ML20055H644

From kanterella
Jump to navigation Jump to search
Submits Summary of Snubber Types & Sample Plans for Functional Testing to Be Performed During Sept 1990 Outage
ML20055H644
Person / Time
Site: Vogtle 
Issue date: 07/23/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MSV-00258, MSV-258, NUDOCS 9007270117
Download: ML20055H644 (2)


Text

%

p

- Georgia Power corppany"

' 333 Piedmont Avenue'-

Attanta, Georgia 30308 s o Telephono 404 526-3195 I"

. 05'Q Addrek l

h

{[l

{fs B,rmingham. Alabama 35?01 Telephone 205 BOS 5581 the sout?on c!ectic sprem -

W. G. Hairston, til.

MSV-00258 Senior Veo Presdent =

nacicar operadons

July 23, 1990
  1. 892

{i l Docket No. :50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk

-Washington, D. C. :20555

. Gentlemen:

V0GTLE-ELECTRIC GENERATING PLANT SNUBBER FUNCTIONAL TEST FLANS l

Vogtle : Electric Generating Plant Unit 1 and 2 (VEGP-1 and VEGP-2,-

respectively) Technical Specification (TS) 4.7.8.e requires that the NRC Regional Administrator be notified in writing of the sample plan selected 1

for snubber functional testing prior to the' test-period.

In accordanu q

with that requirement ~,' Georgia Power Company hereby submits the following i

sunnary of snubber. types and sample plans to be used for functional testing 1

to be performed during1 the first-VEGP-2. maintenance / refueling outage-currently-scheduled to begin in September, 1990:

q Inspection Type'I:

Pacific Scientific (Model' PSA-1/4 through PSA-100)'.

T. S. Sample Plan 4.7.8.e.1' j

. y Inspection Type II:

Anchor / Darling (Models AD-40 through AD-500)

T. S. = Sample Plan 4.7.8.e.1 a

Inspection Type III:

Anchor / Darling (Models AD-1600 through AD-12500) 1 T. S. Sample Plan 4.7.8.e.1

~

Inspection Type IV:

. Paul-Munroe (Large Bore Hydraulics 1000K) a T. S.: Sample Plan 4.7.8.e.1

.By - copy of this letter, the NRC Region II Administrator is being provided

with our snubber functional test plans for the upcoming VEGP maintenance / refueling outage.

.Should there be any questions in this regard, please contact this office.

Sincerely, g/./. ALdt. A W. G. Hairston, III i

WGH,III/JAE/gb

$8f

^

9007270117 900723 PDR ADOCK 05000425 P

PDC l[

r

.T

' A h" '

.,l ' k i k

_- U.15. Nuclear Regulatory Commission

~MSV-00258 t

. July 23, 1990-Page 2-o xc:

Georoia Power Company Mr. C. K McCoy Mr. J. A. Bailey Mr. G., Bockhold,f dr.

F

.Mr."R. M. Odom.

EMr. P. D.. Rushton-Mr. L' A. Ward.

NORMS

. U. S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. T.. A. Reed, Licensing Project Manager, NRR n

LMr. - B. R. Bonser, Senior Resident Inspector, Vogtle 4

u i

5 i

L t

L i

1 1

L o

L l

v I

7 I

i or h

lvn ib S

.,