Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/05/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-01591, ELV-1591, NUDOCS 9006130287
Download: ML20043E690 (23)


Text

-.

J.:: As . .

.,. I e Georg;a Po*e' Company

. 333 Piedmorf. Avenue

' 2l,3

=

Adan:a. Georgia 30308 -

-o + Telephone 4Q4 526-3195

, '* Maling AccreW ' '

' 40 inverress Center Parkwa/

. Post Ot!>ce Boi 1295 -

B:r%ngham, A;abama 35201' Telephone 205 e68 5581 June 5, 1990 rwe - r-s v.-

W. G. Hairston, til -

Senior V,ce President .

Nuclear Operarons .

ELV-01591 0361  ;

Docket Nos. 50-424 50-425 ,

U.- S. Nuclear Regulatory Commission ATTN: . Document Control Desk Washington, D. C. 20555 .

I Gentlemen:  !

  1. V0GTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 12  !

l In accordance with 10 CFR 50.54(q), Georgia Power Company hereby submits L Revision'12 to' the Vogtle Electric Generating Plant Unit I and Unit 2. Emergency

} Plan (the ~ Plan).

L Revisicn 12 incorporates organizational changes, editorial changes, and updates to facilities, procedures, and documentation. Enclosure 1 provides a detailed

~

l description and justification of the individual changes. Enclosure 2 provides  ;

revision insertion instructions. The revised Plan pages are Enclosure 3.

L L In accordance with 10 CFR 50.4, two copies of Revision 12'are being sent to the i

NRC Region II Office, and one copy to the NRC Senior Resident Inspector at Plant Vogtl e. -

l Please contacts this office if you have any questions regarding this submittal.

Sincerel ,  ;

f flo d l . o W. G. Hairston, II W'GH,III/PAH/gm ll

Enclosures:

1. Description and Justification of Changes
2. Instructions for Incorporation
3. Revised Plan Pages  !

xc-(see next page) 90061302s7 900605 4 PDR ADOCK 0500 F

U. S. Nuclear Regulatory Commission ELV-01591 Paae Two f

xc: Georaia Power Comoany Mr. C. K. McCoy (w/o)

Mr. G. Bockhold, Jr.(w/o)

Mr. R. M. Odom (w/o)

Mr. P. D. Rushton (w/o)

NORMS (w/ encl.)

l U. S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator (w/2 encl.)

Mr. T. A.. Reed, Licensing Project Manager, NRR (w/o) ,

Mr. R. F. Aiello, Senior Resident inspector (w/l' encl.)

o t

i h

l l

i c

ENCLOSURE 1 1

J ..

DESCRIPTION AND JUSTIFICATION OF CHANGES i

s L

9 i'

l i

i l'

L i

  • R; vision 12 Emarg:ncy Plcn  ;
  • J D:scripti:n cnd Justification of Ch:nges Global changes i
1) Savannah River Plant and SRP have bien changed to Savannah River Site and_SRS throughout the plan.
2) The letter "C" for-common has been added to all procedure numbers throughout plan.

i

3) " Emergency Preparedness Supervisor (EPS)" to " Emergency Preparedness Coordinator (EPC)".
4) "On shif t operations supervisor" to "shif t superintendent".
5) Delete " Assistant plant operator".

Preface Page X Change " assembly areas" to " relocation centers".

Delete "(a hunting preserve)" af ter Cowden Plantation.

Page xi Change "will be" to "is".

-Figure vi Update to show drop in plant personnel from 5200 to 1200 and closing of Girard School. 204 from SSE Sector.

Section A - Assignment of Responsibilities Page A-1 Replace " developing, development and procurement" with Section A.1 " maintenance and continuing". Updates tense, editorial A-2 Add "(FE00)" - editorial

'Section B - Onsite Emergency Organization Page B Delete "when construction and startup activities have Section B.1 completed."

Replace "will be" with "are".

Change crew sizes to reflect 2 unit operation.

Page B-2 Change " Plant Manager" to " assistant general manager (AGM)

Section B.2.1 plant operations". Change " plant support manager" to

" Assistant general manager (ACM) plant support". Reflect new titles.

Page B-7 Add "when activated"; editorial.

Section 4 Page B-9 Change " executive" to " senior" vice president. '

Section 5 Organizational change.

Page B-10 Add "or General Office Operations Center",

top line V'

I

  • -~. c o' g _ _

. ,' S etien B - Onsite Emerg ncy Org*nization (C*nt'd)-

Table B-1-(Sheet 1 of 2)

Change operations supervisor to shift superintendent.

Delete assistant plant operator.

Change number of RO's on-shift from 1 to 3.

Change number of plant equipment operators on shift from 1 to 3.

Table B-1 (Sheet 2 of 2)

Change totals on shift from 20 to 22.

Note A change to unit to non po',er.

Note C change operations superintendent to shift superintendent.

Table B-2 Incorporate new format (see' insert)

Justification: Deletion of the primary and_ alternates for emergency positions reduces specificity. There is no need for primary and alternate positions since all are equally qualified. The emergency director position line of succession will not change due to NUREG 0654 requirements.

Emergency Director:(1) Add; General Manager nuclear support.

Justification: This is a senior position on the corporate-staff eligible to become Emergency _ Director after the EOF is activated.

(2) Title Changes: plant manager to AGM plant operations; plant sypport manager to AGM plant support.

EOF manager:

Replace " health physit superintendent" with " manager health physics and chemistry".

EOF support coordinator:

Title change from " manager general support" to " manager plant administration".

TSC manager: ,

Title changes same as ED above.

TSC support coordinator Title change f rom " administration supervisor"- to " senior specialists; senior document control operators; senior clerks".

d Engineerine supervisor:

Title change; " engineering support superintendent" to " manager engineering support".

Add; " manager engineering technical support".

.Teble B-2 (Ccnt'd)

=. . Operations Supervisor: 1 Delete "" Deputy manager of operations" as position has been eliminated.

Dosimetry team leader - Change to " dosimetry team"; editorial.

Communicators / recorders - Change to " communicators";' editorial.

Dosimetry team -

delete line, as these positions are now included in

" dosimetry team" from Sheet 1 of 2 of this table.

Figure B-2 Block in "0SC". Delete " assistant plant operators" as this position has been eliminated.

Figure B-3

1. Add "public information manager" reporting to emergency director.
2. In control room, delete " communicator" and "asssistant plant operators".

Figure B-4 Delete " security manager" as position as been eliminated from Corporate staff.

Delete " technical and licensing support manager" - duties have been assigned to engineering services manager per Appendix 7.

Section C - Emergency Response Support and Resources Page C-5 Next to last bullet at bottom of page, change: " nuclear

-security manager" to " manager nuclear security".

Last bullet, change; " plant engineering" to " engineering support".

Section D - Emergency Classification System Page D-2 Top of page, first paragraph:

Move following sentence to page D-10 " Refer to Chapter 15... a full analysis of each transient"..

editorial.

Page D Section D 2.2.2.b and e - editorial.

Table D-1 Delete "e.g., plant computer, safety parameter display Sheet 2 of 2 system".

Para. #12 Justification: Neither of these equipments are considered l

a significant loss of assessment capability as there are l back-up systems and indications for both systems. Also, i they are not required to be operational by technical specifications.

l l

. S ct1*n D - Emerg ncy C1"ssifiertien System (Cent'd)

. Figure D-8 Delete paragraph "3.. Containment atmosphere particulate, Iodine-or radiogas monitors increase more'than 1000 times normal reading......."

Justification - This is not'necessarily a good indicator of fuel clad failure as it is affected by RCS leak rate, i The criteria of 1000 times normal reading on radiation monitor instruments is for severe degradation in the control of radioactive materials and is included in-Table D-2 for an Alert.

Figure D-9 Para. A.2, add "50" before GPM. - correct error.

Section E - Notification Methods and Procedures Page E-1 First paragraph - editorial - reflects change of notification form.

Page E-2 First paragraph last line:

Change " site boundary" to " Owner Controller Area";

reason - accuracy.

Fourth paragraph:

Change " corporate duty officer" to "on call project manager" and " plant duty officer" to "vogtle duty manager", - title changes.

Page E-3 Section E.3 - editorial - reflects change of notification form.

Page E-4 Section E.4 - editorial.,

Page E-5 Section E.5 - editorial - reflects change of notification form.

Table E-1 Initial Notification System Normal Working Hours Sheet 1 of 2 Delete " site siren" - site siren is used for site evacuation.

Sheet 2 of 2 Delete " notification of plant management by plant telephone system (and beeper)".

Justification: - Plant Management is part of the protected area and Administration Building personnel and will be l notified by the PA system.

Title change - same as page E-2, fourth paragraph.

l Table E-2 Initial Notification System Backshift Hours Delete - 1) VEGP general manager

2) TSC manager
3) EOF manager
4) OSC manager l Justification: - Redundancy - these personnel are included in the emergency response personnel for recall by autodialer system and beeper system (Table E-2, sheet 2 of l: 2).

l 1

. Trblo E-2 Initial Notificatien Syste, B ekshif t !!!urs (C*nt'd)

~  ;

Title change - same as page E-2, fourth paragraph.

Delete " site siren" - same as Table E-1.  ;

Figure E-1 Replcce " Initial emergency message for DOE - SRP and South Carolina Agencies" with new updated form " Emergency Notification Message For State And Local Response Agencies".

Figure E-2 Replace with new revision of Form NRC 361.

Figure E_-3 Delete - not needed because updated Emergency E Notification form is used for initial and follow-up E-5 notifications to all state and local agencies.

Figure E-6 Delete - redundant - This information is presented in Table E-1 and Table E-2.

Section F - Emergency Communications, Page F-1 Section F.1.2 - First paragraph, last line:

Delete line "The Burke County Sheriff's dispatcher can......

Justification: While this statement is true, the other backup systems are adequate and this statement is unnecessary.

Page F-2 Section F.2.1 - editorial changes for clarification.

Section F.3 - move to page F-2 and delete pages F-2a and-F-2b, editorial.

Page F-5 Section 3, first bullet.

Change " control room" to " EOF" Reason: OSC is more likely to need to confer with EOF than control room.

Page F-5 Section 4,'first bullet; Add "0!'.C" Page F-6 Section F.6 Delete "VEGP ambulance service".

Reason: Service was discontinued after construction was completed on Unit 2.

Page F-7 Section F.9, first line; Change "TSC" to "HP or OSC" - update.

Table F-1 Add - 1. VEGP dial to Emergency News Center

2. Administrative Decision Link to SRS.

. S etien G=- Public Educetien rnd Informatien

. Page G Section G.2, third paragraph:

Correct titles of company spokespersons.

Section H - Emergency Facilities and Equipment' Page H-7 First bullet: change "SRP/VEGP response guide" to

" Savannah River Site Emergency Plan".

Page H-8 First line: change " backup EOF activation checklist" to

" facility layout".

Page H-18 Section H.5.2 - editorial Page H-19 Section H 6 - editorial ,

Figure H-3 ' Delete permanent wall between Dose Assessment Area and command center. This is to correct drawing error and is not a change to the facility.

Section I - Accident Assessment '

Page I-4 Second paragraph

, Delete paragraph "Section H of this plan describes the location of these procedures........ core damage 3' l assessment."

Reason: Do not need to explain where EPIP's are located.

Page I-4, 5&6 Section I.4 l'

Add new dose-aosessment program called V0GTLERAD I which is a Vogtle specific versics of the NRC MES0 RAD. Delete manual method and use VIBRANT as backup.

Reason: MES0 RAD is a more current dose projection code than VIBRANT which is based on IRDAM. The manual method is much too conservative and may grossly. overestimate off-site dose causing unnecessary concern and alarm.

There are numerous computers in the control building and TSC available to run either V0GTLERAD I or VIBRANT and therefore the manual method is not needed. The power to the 110V AC outlets in the TSC which power the dose assessment computer are provided back-up power from the Security Diesel.

i Page I-7 First paragraph:

Delete " respirators" Reason: Field monitoring teams will not be exposed to high levels of particulate air borne contamination for I

long periods of time, and therefore do not need to wear respirators. They will have KI available if needed. It is also unsafe, due to the restricted vision, to drive a vehicle while wearing a respirator.

I Other changes on this page are editorial.

'1

, S cti*n I - Accident Assissment-(Cent'd)

Page I-8 Add paragraph on how to determine when the plume has touched down which was deleted from page I-11.

Page I-10 editorial' changes other than section I.7 Section I.7 Replace entire section.

Reason: New philosophy on importance of dose assessment computer code predictions versus actual field monitoring data. Emphasis is now on field monitoring instead of computer code. MESORAD code calculates external doses using the semi-infinite cloud model, not submersion-in-a-finite - cloud model. ,

Table I-1 thru Table I-8 Delete these tables.

Justification: These tables are in the FSAR and Section I.4 has been changed to reference the FSAR instead of these tables.

Section K - Radiological Exposure Control Page K-3 Second paragraph:

Delete sentence, "TLDs will be read by delivery to the TLD laboratory within 4-12 hours after collection."

Reason: Redundant to previous sentence and TLDs may be read-on site, depending on need.

Third paragraph, second sentence Change " normal administrative" to "10CFR20".

Reason: HP supervisor may authorize-exposure up to 10CFR20. Only the emergency director can authorize in excess of 10CFR20 limits for special cases.

Section M - Recovery And Reentry Planning And Post-Accident Operations Page M-1 Section M.1.5 Change " State disaster coordinator" to " Emergency Management Agency".

Reason: Correct error.

Add " Manager" to Public Information - editorial.

Page M-3 Update titles.

Page M-4,5 Delete last paragraph of M-4 and all of page M-5.

Justification: Paragraph is redundant to previous paragraph. It is not necessary to explain in detail how to calculate population dose. VEGP does not have adequate l information to calculate populative dose for SRS. SRS is I fully capable of making this determination without assistance from VEGP other than supplying data.

l 1

1 l

o.

. S etien M - R'c*vrry And Re ntry Plenning And Post-Accid nt Op3rrtions (Cont'd) 1 Figure M-1 Update titles.

Section N - Exercise And Drills l

Page N-1 Section N.I.1 and N.1.2 .,

In para. 1, change "5" to "6" years.. In para. 2 change l

" midnight or between midnight and 6:00 a.m.", to "4:00 a.m." .

Justification: To be consistent with off-site 7 requirements as promo1 gated by FEMA Guidance Memorandum PR-1.

Page N-2 Section 2 - Fire Drills Delete reference to specific section of FSAR. - editorial.

Page N-3 Section 4 t

1. Delete reference to Procedure 91602 for evaluation form.
2. Change " plant manager" to " general manager nuclear plant"
3. Change " Nuclear Safety and Compliance Department" to "open item tracking program".  ;

Reason: Item 1 - to reduce specificity.

Item 2 - Update to actual practice. .

Item 3 - Nuclear Safety and Compliance Department has been eliminated from the plant organization.

1 Page N-4 Update titles.

Page N-6 Section N.4.2 Delete "or plant manager".

Section N.4.3 -

Change " action" to "open".

Page N-7 Delete last sentence and replace with new sentence.

Reason: The general manager is advised of the status of.

overdue open items during periodic management meeting.

Section 0 - Radiological Emergency Response Training Page 0-2 Third paragraph Change last sentence so that only the General Manager vice all managers, can receive credit for annual '

requalification by participating in an intergrated drill or annual exercise.

..'S*ction 0 - Radielegical'Emerg ncy R7spense Trrining (Cent'd)

Table 0-1 Sheet 2 of 3 1. Delete " core damage assessment" from management of radiological emergencies course.

Reason: Not necessary knowledge for facility.

managers and ED's.

2. Delete " manual" method from Offsite Dose Assessment Reason: Manual method is to be eliminated per change in Section I.4.

Table 0-2 Sheet 1 of 2 Delete SCBA training for the following positions:

TSC Manager, Engineering Supervisor (TSC), Maintenance 4 Supervisor (TSC), Operations Supervisor TSC), Health Physics Supervisor (TSC), Chemistry Supervisor (TSC),

Clerks, First Aid Team.

Justification: These personnel are not required to remain in areas where there is toxic gas or high airborne radiation. They, therefore do not require special respiratory protection to fulfill their emergency responce-function.

Section P - Responsibility For The Plagning Effort Page P-1 editorial and title changes l

Change review of EPIP's from " annual" to "bi-annual".

Reason: To be consistent with plant administrative procedures. Also, EPIP's have been updated annually over the past 3 years and few changes are now needed.

Page P-2 Title changes.

Page P-3 Title changes.

i.

l Page P-4 Title change.

L Page P-5 Delete - redundant information which is included on l

Page P-4.

l i

l. Figure P-1 Titic changes. .

l APPENDIX 2 - LETTERS OF AGREEMENT Replace with new letters of agreement for the folloviig:

1) WRDW-TV 4) WBBQ Radio Station
2) RMC 5) WTCB Radio Station
3) Westinghouse 6) HCA Aiken Regional Medical Centers Delete the following letters of agreements:
1) WNEZ Radio Station - out of business.
2) Ralph W. Buchanan, MD - not needed.

.- APPENDIX 3'- MEANS FOR PROVIDING~ PROMPT ALERTING AND NOTIFICATION ~~

0F THE PUBLIC Page 3-1 Last paragraph, fourth line:

l Delete " automatically actuated"-

Reason: Incorrect J Page 3-4 First paragraph, lines 2, 3 & 4 i

1. Change " twenty" to "nine" 1
2. Delete "13AM, 7FM".
3. Delete "and one educational televisaca ',tation" Reason: '.he new numbers. reflect ther= $ cations we have letters of agreement with. All local stations are members of EBS and will broadcast emergency messages.

Page 3-5 -First paragraph Change "on a best-effort basis. Vehicles equipped with sirens or loudspeakers.are a feasible'means to notify such people" to "by the' fixed siren system". Update to reflect fixed sirens.

Page 3-6 Delete paragraphs d), e), f), and g). .;

Justification: This information is redundant and unnecessary as the notification system is adequately described in the body of the Emergency _ Plan as stated in paragraph b) on this page.

Page 3-7 Second paragraph: _

Change " brochure"-to " calendar" - editorial.

Third paragraph:

l Change " brochures" to " documents" - editorial.

Fourth paragraph:

Change " recipients of tone alert radios" to " residents" -

correct error.

Page 3-8 Change "VECP" to "GPC" Reason: Maintenance may be performed by other Georgia Power Co. personnel other than VEGP.

Page 3-8a Fourth paragraph Change "VEGP" to "GPC" Change " Group" to " Supervisor" Reason: Maintenance may be performed by other Georgia Power Co. personnel other than VEGP.

t

- APPENDIX 4 - EMERGENCY EQUIPMENT LIST Page 4-5 Delete item "21. Respirators with filters cartridges" ,

Same reason as Section I-7.

APPENDIX 7 - CORPORATE EMERGENCY PLAN FOR VOCTLE ELECTRIC GENERATING PLANT Page 5 Titles changed to bring the Emergency Plan in agreement Sections A.1, with current organization.

A.2 and A.3 Page 6 Last paragraph - Editorial.

Page 7 Title change.

Page 8 Changes Emergency Response Organization (ERO) designees Section B.1 for a " primary" with "3 alternates" concept to a " team" ,

concept with the designees on a predetermined rotating schedule..

Page 9 Same as Section B.1 Section B.4 Page 10 Deleted Technical and Licensing Support Manager.

Section B.5 Responsibilities assigned to Engineering Services Manager, t Page 10 Renumbered to Section B.5 Section B 6 Change same as Section B.I.

Duties and responsibilities para. B.6.2 revised to include those previously assigned to Technical and Licensing Support Manager.

Page.11 Renumber paragraph B.6.

Section B.7 Changes same-as B.1.

L Page 12 Editorial.

i Section B.6.2.c Page 13 Paragraph renumbered B.7 l, Section B.8 Title changed to Radiological Assessment Manager, Paragraph change same as B.1.

Page 13 Renumbered section B.8.

Section B.9

'Page 14 Title changes to bring Emergency Plan in agreement with Section current organization.

B.8.1.b Page 14 Renumbered Section B.9.

Section B.10 Title changed to bring Emergency Plan in agreement with current organization.

1-

'3

g. }

L .

~*

APPENDIX 7 - CORPORATE EMERGENCY Pl.AN FOR VOCTLE~ ELECTRIC GENERATING I

PLANT (Cont'd) i Page 15 Renumbered Section to B.10.

Section B.11 Changed / corrected Spokesperson designees. ,

! Editorially changed wording of Duties and responsibilities for clarification.

Page 16 Renumbered paragraph to B.11 >

Section B.12 Made editorial changes to wording for clarification.

Fase 17 Changed Emergency Response Organization assignments to Table B.1 reflect current titles and organizational structure. t Page 18 Deleted Technical and Licensing Support Manager. Provided Figure B-1 for direct coordination among Public Information designees.

Page ,19 Deleted Reference to GPC switchboard operator. Position Section C.1 does not exist in Birmingham. r Page 20 Changed to reflect current organizational structure and Figure C-1 titles.

Page 21 Editorial.

Section D.1 Paga 22 Changed last line to bring in agreement with current .

Section E.1 organization.

Page 24-27 All of Section F has been changed to bring emergency plan ,

Section F into agreement with the present organization.

Page 28 Editorial.

Section G Page 29 Changed table to agree with changes previously noted.

Table G-1 Deleted Cere damage assessment training for Corporate staff. This was duplication of site tasking and the Corporate staff does not have access to appropriate data to maku assessments. L Page 30 Deleted Core Damage Assessment description.

Table G-2 See note above.

Page 31 "ditorial.

Table G-?.

l L

- APPENDIX 7 - CORPORATE EMERGENCY PLAN POR V0GTLE ELECTRIC _ GENERATING PLANT (Co't'd)  :

Page 32 Editorial.

Section G.2 Page 33 & 34 Deleted unnecessary reference.

Attachment A Page 35 Corrected attachment to agree with existing implementing Attachment C procedures.

APPENDIX 8 - VECP EMERGENCY COMMUNICATIONS PLAN f

Page 1 Add and the General Office Operations Center (C000) in l Para. 1.C. Birmingham.

  • Page 3 Title change.

Page 9 In and emergency, the ultimate authority is the Figure E " Emergency Director." " Senior GPC Management" is not a part of the Emergency Response Organization.

Page 12 Add "normally" Para. 6.2.2 .

1st line Page 14 Change title, " Nuclear Operations Duty Officer-Atlanta,"

Para. 7.1 to "On Call Project Manager-Birmingham."

lst line Page 14 Change to read, " Establish communications with the General.  ;

Para. 7.2 Office Operations Center- Birmingham."

4th Action Page 15 Change title, " Corporate Duty Officer-Birmingham," to Para. 8.1 "On-Call Project Manager-Birmingham."

let Sentence Next to Last Commencing with " obtaining," change to read:

Line "..... obtaining Director of Corporate Response or Emergency Director (when EOF is activated) approval; . . . . ."

Page 29 Table 1 Public Information Manager (EOF):

1. Change primary from " Director Corporate Response" to.

"Public Affairs Coordinator".

2. Change alternates to " News Service Manager and Communications Service Manager".

j Emergency Communications Director (Corporate: - change primary to

! " Communication Services Manager".

i-( ,

,, Pane 29 Table 1 (C- t'd)

Company Spokesperson (ENC) (1) Change " Hatch" to "Vogtle" j (2) Change from " Manager Engineering (Vogtle)" j to " Manager Training and Emergency Preparedness".

l ENC Director (ENC): 1. Change primary to " Manager Public Information"

2. Change alternates to " Corporate Communication [

Director and News Service Manager".  ;

o Corporate Office Information Coordinator (Corporate): Change -

primary to " Media Relations Coordinator". l l

Change " Corporate Officer 14th Floor Liaison (Corporate)" to "GOOC

  • Newswriter".

APPENDIX 9 - INDEX OF EMERGENCY PLAN IMPLEMENTING PROCEDURES  ;

Page 9 Delete Procedure "00980 - Radioactive Waste Volume Reduction Program"

' Reason: Procedure does not exist. .

k I-i l

'l i

i b

I l

1 L

l t

t i

I l

i ,

4 ENCLOSURE 2 i

INSTRUCTIONS FOR INCORPORATION i

?

't i

I w

t b

l 1

s l

l

l VEGp UNIT 1 AND UNIT 2 i

' EMERGENCY PLAN l REVISION 12 4/90-INSERTION INSTRUCTIONS ,

PAGE INSTRUCTIONS'

p. i_ Replace
p. iii- Replace
p. v Replace >
p. vii Replace

" p. ix Replace.

p.-xi .

Add

p. xiii .

Add p.uxv Add

p. xvii Add
p. xix Add f.vi Replace p.'xx Replace p.x p.:A-1 Replace
p. A-15 Replace-
p. A-17 Replace
p. A-19 Replace'
p. A-23 Replace f.A-1 Replace
p. B-1 Replace
p. B-3 Replace
p. B-7 Replace
p. B-9 .

Replace t.B-1 (2 sheets) Replace.

t.B-2 (2 sheets) ' Replace f B-1 Replace f.B-2 . Replace f.'B-3 Replace.

f.B-4 Replace

p. C-5 Replace.

p . D-l' Replace

, p. D-3 Replace
p. D-9 Replace t.D-1 (sheet 2) Replace f.D Replace f.D-9 Replace u p. E-1 Replace l p. E-3 Replace
p. E-5 Replace t'.E-1 (2 sheets) Replace t.E-2 (2-sheets) Replace i t.E-3 Delete  !

f.E-1 (3 sheets) Replace  !

f.5-2 (3 sheets) Replace  !

f.E-3-(3 sheets) Delete  ;

L f.E-4 (2 sheets) Delete I f.E-5 Delete f.E-6 Delete i

e

i 4 ,

VEGP UNIT 1 AND UNIT 2-  :

EMERGENCY' PLAN  ;

REVISION 12 4/90 l INSERTION INSTRUCTIONS  ;

PAGE INSTRUCTIONS-

p. F-1 Replace f
p. F-2a Delete  !
p. F-3 Replace
p. F-5 Replace [
p. F-7 Replace- i t.F-1 Replace  ;
p. Q-3 Replace i Replace
p. H-3
p. H-5 Replace  ;
p. H-7 Replace
p. H-17 Replace
p. H-19 Replace ,

f.H-3 Replace l f.H-4 Replace l

p. I-l Replace i p..I-3 Replace l
p. I-3b Replace '
p. I-5 Replace '
p. I-Sb Repl,tce
p. I-7 Replisce  !
p. I-8a Add .i p._I-9 Replace  !
p. I-10a Deleste  !
p. I-11 Rep l. ace  !
t. 1-1 through I-8 Deliste
p. J-l Replace i
p. J-3 Rep.' ace
p. J-3b Replace ,

t.J-4 (sheet 1) Replace

_p. K-1 _ Replace "

p. K-3 Replace p L-1 Replace
p. M-1 Replace -!
p. M-3 Replace  !

_p. M-5 Delete ,

Replace f.M-1

p. N-1 Replace .
p. N-3 Replace  ;
p. N-5 Replace.
p. N-7 Replace
p. O-1 _ .

Replace t.O-1 (sheet 2) Replace i t.0-2 (sheet 1) Replace

p. P-1 Replace
p. p-3 Replace ,
p. P-5 Delete ,

11 i

6

,, 7, -- - .,x--

psm

{ k(_k "g.

t.

  • VEGP UNIT l'AND UNIT 2 L '

EMERGENCY' PLAN:

0-e REVISION 12 4/90 INSERTION INSTRUCTIONS

'[m PAGE INSTRUCTIONS

?,'

f . P-1_ .

Replace Appendix 1 p.-1-2 Replacef

[. . '

~~

Appendix l_p. 1-4 Appendix 2 Table of Contents (2 sheets)

Replace Replace

' Appendix 3 p. 3-1 Replace Appendix 3 p._3-4 Replace Appendix 3.p.-3-5 Replace y Appendix 3 p. 3-6 Replace Q Appendix 3 p. 3-7 Replace

!; Appendix 3 p. 3-8 Replace Appendix 3 p' 3-8a

. Replace 4 Appendix-4 p. 4-5 Replace Appendix 6 p. il Replace Appendix 6 p. 1-4 Replace Appendix 6 p. Al-1 Replace

, Appendix 6 p. 24 Replace Appendix 7 Title Page Replace Appendix 7 p. 1 Replace 0 Appendix 7 p. 5 Replace Appendix 7 p. 6 Replace Appendix 7 p. 7 Replace Appendix 7 p.-8 ' Replace-r; Appendix 7_p. 9 Replace Appendix 7 p. 10 Replace Appendix 7 p. 11 Replace Appendix ? p- lla . . Add i -Appendix 7 p. 12 Replace Appendix 7 p. 13 Replace Appendix 7.p. 13a Add Appendix 7 p. 14 Replace Appendix 7 p. 15 Replace

" Replace

. Appendix 7-p. 16 Appendix 7 p. 17 (t.B-1) Replace with two* sheets Appendix 7 p. 18 (f.B-1) Replace

' Appendix 7 p. 19 Replace Appendix 7 p. 20 (f.C-1) Replace Appendix 7 p. 21 Replace

-Appendix 7 p. 22 Replace Appendix 7 p.-25 Replace Appendix 7 p. 26 Replace

!.ppendix 7 p.'27 Rep 15ce Appendix 7 p. 28 Replace Appendix 7 p. 29 (t.G-1) Replace Appendix 7 p. 30 (t.G-2) Replace Appendix 7 p. 31 (t.G-2) Replace Appendix 7 p. 32 Replace ili

o . ..

A . 'f

.o L. . VEGP UNIT l'AND UNIT 2

. EMERGENCY PLAN-REVISION 12 4/90 INSERTION INSTRUCTIONS i

r PAGE INSTRUCTIONS Appendix 7 p. 33 Replace Appendix 7 p. 34 Replace

. Appendix 7 p. 35 Replace

. Appendix 8 p. 1 Replace Appendix 8 p. 3 Replace Appendix 8 p. 9 (f.E) Replace Appendix 8 p. 12 Replace Appendix 8 p. 14 Replace Appendix 8 p. 15 Replace

! -r Appendix 8 p. 17 Replace

' Appendix 8-p._29 (t.1) Replace Appendix 9 p. 9-1 Replace Appendix 9 p. .9-2 Replace i

l -.

l l

l ,

5003v iv l

L.

ll

l -

  • Q l

g @

e ,*

ENCLOSURE 3 REVISED PLAN P..GES (REVISION 12 PAGES DISTRIBU1ED ON MAY 29, 1990) d