Responds to Violations Noted in Insp Rept 50-424/90-05 on 900217-0330.Corrective Actions:Locked Valve Procedure Revised to Eliminate Utilization of Hold Tag on Valves Required by Tech Specs to Be Secured in Position
ML20043B598
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/24/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-01675, ELV-1675, NUDOCS 9005300262
Download: ML20043B598 (3)


Text

. .

N '% ' Acorgia Pcmor Company

' 333 Pie:dmont Amnue $

t

  • * ' ' twanta. Georita 30308 Totephone 404 5%3195

, Mahng Atkkets

. 40 inverness Center Parkwtiy Post 01fice Box 1295 .

i Bamingham, Alatiama 3520t ,

Telephor* 205 BGB 5581 -[

May 24, 1990 t'wem*o< se'"

W. O. Hairston, til

[

Senior Vce Presicient Nuclear Opornhons .

L ELV-01675  :

0391  ;

q Docket No. 50-424  :

U. S; Nuclear Regulatory Commission  !

. ATTN: Document Control Desk .

Washington, D.'C. 20555' Centlemen:

V0GTLE. ELECTRIC GENERATING PLANT F REPLY TO A-NOTICE OF' VIOLATION Pursuant to 10 CFR 2.201, Georgia Power Company (GPC) submits the enclosed o information in response to a violation identified in Inspection Report .

50-424/90-05 which concerns the inspection conducted by Mr. R.: F. Aiello .and-Mr.

R. D. Starkey of the NRC from February 17 - March 30,.1990. In the enclosure, '  !

transcription of the violation: precedes GPC's response.

Please contact this office if you have any questions.

Sincerely, Yh/l W. G. Hairston,'III i WGH,III/ JAB /gm ,

Enclosure:

Violation 50-424/90-05-01 ard GPC Response. '

xc: Georaia Power Comoany Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. R. M. Odom Mr. P. D. Rushton NORMS U. 'S. Nuclear Reculatory Commissign -!

Mr. S.. D. Ebneter, Regional Admir.istrator Mr. T. A.' Reed, Licensing Project Manager, NRR Mr. R. F. Aiello, Senior Resident Inspector, Vogtle

}

9005300262 900524 PDR O ADOCK 05000424 PDC

(( 0l Il/

/ r m ENCLOSURE V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 NRC NOTICE OF VIOLATION 50-424/90-05-01 AND GPC RESPONSE

" Technical Specification 3.4.1.4.2.c, requires that, in Mode 5 with reactor coolant loops not filled, Reactor Makeup Water Storage Tank discharge valves,  !

1-1208-U4-175,176,177, and 183 be closed and secured in position.'

Contrary to the above, on February 26,-1990, with Unit _1 in Mode 5 and RCS level I at 195 feet 5 inches, valve 1-1208-U4-176 was closed but was not mechanically
  • l secured in the closed position. 1 This a Severity Level. IV violation (Supplement I)".

t' RESPONSE TO VIOLATION 50-424/90-05-01 l'

Admission or Denial of the Violation:

~

l

~'

The violation occurred as-stated.

Reason for the Violation:

As stated in the Notice ~of Violation, Technical Specification 3.4.1.4.2.c r requires the- subject valve to be-closed and secured in- position. Similarly, Technical Specification (TS) 3.6.1.7 requires the 24-inch containment purge supply and exhaust isolation. valves .to be closed and sealed' closed. The bases t for TS 3.6.1.7 state that sealed closed isolation. valves are isolation' valves under administrative control to assure they cannot be inadvertently opened. The ,

administrative controls, which constituted the locked valve policy, permitted clearance " hold tags" to be utilized to-secure small vakes which cannot .

feasibly be locked. However, Surveillance Requirement 4.4.1.4.2.2 requires the-subject valve to be secured in position:by mechanical stops. Therefore, the administrative controls were less than adequate which resulted in the violation. '

Corrective Steos Which Have Been Taken and the Results Achieved:-

-The subject valve was wired in the closed position to provide a " mechanical stop" as required by Surveillance Requirement 4.4.1.4.2.2.

Corrective Steos Which Will Be Taken To Avoid Further Violations:-  !

To preclude any further violations, the following corrective steps will be-taken:-

o The-locked valve procedure will be revised by 9-15-90, to eliminate utilization of a " hold tag" on valves that are required by the Technical Specifications to be secured in position.

E-1-1

ENCLOSURE ~(CONTINUED)

V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 NRC NOTICE OF VIOLATION 50-424/90-05-01 AND GPC RESPONSE l-o A review of valves which are required by the Technical Specifications.to, i be secured will. be performed by 9-15-90 to ensure a' locking mechanism is  !

(- in place, t E o Any valve found by this review which is )resently secured by. hold tags-  !

and is required to be secured by the Tecinical Specifications will be.

provided with en appropriate locking mechanism.. This action will be .;

completed by- 9-15-90.

Date When Full Comoliance Will Be Achieved: [

Full compliance was achieved with- the crimping of a steel cable' through- the -  !

drilled holes in the valve handle'to mechanically secure the subject valve.:

s This was accomplished on February 26, 1990.