Text
_
e
$.7 r.
NOT-01547 0093e X7GJ17-V600 October 25, 1988 Document Control Desk U. S. Nuclear Regulatory Consnission Washington, D. C. 20555 PLANT V0GTLE - UNIT 1, 2 NRC DOCKET 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 SIMULATOR CERTIFICATION Gentlemen:
Enclosed is the simulator certification package for the Plant Yogtle These documents represent the completion of the Plant Vogtle initial simulator certification for Units 1 & 2.
The training simul ator.
certification has been conducted in accordance with the requirements o 10 CFR Part 55 and Regulatory Guido 1.149, "Nuclear Power Plant Simulation Facilities For Use In Operator License Examinations".
Sincerely, SK W. G. Hairston III l
JAE/PDR:llh
Enclosure:
1.
Plan' Vogtle.iimulator Certification (see next page) c:
8811010549 08102b NJh PDR ADOCK 05000424 PNU V
j
,b
G.
., D m : r.'
U. 5. Nuclear Regulatory Commission October 25, 1988 Page Two c: Georgia Power Company Mr. P. D. Rice Mr. G. Bockhold, Jr.
GO-NORMS U. S. Nuclear Regulatory Comission Document control Desk Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector - Operations, Yogtle b
i