ML20043H306

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to ISI-P-014, Inservice Insp Program, for Review & Approval,Per Tech Spec 4.0.5 Re Surveillance Requirements.Rev Includes Withdrawal of Relief Requests RR-45,47,48 & 54
ML20043H306
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/15/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043H307 List:
References
MSV-00230, MSV-230, NUDOCS 9006250131
Download: ML20043H306 (2)


Text

I F,, ' Go:rD.a Powr Company

. 333 Piedmmt hermo

,, # Atlantt Geova 30300 Tolophore 4(4 !O6 3?9'.  ;

Maihng Maren 40 in@f twn CMter Pathway Potit O!!ce Dax I?DL -

Dr.mngham. Alabama 3L201  !

Toephone 205 ($B 5581 l

June 15, 1990 emewo euvomm  !

W. O. Ha6rston,111 Servot Vee Presdont Neea' Operahons ,

M'A 00230  ;

  1. 764 Docket No. 50-425 U. S Nuclear Regulatory Commission  !

ATTN: Document Control Desk ,

Washington, D.C. 20555 t V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 REVISION 3 TO INSERVICE INSPECTION PROGRAM Gentlemen: i letter MSV-00169 dated March In accordance 27,. 1990, enclosed with is Georgia RevisionPower Company 3 to the Vogt (GPC)le Electric Generating Plant, Unit 2 (VEGP-2) Inservice Inspection (ISI) Program, ISI-P-014. The t revision is being submitted for NRC review and approval in accordance wit' Technical Specification 4.0.5 concerning surveillance requirements. Tht.

enclosed documents supersede portions of the original ISI program previously submitted. A summary of the changes resulting from Revision 3 ,

is also enclossd. Ten copies of this submittal are being provided herein for your ccnvenience.

Revision 3 to the VEGP-2 ISI Program includes the withdrawal of Relief Requests RR-45, 47, 48 and 54. We have re-evaluated the need for each of the subject relief requests and have determined that relief is not required. Accordingly, GPC wishes to withdraw Relief Requests RR-45,.47, 48 and 54 for reasons similar to those discussed in GPC letter MSV-00169 which concerned similar relief requests for Vogtle Electric Generating Plant, Unit 1 (VEGF-1). Relief Request RR-54 is being conditionally withdrawn. In addition to the withdrawal of the aforementioned relief ,

requests, Relief Request RR-32 has been revised to address the surface examination of two additional reinforcing plate-to-vessel welds not previously addressed in the Residual Heat Removal System (RHR) heat exchangers and to better depict the VEGP-2 RHR heat exchangers nozzle and vessel shell configuration. As a result of the changes to Relief Request RR-32, the VEGP-1 and VEGP-2 relief requests by that number are now virtually identical. .

9006250131 960615 5 <

DR ADOCK 0D00

.C, 9

+

U. S. Nuclear Regulatory Commission MSV-00230 Page 2 The NRC is requested to review and grant approval of the enclosed program ,

changes in accordance with 10 CFR 50.55a(g)(6)(i). Relief requested by the enclosed changes does not affect public health and safety. Approval of the enclosed ISI program revision is requested by January 1, 1991.

Should there be any questions in this regard, please contact this office.

Sincerely, LAI. $v .,,--

W. G. Hairston, III WGHillkAE/gb

Enclosure:

Revision 3 to VEGP-2 ISI Program, ISI-P-014 xc: Georaia Power Company Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. R. M. Odom Mr. P. D. Rushton Mr. L. A. Ward NORMS U. S. Nuclear Reaulatory Commission Mr. R. F. Aiello, Senior Resident Inspector, Vogtle Mr. S. D. Ebneter, Regional Administrator Mr. T. A. Reed, Licensing Project Manager, NRR

>