MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl ML20205H4051999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3891999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1).Page 2 in Third Amend Power Sales Contract of Incoming Submittal Not Included ML20205A9441999-03-25025 March 1999 Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d ML20205H3811999-03-24024 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3621999-03-22022 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81, as Requested IAW 10CFR50.75(f)(1) ML20204G4361999-03-18018 March 1999 Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Vegp,Iaw Requirements of 10CFR50.54(w)(3) ML20204C0591999-03-17017 March 1999 Forwards Rev 0 to WCAP-15160, Evaluation of Pressurized Thermal Shock for Vegp,Unit 2 & Rev 0 to WCAP-15159, Analysis of Capsule X from Vegp,Unit 2 Reactor Vessel Radiation Surveillance Program ML20207K9551999-03-11011 March 1999 Forwards Response to Rai,Pertaining to Positive Alcohol Test of Licensed Operator.Encl Info Provided for NRC Use in Evaluation of Fitness for Duty Occurrence.Encl Withheld,Per 10CFR2.790(a)(6) ML20207L9721999-03-10010 March 1999 Forwards Rev 15 to EPIP 91104-C of Manual Set 6 of Vogtle Epips.Without Encl ML20207B0191999-02-25025 February 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 980701-1231,IAW 10CFR26.71(d) 05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 9812291999-01-27027 January 1999 Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 ML20199F7701999-01-13013 January 1999 Submits Revised Response to RAI Re Licensee 980713 Proposed Amend to Ts,Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Protection Channels. Corrected Copy of Table,Encl ML20199F7981999-01-13013 January 1999 Forwards Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage. Change Bar in Margin of Affected Pages Denotes Changes to Rept ML20199G1381999-01-13013 January 1999 Forwards Copy of Permit Renewal Application Package for NPDES Permit Number GA0026786,per Section 3.2 of VP Environ Protection Plan 05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.731999-01-13013 January 1999 Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 ML20198F6131998-12-18018 December 1998 Forwards Revised Certification of Medical Exam Form for License SOP-21147.Licensee Being Treated for Hypertension. Util Requests That Individual License Be Amended to Reflect Change in Status ML20198L6631998-12-18018 December 1998 Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21 ML20198D9291998-12-16016 December 1998 Forwards Requested Info Re Request to Revise TSs Elimination of Periodic Pressure Sensor Response Time Tests & Elimination of Periodic Protection Channel Response Time Tests ML20198D9991998-12-16016 December 1998 Forwards Responses to 980916 RAI Re Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations ML20198D8171998-12-14014 December 1998 Forwards NRC Form 396 & Form 398 for Renewal of License OP-20993.Without Encls ML20206N3051998-12-0808 December 1998 Submits RAI Re Replacement of Nuclear Instrument Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys 1999-09-20
[Table view] |
Text
(*~U , f,
)Oglethorp Power Oglethwpe Pcwer Capaatan 2100 East bcharge Piace PO Box 1349 Tucket GA 30085 13 0 phme 770270 7600 3999 fan 770 2701872 An Dectre Memteship Dwpewn Docket Nos. 50-424 50-425 Mr. John C. Hoyle, Secretary U. S. Nuclear Regulatory Comnussion ATTN: Rulemakings r.nd Adjudication's Staff Washington, DC 20555-0001 Vogtle Electric Generating Plant
" Financial Assurance Requirements for Decommissioning Nuclear Power Reactors"
{H3 FR 50465 dated Seotember 22.1993.}
Dear Ladies and Gentlemen:
As provided in 10 CFR 50.75(fX1), each power reactor licensee is required to report to the NRC, on a calendar year basis, beginning on March 31,1999, and every 2 years thereafter, on the status ofits decommissioning funding for each reactor or part of reactor it owns.
Oglethorpe Power Corporation (OPC), hereby submits the information for operating licenses NPF-68 and NPF-81 as requested in accordance with 10 CFR 50.75(f)(1) for the Vogtle Electric Generating Plant. It is recognized by OPC that Southern Nuclear Operating Company (Southern Nuclear) will be providing this information to the NRC along with the other Co-Ownei submittals.
Although Southern Nuclear holds the operating license, OPC is one of the licensed owners of Plant Vogtle, units 1 & 2, owning 30% of the facility.
Based on the information presented herein, there is reasonable assurance that the OPC ownership prorated amount of the NRC prescribed minimum will be available to decommission Plant Vogtle units 1 & 2 on the current expiration date of each unit's operating license as set forth in 10 CFR 50.75(c).
Should you have any questions concerning this matter, please call me.
Respectfully submitted,
%M n - - -_ -
Richard D. Barker Manager, Fossil & Nuclear Operations RDB:sd i Enclosures -
i 9904080178 990331" I PDR ADOCK 05000424 I PDR y n. -
A memtWir Of ite NJ110tial htW OtfCDIC ON#N!f atid A550CWm
l-Mr. John C. Hoyle, Secretary Page 2 March 24,1999 l
Cc: Southern Nuclear Ooerating Comoany Mr. J. B. Beasley, Vice President - Vogtle Electric Generating Plant U.S. Nuclear Regulatory Comminaion. Washinek_i. DC Mr. D. H. Jaffe, Senior Project Manager - Vogtle U. S. Nuclear Regulatory Comminaion. Region II l Mr. L. A. Reyes, Regional Administrator Mr. J. Zeiler, Senior Resident Inspector - Vogtle i
I 1
l l
{ o, Eaclosure WW e Electric Generating Plant Oglethorpe Power Corporation Ownership Percentage-30%
, % .. . , gc..; 14 g 4, .;.a~ , g
^1 CFR 50.75(f)(1) Requirement. s .%
by g %q. ~ 45 -
_g, JUnit
- y 1 N
- , .y-
' Unit 2 ~
c
- 1. The minimum decommissioning fund estimate, $84,425,0002 $84,425,0002 :
pursuant to 10 CFR 50.75 (b) and (c)I l
- 2. The amount accumulated at the end of the calendar sj year preceding the date of the report for items included l
in 10 CFR 50.75 (b) and (c). $18,595,201 $15,094,916 l .
- 3. A schedule of the annual amounts remaining to be See Schedule in See Schedule in collected;for items in 10 CFR 50.75 (b) and (c). Attachment 1 Attachment 1
- 4. The assumptions used regarding:
l Rates of escalation in decommissioning cost 3.6% 3.6% l Rates of Earnings on decommissioning funds 10% 10%
- Approved by Audit Committee of Board on 1 Rates of other factors used in funding projections 11/ 5/98 - -
l
- 5. Any contracts upon which the licensee is relying i pursuart to 10 CFR 50.75(e)(1)(ii)(c)
- 6. Any modifications to a licensee's current method providing financial assurance occurring since the last submitted report.
- 7. Any material changes to trust agreements. - -
1
- The NRC formulas in section 10CFR50.75(c) include only those decommissioning costs incurred by
. licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the
.. property under restricted conditions and termination of the license. The cost of dismantling or demolishing non. radiological systems and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to DOE are not included in the cost formulas.
8 This number is based on NUREG-1307, Rev. 8 for the Burial factor and the December 1997 values for the Labor and Energy factors
To .%--
Attachment 1 Schedule of the Annual Amounts Remaining to be Collected OGLETHORPE POWER CORPORATION NRC FUNDING - 1998 Vogtie *, Escalation Factors 2,681 Inflation Factor: 3,6 Earnings Rate: 10 1993 1995 1997 Balance Balance NRC Rule NRC Rule NRC Rule Year Begin Year Earnings Contributio End Year Minimum Minimum Minimum 7/90 0 0 2,639,679 2,639,679 1990 2,639,679 105,587 781,836 3,527,16 1991 3,527,102 282,168 781,834 4,591,106 1992 4,591,106 367,289' 781,836 5,740,231 1993 5,740,231 976,267 781,836 7,498,334 1994 7,351,359 147,027 921,977 8,420,363 1995 8,420,363 673,629 921,977 10,015,969 1996 10,015,969 801,278 921,977 12,228,046
-1997 12.228,046 978,244 921,977 16,057,950 1998 17,295,563 1,297,167 984,648 18.595,201 1999 18,595,201 1,859,520 984,648 21,439,369 2000 21,439,369 2,143,937 984,646 24,567,954 2001 24,567,954 2,456,795 984,648 28,009,397 2002 28,009,397 2,R00,940 984,648 31,794,985 2003 11,794,985 3.179,499 984,648 35,959,132 )
2004 35,959,132 3,595,913 984,648 40,533,693 2005 40,539,693 4,053,969 984,648 45,578,310 2006 45,578,310 4,557,831 984,648 51,120,789 l 2007 51,120,789 5,112,079 984,648 57,217,516 2006 57,217,516 5,721,752 984,448 63,923,916 2009 63,923,916 6,392,392 984,648 71,300,955 l
2010 71,300,955 7,130,096 984,648 79,415,699 2011 79,415,699 7,941,570 984,648 88,341,917 2012 88,341,917 4,834,192 984,648 98,160,756 l 2013 98,160,754 9,816,074 984,648 108,961,480 2014 108,961,480 10,896,148 984,448 120,842,276 2015 120,842,276 12,084,228 984,648 133,911,151 2016 133,911,151 13,391,115 984,648 148,286,915 2017 148,286,915 14,828,491 984,448 144,100,254 2018 164,100,254 16,410,025 984,648 181,494,927 2019 181,494,927 18,149,493 984,648 200,429,068 j
2020 200,629,068 20,062,907 984,648 221,676,623 2021 221,476,623 22,167,662 984,648 244,828,933 -
2022 244,828,933 24,482,893 984,648 270,296,475 2023 270,296.475 27,029,647 984,648 298,310,770 2024 298,310,770 29,831,077 984,448 329,126,495 2025 329,126,495 32,912,650 984,648 363,023,793 2026 363,023,793 36,302,379 984,448 400,310,820 2027 400,110,820 1,645,113 0 401,955,933 223,304,000 416,178,000 235,784,000 i
l l I l
t i 1
l l
l 1 l
t.
[Q - .g i , )
i Attachment 1 Schedule of the Annual Amounts Remaining to be Collected q
\
l f OCLETHORPE POWER CORPORATION NRC FUNDING 1998 l
t Vcgtle 2 Escalation Factors 2.681 Inflation Factors 3,6 Earnings Ratet 10 1993 1995 1997 Balance Balance NRC Rule NRC Rule NRC Rule Year Begin Year Ea rnings Contributio End Year Minimum Mininum Minimum 7/90 0 0 484,145 484,145 1990 884,145 35,346 850,140 1,769,651 1991 1,769,651 141,572 A50,140 2,761,343 1992 2,761,363 220,909 A50,140 3,832,412
{
1993 3,832,412 650,635 850,140 5,333,187 1994 5,333,187 104,644 948,274 6,388,125 1995 6,388,125 511,050 948.274 7,847,449 1996 7,847,449 I
627,796 948,274 9,611,913 1997 9,611,913 768,953 948,274 11,889,625 l
1998 13,831,863 1,037,390 1,011,144 15,094,916 1
1999 15,094,916 1,509,492 1,011,144 17,615,552 ]
2000 17,615,552 l 1,761,555 1,011,144 20,388,251 2001 20,386,251 2,038,825 1,011,344 23,438,220 l l
2002 23,438,220 2,343,822 1,011,144 26,793,186 2003 24,793,186 2,679,319 1,011,144 30,483,648 2004 30,483,648 3,049,365 1,011,144 34,543,157 2005 34,543,157 3,454,316 1,011,144 39,0cs,617 2006 39,008,617 3,900,862 1,011,144 43,920,621 2007 43,920,623 4,392,062 1,011,144 49,323,829 2006 49,323,829 4,932,383 1,011,144 55,267,356 2009 55,267,356 5,526,736 1,011,144 61,805,235 2010 41,805.235 6,180,524 1,011,144 68,996,903 i 2011 64,996,903 6,899,690 1,011,144 76,907,737 2012 76,907,737 7,N90,774 1,011,144 85,409,655 2013 85,609,655 8,560,965 1,011,144 95,181,764 2014 95,181,764 9,518,176 1,011,144 105,711.085 2015 105,711,085 10,571,108 1,011,144 117,293,337 2016 117,293,337 11,729,334 1,011,144 130,033,815 2 31~t 130,033,815 13,003,382 1,011,144 144,048,341 201R 144,048,341 14,404,834 1,011,144 159,464,'19 2019 159,464,319 15,946,432 1,011,144 1"A,421,e95 2020 176,421,895 17,642,109 1,011,144 195,075,228 2021 195,075,228 19,507,523 1,011,144 21'J , 5 9 3 , 8 9 5 2022 215.593.895 21,559,389 1,011,144 238,144,428 2023 138,164,428 23,816,443 1,011,144 262,992,015 2024 262,992,015 26,299,202 1,011,144 290,102,341 2025 290,302,361 29.030,236 1,011,144 120,343,741 2026 320,343,741 32,034,374 1,011,144 353,389,259
- 027 353,389,259 35,334,926 1,011,144 389,739,329 2028 189,739,329 38,973,931 1,011,144 429,724,406 2029 429,724,406 4,234,378 0 433,962,783 238,361,000 447,A04,000 253,703,000 l
l l
l