Responds to Violations Noted in Insp Repts 50-424/90-08 & 50-425/90-08.Corrective Actions:Administrative Procedures Controlling Verification & Validation of Emergency Operating Procedures Will Be Evaluated & Revised as Required
ML20059G829
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/30/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-02050, ELV-2050, NUDOCS 9009130180
Download: ML20059G829 (3)


Text

.

g . . . , i Georg a Power Cenpa<y

~- *

( k3l 333 Peedmcnt Acue ~

- Atlanta, Georg3 30300 1elephone 404 523 3195 Mading Adtoss'.

a0 inemeu Center Parkway Post CHice Dov 1295 -

Dirmingham, Atatoma 35201 TNephone 205 BGB 5501

}'

August 30, 1990 ec swown eaec trstem

w. a. Hairmon, su

, Servor Vce Prevdont Nuclear Opera 5ons ELV-02050 0572 Docket Nosc 50-424 50-425

.U.S. Nuclear Regu latory Commission

' ATTN: Document Control Desk Washingten, D.C. 20555 h Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT REPLY TO INSPECTION REPORT As requested in the NRC. letter dated August 2, 1990, Georgia Power Company (GPC) submits the enclosed additional information in response to the findings

-identified in Inspection Report 50-424/90-08'and 50-425/90-08, which concernt-

- the inspection conducted by Mr. L. Lawyer, Mr.' R. F. . Aiello, Mr. R. Baldwin,- Mr.

R. Schin, and Mr. R. D. Starkey of.the NRC from May 7-18, 1990. In the enclosure, transcription of the requests precedes GPC's responses.

Please contact this office if you have any. questions.

Sincerel ,

W W. G. Hairsto , Ill AL WGH,III/JLL/gm-

Enclosure:

Findings 50-424, 425/90-08-01 and.07 c(w): Georaia Power Comoany

-* Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. R. M. Odom Mr. P. D. Rushton NORMS e**~'3 ds ,, v U.S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr..T. A.' Reed, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident inspector, Vogtle L 9009130100 900830 i 1 I-1 PDR ADOCK 05000424, k.' G., PNV

e K

in

., ENCLOSURE.

V0GTLE ELECTR!C GENERATING PLANT'- UNITS l~& 2 RESPONSE TO NRC INSPECTION REPORT 50-424/90-08 AND 50-425/90-08 a.

"However,:your reply does not make it -

~

Comment to IFI 424. 425/90-08-01 clear that the SDD will be revised to -

t incorporate engineering request- 90-0186."~

(the SDD for ES 3.2).

.Resoonse to IFI 424; 425/90-08-01 The Step Deviation Document (SDD)'for ES-3.2 has been revised as suggested by IFl 424,425/90-08-01. The'SDD now .

4

. references the Westinghouse ' letter-(GP-14922) dated Coly-10, 1990 which was.

, generated:in reply to engineering request-RER 90-0186.

. Comment;to IFI 424. 425/90-08-07 "Your response does not address corrective actions,to. identify and _

correct'similar deficiencies in your E0Ps and A0Ps or similar deficiencies-in your.

e verification and validation program."

Response to IFI 424. 425/90-08-07 In the July 12, 1990 response to IFl W 424,425/90-08-07 (ELV-01879) GPC stated:

The following revisions will-be madetto 1

1 -the E0P Writers, Guide:

o -add action verbs and abbreviations-o upgrade criteria for level'of detail.

' 4- - Also the E0P Writers' Guide will be' evaluated and appropriate actions'will ,/

'

  • be taken~for the'following:.  ;

1 o more detailed verification checklist.

1[- l o include E0P rules' of usage o additional guidance to ensure

1. m consistency ,
  • o addition of an index to make it more ;i

. user friendly

The administrative procedures

,, controlling the verification and s'i validation of the E0Ps will be evaluated y

and revised as required.

' J ,, o The above actions will be completed by

>* December 1, 1990.

L, y

,h

[ ..i

=

l g

. . > r, .

glk - _,

,g jj ,.

41 ,g- i

.6>

y 1 1 ( . . s ENCLOSURE-(CONTINUED)

. V0GTLE: ELECTRIC GENERATING PLANT'- UNITS:1 & 2

' RESPONSE TO NRC INSPECTION REPORT- 50-424/90-08 AND~50-425/90-08 t '

o .;

s 3

'In. addition to the revisions described

'. above, GPC'will' add the following. to the!

J0P Writers Guide:

L, o E0P Verification Documentation Form

? i which will require a step-by-step.

~

L '

chsck of changes made during a ',~

revision'and be used to.

f> re-verify E0P's -for their next

[: revision.' q o E0P Verification Checklist which will-provide a detailed review checklist?

? for E0P text materials.

The actions described above constitute an upgrade program to ' evaluate and revise 1

'the'E0P Writers Guide. A: verification 'i and validation review using the-revised E0P Writers Guide will= be performed to j correct those technical, nomenclature, i '

and human factors comments identified by-y~

NRC inspection report 424, 425/90-08 and any similar deficiencies not already i identified in the-EOP's and A0P's, <

g The above actions will be completed by Lp July 1,.1991, j g-i q p

p .