ELV-02059, Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B

From kanterella
Jump to navigation Jump to search
Clarifies 900409 Response to 900323 Confirmation of Action Ltr.Util Made 31 Successful Start Attempts for Diesel Generator (DG) 1A & 29 Successful Start Attempts for DG 1B
ML20059K130
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/30/1990
From: Hairston W
GEORGIA POWER CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CAL, ELV-02059, ELV-2059, NUDOCS 9009210161
Download: ML20059K130 (17)


Text

..

4- . Georgia Power Compary 1.-1 V ;, .,; 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 4M S26 3195 '

Ma+ng Addressi . .

40 Invernew Centor Parkway -

. Post Offee Box 1295 -

Dirrrungham. Alabarfe35?01 Telephone 205 808 5581 August 30. 1990 90 SEP 8 ~ ' P 24$%,em

? W. G. Hairston, all Servor Vce Premdent Nuclear Operaboos '

ELV-02059 0579 Docket No. 50-424 U.; S. Nclear- Regulatory Commission Region.II-101 Marietta Street, N. W;-

Atlanta, GA 130323 ATTN: Mr. S. D. Ebneter

Dear Mr. Ebneter:

V0GTLE ELECTRIC GENERATING PLANT CLARIFICATION OF-RESPONSE TO CONFIRMATION OF ACTION LETTER:

By : letter datad April 9,1990- (ELV-01516), Georgia Power _ Company (CPC)l responded to a Confirmation of, Action. Letter. dated March 23, 1990. In that letter and. in our meeting notes, GPC reported that'Diuel Generator-(DG)d1A had'been. started 18 times. and DG.'18 had been started 19 times with no failures' or problems between March 20 and April 9,-1990. Similar information was reported-in

~ Revision 0 of Licensee Event Report (LER)'50-424/1990-006 dated Aprily19, 1990 (ELV-01545). - As reported in ~our telephone: calls to the NRC --we subsequently -

discovered that this information was in error.

In Revision 1 to LER 50-424/1990-006 dated June 29,1990--(ELV-01729),CPC.

attempted to clarify the correct number of DG starts- occurring in'this time period by using regulatory guide terminology'(i.e., valid vs. successful' starts).. This revised LER accurately; reports the number of: valid DG-starts during the. period of March 21 through June 7, 1990. However; durug a recent -

NRC-inspection;it was pointed out that the revised LER did no' .dequately clarify twe numbers in the April: 9th letter.

The confusion in the April .9th letter and the original LER appear to be the result of two factors. First, there was confusion in the distinction between a successful start and a valid test. For the purpose of this letter,f a start was considered successful.when the DG was started and either ran or was intention-ally shut down due to testing in progress, as identified on the attached: tables.

0ur use of the term " successful" was never intended to imply
a " valid successful test" in the context of Regulatory Guide l'.108. Many start attempts were made

~ to test the DG's IA and lB using applicable operating procedures. These procedurec and data sheets do not contain criteria for determining if ta: start ist successful which resulted in determinations of success which were inconsistent with the above definition. Second, an error was made by the individual;who performed the count of DG starts for the NRC April 9th letter, 9009210161 900830 kl i gaW:

1 0 c, o., o, y. een Anock OsoOo424 .

P PNU g , q

. :; y .; ,

GeorgitiPower A U. S. Nuclear Regulatory Commission ELV-02059-Page 2-The purpose of this letter'is to correct the figures related to.the number of DG-: :j starts reported in the April 9th letter. Attached are tables -1~ and .2 which  !

-summarize the DG starts-for the period indicated. For DG 1A,-there was a total- l of 31 start attempts and 29 of these attempts were' considered successful-after g the two failures associated with the March 20 event. For DG 18 there was a' '

total of:29 start attempts and 21 of these attempts were considered successful.  ;

Fuc?her, for DG 18 there wereL12 successful sequential' starts.  ;

Sincerely  !

[04 .

W. G. Hairston, 11 WGH,III/NJS/gm j

~ Attachments xc: Georaia Power Comoany-Mr. C. K. McCoy 1 Mr. G. Bockhold, Jr. i Mr. R. M. Odom 1 Mr. P. D. Rushton i NORMS U. S. Nuclear Reaulatory Commission ,

Document Control Desk i Mr. T. A. Reed, Licensing Project Manager, NRR Mr. B.-R. Ronser, Senior Resident Inspector, Vogtle i i

t i

w

, l

I TABLE 1.

l DlESEl. GENERATOR 1A START. RUN UNPLANNED A ._ DAIE . SUCCESS IJ11E TRIP DISCUSSION 139 03-20-90 No 1 min Yes Failure to maintain load. q 140 03-20-90 No 1 min- Yes Failure.to maintain load.  :

141 03-20-90 Yes. ,4'l/2hr No. _ Nanual start,-load  !

maintained.

142 03-20-S Yes 45 min .No Normal reserve auxiliary-  ;

transformer swap method.  ;

143 03-20-90  % 5' min No Observation run.

j 144 03-20-90 -u. 20 min No. Observation.run.- '

145 03-23-90 Yes 60 min No: Observation run.

146 03-23;90- Yes- O min No- Started wrong diesel  :

generator.

147 03-29-90. Yes 50 min No UV. test start #1.- ,

148 03-30-90 Yes 2 hr Yes* . Bubble test #1, high.

temperature jacket water' sensor vented.

149 03-30-90 Yes 6 min. No Trip simulation test.

150 03-30-90 Yes 6 min No Trip simulation test.

151 03-30-90 Yes ' 3 min No. Trip simulation test'. -

152 03-30-90 Yes 6 min No Trip simulation test. t' 153 03-30-90 Yes 4 min No Orifice modification ' '

functional test. .

154 03-30-90 Yes 10 min No Orifice modification t , functional- test.

155 03-31-90 Yes 2 min No Orifice modification

. functional test. -

156 03-31-90 Yes 3 min No . Orifice modification functional test. '

157 03-31-90 Yes 10 min No Bubble test #2 158. 03-31-90 Yes 1 min No Sensor trip timing. test. v 159 03-31-90 Yes 1 min No Sensor trip timing.tetc.

160 03-31-90 Yes 2 min No Sensor'tr1p timing test, 161 03-31-90 Yes 1 min No Sensor trip timing test..

162 03-31-90 Yes 75 min No Sensor trip tiining test 163 03-31-90 Yes 27 min No UV test start #2.

164 04-01-90 Yes 1 1/2 hr. No Normal ~ surveillance test. .

165- 04-06-90 Yes 1 min No Jacket water temperature test.- '

l 166 04-06-90 Yes 1 min No- Jacket water temperature test.

16'7 04-06-90 Yes 10 min No Jacket water temperature j; test.

l i

. i

+ . .- ._ , -, - .

.r . .

. TABLE 1 (CONTINUED)

DIESEL GENERATOR 1A START RUN UNPLANNED' h__ DAIE SECLU llE E _ -DISCUSSION 168 04-06-90 Yes 2 1/2 hr No. LOSP trip modification--

functional- test.

-169 04-09-90 Yes 1 3/4 hr. No Normal surveillance test.

  • Unit tripped during bubble testing due to one sensor venting and another sensing line being disconnected for testing.. This;is'further described.in NUREG-1410.

j

a TABLE 2 DIESEL GENERATOR lB START RUN UNPLANNED L DAI[ gicej;3Ji IJE _ TRIP DISCUSSION 120 03-21-90 No 0 min No Post-maintenance run;. prime fuel- I

-lines. .

121 03-21-90 No 0 min No' Post-maintenance run,_ prime fuel l lines.

122 03-21-90 No 15 min No Post-maintenance run, adjust 1 governor. ,

123 03-21-90 No 2 min No Post-maintenance run,: fuel oil i delta pressure high.:

124 03-21-90 No 4 min No- Functional: test run, fuel ~ oil delta pressure high, 125 03-22-90 Yes 6 min No Functional test for maintenance.

126 03-22-90 Yes 1 min -No Functional test for maintenance; 127 03-22-90 Yes 15 minc-No- Post-maintenance overspeed test, q 128 03-22-90 Yes 3 min No Post-maintenance overspeed test, i 129 03-22-90 Yes 5 min- No_ Post-maintenance overspeed test.- j 130 03-22-90 Yes 5 min -No Voltage' clamp circuit. adjust. j 131 03-22-90 :Yes 2 min. No Voltage clamp circuit adjust. j 1' 03-22-90 No 1 1/2'hr .Yes Post-maintenance 1oad test, high- i temperature lube oil trip.' '  !

133 03-23-90 Yes 7 hr No Post-maintenance _ load test-  ;

134 03-23-90 No 3 min -Yes Post-maintenance load ' test, low "

pressure' jacket water trip, ,

135 03-23-90 Yes- 4-1/2 hr_ No Post-maintenance:loadttest.

136 03-24-90 No* 33 min No Post-maintenance load- test, high temperature jacket water-al arm.

137 03-27-90 Yes 1 1/2 hr No Bubble' test. .i 138 03-27-90 Yes 42 min No Trip' simulation test. j 139 03-27-90 Yes 3 min No Trip simulation test.  ;

140 03-27-90 Yes 2 min No Trip: simulation test'. l 141 03-27-90 Yes 6 min No Trip simulation test.  ;

03-27 57 min No "

142 Yes UV test'.. .

143~- 03-28-90 Yes 1 3/4 hr No- Normal' surveillance 144 03-28-90 .Yes .4 min, No- Low pressure. lube oil .

modification functional i test.

145 03-28-90 Yes 4 min No Low pressure lube oil modification functional test 146 04-04-90 Yes 1 1/4 hr No ' Post-maintenance load test.

147 04-05-90 Yes 5 min No LOSP trip modification functional test.-

148 04-05-90 Yes 2 hr No Normal surveillance.

  • High-temperature jacket water trip alarm was received knd the engine kept running.

q

,I lN