30 Description of Change: The fuel oil storage tank low level alarm setpoint was raised from 54 +/- 3.6 inches to 56 +/-
3.6 inches to allow more time for operator action.
will be changed in the future. Unit 1
Reference:
2X4DB170-1 and 2 Description of Change: Unit 2 has a drain line installed on the day tank so that the day tank can be drained back to the fuel oil storage tank.
i valve. The line has a lock closed isolation-
Reference:
ODR T-2-87-0034 and WHO 2-88-01663 Description of Change: Unit 2 has added orifices in the air logio system to allow the low lube oil pressure trip to be active during an emergency start coincident with a normal
, chutd ewn. Unit 1 has not made this change.
Rafarence: ODR T-2-87-00447 and WHO 2-88-00060 Description of Change: On unit 2 the syno, mode select switches turn in the opposite direction. They have been revised to make-up in the manual and auto positions as shown on elementaries and instruction manual bill of materials.
l No design change documents have been issued to make this '
s change in unit 1.
l i
Reference:
DR T-1-86-2118 Description of Change: The Unit 2 sequencers have a pushbutton to allow resetting of the sequencer reset
! sequencer fails to complete the required loading if the sequence.
' Unit i requires a circuit card to be palled to complete this task. This Change may have an impact on the EOPs. '
9, Auxiliary Building HVAC
Reference:
YFCRB-6471. DCR-87V1E0177 '
' 2X3D-BG-D02C F.L.P and S 2X5DN026-1 1 2X5DN050-1 !
2X4DB206-1 Description of Change: On a CVI signal the Unit 2 Auxiliary j Building HVAC units will trip to comply with FSAR 9.4.3.2.2.3 :
< l
Attachment II Page 3 of 6
- 10. CRDH Low Flow Alarm
Reference:
DCR-67V1E0297 2X3D-BO-B02A Description of Change: On unit 2 with less than 2 CRDH f ans running a low flow alarm will annunciate on ALB52E08. Unit 1 has deferred this change.
- 11. Control Building Electrical Penetration Filter Units
Reference:
1X4DB209 2X4DB209 Description of Change : The unit 2 electrical penetration filter units have been deleted. The unit i filter units will remain in service. ,
- 12. Main Feed Pump Seal Injection
Reference:
2X4DB168-2 Description of Change: Unit 2 HTP seal injection filters i have filter D/P indication that unit i doesn't.
- 13. RHR Hini-flow Orifices l
Reference:
Letter. Westinghouse to Bectel dated 12/10/85 l FSD-SS-GAI-4028, GP 10232. SO GAZ-280 l Description of Change: Unit 2 RHR mini-flow orifices are vi. sed smaller that the unit 1 orifices.
i
- 14. Aunnunciator Power Supplies
Reference:
NCE-02268 Description of Change: Unit 2 uses a different type of annunciator inverter which incorporates an automatic transfer between the AC/DC power supplies. Both Unit 1 and Unit 2 power supplies will auto swap from the primary AC to
- the backup DC on a loss of primary power. Unit 2 power supplies will auto swap f rom the DC backup to primary AC when the primary power is available provided the source selector switch is in the AC position. On Unit 1, it le a manual operation to transfer from DC back to AC.
- 15. Condensate System
Reference:
MFCRA-4046 1 2X4D5165-1 2X4DB168-1 Description of Change: Fill and vent of the unit 2 condensate system will be by use of the condensate domin backwash pump -
using the CSTs as a water source. The water will enter the condensate system through a 12" flush connection on the condens ate pump discharge header. Unit one vill use the condensate pumps and the condenser as a water source.
l 1
i
_ _ . . _ - . - - - _ _ _ - - - ._ ~ - . _ _ _ _ . _ _ _ _ . - - _ _
c Attachment II Page 4 of 6 Technical Specificatient '
Anticipated Differences and/or Changes to be made to the Unit 1 Tech Specs when Common Tech Specs are issued
- 1. RTNDT Limits and Copper Content
Reference:
TS 3.4.9 page 3/4 4-30 Figure 3. 4-2 page 3/4 4-31
Description:
Unit i Values Unit 2 Values Actual Copper Content . 06 MT. 5 .05 MT 5 Actual Initial RTNDT 30 F 40 F TS will be revised to reflect unit 2.
- 2. Spray Additive Flowrates
Reference:
TS 4.6.2.2d page 3/4 6-14
Description:
Unit 1 Values Unit 2 Values Train A Eductor Flowrate 120 +/- 30 GPM Not Determined Train B Eductor Flowrate 130 +/- 30 GPM Not Determined
- 3. Piping Penetration Area Filtration System
Reference:
TS 3. 7. 7 and 4. 7. 7 page 3/4 7-17
Description:
Unit 1 Value Unit 2 Value -
Flow Rate Through HEPA Filter 15500 CFM Not Determined
- 4. Area Temperature Monitoring
Reference:
TS 3.7.10 page 3/4 7-27 Table 3.7-3 page 3/4 7-26
Description:
There will be new rooms associated with unit 2 added to table 3. 7-3.
- 5. Spent Fuel Storage Pools Capacity
Reference:
TS 5.6.3 page 5-5 i
Description:
East Pool (Unit 1) 936 fuel assemblies Nest Pool (Unit 2) 2006 fuel assemblies Both numbers are proposed, i
l a
Attachment II Page 5 of 6
~
P roced u res, Primarily Abnormal and Emergency Operating Procedures Limitad operational differences should exist in the EOPs and AOPs.
These differences may include:
- 1. A reference in the remote shutdown AOP regarding the remote operation of the unit 2 DG fuel oil transfer pumps.
- 2. Reference in the EOPs to the sequencer reset pushbutton.
Conten1 Ecss Damian and Instrument Lncationa Control Room Layout The Unit 2 Main Control Board (QMCB) is a rotated image of the Unit 1 Main Control Board. On sections A, B, and C of the Main Control Board the left-right relationship for all the controls and displays is identical. This identical relationship for the A, B, and C section includes the board layout and labeling.
The Control Room Design Review will note any differences this summer.
None are planned or expected.
The one exception to identical layout on the Main Control Board is the D section. The D section was a backfit after the control room design was completed and floor space did not allow identical arrangement. an Section D contains the same equipment on both units (RVLIS, PSMS, and Main Steam Bypass Isolation Valves).
Section D is on the left end of section A on unit 1 and to the right of section B on unit 2. This will require looking lef' unit 1 and right on unit 2 to verify that the Main Steam Bypass on Isolation Valves are shut on a Main Steam Isolation.
There should be no impact on routine unit operation.
The rest of the Unit 2 Control Boards appear as if the Unit 1 Boards were moved west. Their appearance on unit 2 will be the s ame as on unit 1 if you are standing in front of them. The Electrical Auxiliary Board (GEAB) will appear somewhat different from the center of the control room. In unit 1 it is over the right This willshoulder and in unit 2 it will be over the left shoulder.
require a slightly different scanning pattern during immediate operator action in the EOPs but should have no impact on unit oseration. The high voltage section of the QEAB is different to reflect the differences in the switchyards but the Unit 2 inplant distribution systems will appear identical Unit 1.
The common distribution system is on the Unit 1 QEAB.
The control boards will be different to the extent that most common equipment is located on unit one. The Process and Effluent Radiation Monitoring System Panel (PERMS) non-safety related communications console for unit 2 will be at the west end of the QIAB instead of the east end of the Relay Panel as it is on unit 1. See AX5D52-A02 ( Attached ) for the control room layout.
Attachment II 4
Page 6 of 6 Control Room Wall I A security wall was erected through the center of the common control room went into effect.
to separate unit 1 from unit 2 when unit 1 security Original plans were for this wall to be removed when unit 2 security went into effect. Current plans are to leave most of the wall to reduce separation, cost, provide unit and reduce inter-unit noise. The wall will be open i
on the Shift the QPCP, Supervisors station, near the south door, and behind Plant Computers The image plant computer (PROTEUS and ERF) terminals will be in mirror locations. The PROTEUS computer will be identical function. The IRT computer will be identical except that in the common radiation monitors and weather data only on unit 1. will be displayed Hanned Differences Valve and Instrument Labeling Program '
The valves and instruments located at the Vogtle Electric Generating Plant are labeled with unique labels unit number, that indicate of the valve system number. valve or instrument number, the name appropriate, or instrument indicating its purpose, the train if and any special notes about the component.
has white rectangular (3" X 4") labels and unit 2 has roundUnit 1 diameter) blue labels. (4" Operations Procedure Binders The lineupunit specifio procedure binders (system operating procedures.
procedures, operations surveillance procedures, etc.) are marked indicating which unit they belong to. Unit 1 procedures are marked large 2.
with a large 1 and unit 2 procedures are marked with a m
i