Submits Summary of Snubber Types & Sample Plans for Functional Testing to Be Performed During Sept 1990 Outage
ML20055H644
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/23/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MSV-00258, MSV-258, NUDOCS 9007270117
Download: ML20055H644 (2)


Text

%

p

- Georgia Power corppany"

  • - ' 333 Piedmont Avenue'-
  • : **  : Attanta, Georgia 30308 s o Telephono 404 526-3195 I"

. 05'Q Addrek l

h {[l {fs B,rmingham. Alabama 35?01 Telephone 205 BOS 5581 the sout?on c!ectic sprem -

W. G. Hairston, til .

Senior Veo Presdent = MSV-00258 nacicar operadons

July 23, 1990 #892

{i l Docket No. :50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk

-Washington, D. C. :20555 ,

. Gentlemen:

V0GTLE-ELECTRIC GENERATING PLANT l

SNUBBER FUNCTIONAL TEST FLANS Vogtle : Electric Generating Plant Unit 1 and 2 (VEGP-1 and VEGP-2,- '!

respectively) Technical Specification (TS) 4.7.8.e requires that the NRC Regional Administrator be notified in writing of the sample plan selected 1 for snubber functional testing prior to the' test-period. In accordanu q with that requirement ~,' Georgia Power Company hereby submits the following i sunnary of snubber. types and sample plans to be used for functional testing 1 '

to be performed during1 the first- VEGP-2. maintenance / refueling outage-currently-scheduled to begin in September, 1990: q Inspection Type'I: -

Pacific Scientific (Model' PSA-1/4 through PSA-100)'.  !

T. S. Sample Plan 4.7.8.e.1' j

.y Inspection Type II: Anchor / Darling (Models AD-40 through AD-500)

T. S. = Sample Plan 4.7.8.e.1 a Inspection Type III: Anchor / Darling (Models AD-1600 through AD-12500) 1 T. S. Sample Plan 4.7.8.e.1 ~

Inspection Type IV: . Paul-Munroe (Large Bore Hydraulics 1000K) a T. S.: Sample Plan 4.7.8.e.1  ;

.By - copy of this letter, the NRC Region II Administrator is being provided

with our snubber functional test plans for the upcoming VEGP maintenance / refueling outage.

.Should there be any questions in this regard, please contact this office. ,

Sincerely, g/./. ALdt. A W. G. Hairston, III i

WGH,III/JAE/gb

$8f

^

9007270117 900723 PDR ADOCK 05000425 P PDC l[

r

.T

' A h" '

. ,l ' k i k

_- U.15. Nuclear Regulatory Commission t

~MSV-00258

. July 23, 1990-Page 2-o xc: Georoia Power Company Mr. C. K McCoy Mr. J. A. Bailey Mr. G. , Bockhold,f dr.

F .Mr."R. M. Odom.

EMr. P. D.. Rushton-Mr. L' A. Ward.

NORMS

. U. S. Nuclear Reaulatory Commission  !

Mr. S. D. Ebneter, Regional Administrator Mr. T.. A. Reed, Licensing Project Manager, NRR n LMr. - B. R. Bonser, Senior Resident Inspector, Vogtle 4 u  !

i 5

i L t L i 1

1 L

o L l v ,

I 7

I i or h

lvn  !

ib S

. . .,