Forwards Rev 13 to Emergency Plan & Description & Justification of Changes
ML20043G765
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/05/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043G766 List:
References
ELV-01592, ELV-1592, NUDOCS 9006210104
Download: ML20043G765 (4)


Text

y ,

N "M Ooorgia Pupt Comrtny .

. 333 Pedmont Annue

.. ' c' " f- = Atlanta. Goorgia 303o6 4  : Telephone 404 526 3195 -

4 ' Maang Address.

40 lnverness Conter Parkway -

i- Post Offca Box 1205 '

~ Birrungham, Alatama 35001 -~

le!ophone 205 SGB $581 June 5, 1990 tie saeon wuc wem

~ W. G. Hairston, all SenLV Vhe Pfe9 dent -

Nucer Operations ,

I" ELV-01592 0362 q I, Docket Nos. 50 4h 50-425-U. S. Nuclear Regulatory Commission

  • J ATTN: Document Control Desk

{ Washington, D. C.- 20555 Gentlemen:-

V0GTLE ELECTRIC GENERATING PLANT -

EMERGENCY PLAN ~ PROPOSED REVISION 13 Georgia Power Company hereby submits proposed Revision 13 to the Vogtle Electric h Generating Plant Unit'l and' Unit 2 Emergency Plan (the Plan). These proposed

" changes have been reviewed and determined that the changes may decrease the effectiveness of the Plan. -Therefore, in accordance with 10 CFR 50.54(q), this' revision-will- not-be implemented until reviewed and approved- by the HRC.

In'accordance with 10 CFR 50.4, the proposed Revision 13 also provides a report .

of each proposed change submitted for approval. Enclosure 1 is a description g

and justificationLof the individual changes.- Enclosure,2 is the proposed 9

revised l Plan pages. ,

l-Georgia' Power Company willl distribute the revised plan within 30 days of NRC i

! approval-of this proposed plan change. '

', Ple'ase contact this office if you have any questions regarding this submittal..

l

, Sincerel ,

L' . .

M i W. G. Hairston, I-k: ' ' '

j WGH,III/PAH/gm-

Enclosures:

L' l. Description-and Justification of Changes

~ '2. Revised Plan Pages  ;

xc (see next page) '

{

9006210104 900605 L

o PDR F

ADOCK 05000424 .

I L PDC y m k g

Of Il POWel U. S. Nuclear Regulatory Commission ELV-01592 Paae Two-t xc: Georaia Power Comoany Mr. C. K. McCoy (w/o)

Mr. G. Bockhold, Jr.- (w/ encl .)

Mr. P. D. Rushton-(w/ encl .)

Mr. R. M. Odom (w/ encl )

NORMS (w/ encl.)

U. S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator (w/2 encl.)

Mr. T. A. Reed, Licensing Project Manager, NRR (w/o)

Mr. _R. F. Aiello, Senior Resident inspector, Vogtle (w/1 encl.)

1 i

..---.--.n.---.-._.,.-..l.-.~.--- , - - _ . . . .-- . - . - - - - - . _ . - . _ ~ ___ . - _ - ~ - . - .- _ . - _ . _ _ - - _ _ _ - . _ - = . - - . - . _ . - - - - - . -

y , ,

ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN PROPOSED REVISION 13 DESCRIPTION AND JUST1FICATION OF CHANGES Georgia Power Company has reviewed the changes proposed to be incorporated by Revision 13 and has determined that the changes may decrease the effectiveness of the Plan and, as required by 10 CFR 50.54(q), must be reviewed and approved by the NRC prior to implementation. Details of the individual changes are

provided below.

Section B - Onsite Emergency Organization Page B-1/Section B.2 Emergency Organization Table B-1/ Sheet 1 and 2 of 2 Change - Augmentation in "60" min to "75" min.

Justification for changing the Augmentation time from 60 minutes to 75 minutes.

The Vogtle Electric Generating Plant (VEGP) is located in a rural area of Eastern Georgia. The closest urban area is Waynesboro, Georgia, a town of about 6,000 population located about 25 minutes driving time from the site. The city of Augusta and surrounding area with a population of about 200,000 people is

-located about 50 minutes driving time from the plant site. Most of the employees at VEGP have chosen to live in the Augusta area and therefore, on the average, have a driving time of about 50 minutes to the site.

Although it is possible for someone with a 50 minute driving time to reach the site 60 minutes after notification, it is not assured. -Because VEGP is so isolated (which is good from a emergency planning perspective), the NUREG-0654, Table B-1 minimum staff requirement for 30 minute augmentation is included in the on-shift requirement in the VEGP Emergency Plan, . This assures.a staffing of 20 people without any uncertainty associated with augmentation.

The suggested change from 60 to 75 minutes augmentation time will not seriously degrade the capability to protect the public health and safety as there are adequate numbers of qualified personnel on shift to perform the immediate functions required. In addition, although it is not assured that augmentation

- will' be possible in less than 75 minutet, it is very probable that there will be a significant augmentation within 60 minutes from personnel who live closer than the average employee.

i'< VEGP has a state-of-the-art computer controlled automatic dialing machine capable of placing 12 calls simultaneously. This system and a pager system are used to notify personnel on the 75 minute augmentation list. In addition, personnel who live closest to the site are preferentially placed on the 75 minute augmentation-list.

R L .

c. .. .

i In summary, because of its remote location, VEGP needs relief from the requirement to augment the on-shift staff with personnel from Table B-1, "60 minutes" column. . The minimum on-shift staff of 20 personnel, without augmentation, as presently required is adequate to safeguard the public health and safety for the additional 15 minutes needed to fully augment the staff.

Other measures such as the automatic dialer and selection of augmentation staff by distance from the site will assure that many of the augmentation staff will l

be available on site well in advance of the 75 minute maximum time.

H.1 Emergency Facilities

4. Backup EOF Change - Total time required to complete the transfer from "45" minutes to "60" minutes.

Justification for changing the transfer time from 45 minutes to 60 minutes.  ;

.The backup E0F is located in the Georgia Power Company district office in Waynesboro, Georgia. The approximate transit time is 25 minutes.

Additionally, personnel must remove records and some equipment, i.e.,

such as plug-in-phones and instruments. Upon arrival, personnel must activate the backup E0F, which includes equipment testing. The 60 minutes reflects a more realistic time for the transfer of personnel and equipment to the backup location.

H.3 Activation and Staffing of Emergency Facilities Change- TSC will be activated and fully operational within "about one hour" to about "1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />" of the initial notification. Also, changes from "about'one hour" to "about 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />" are made for having the OSC and EOF operational.

L Justification for changing TSC, OSC and E0F activation time, y

l See discussion for Table B-1. It will take approximately 75 1 minutes to have personal reach the site and an additional 15 minutes to activate the facilities. The TSC and OSC have some capability prior to this time by using on-shift personnel for staffing, p

1 L

l .. ,

.