Submits Special Rept 1-90-02 Re Number of Steam Generator Tubes Plugged During 1R2.One of Four Tubes Exceeded Plugging Limit & Required Plugging.Remaining Three Tubes Plugged as Precautionary Measure.No Defective Tubes Detected
ML20012D856
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/22/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-01452, ELV-1452, NUDOCS 9003280482
Download: ML20012D856 (2)


Text

<1' ~

coa,uan w cminww t '# 333 Pedmont A tme lk . Auanta Go:ug.e 33X6 Mphov 404 LP6 31DL Ma:1rg Alten A3h wfuissCutesVwssay Por O W.e % 1295 kmnt.gSwn. A:atein 35201 Telephone 035 86B L'ait March 22, 1990 c"weenow W. G. Hairston, lli Servor Vse Prowdent nox o;cton5 ELV-01452 0302 Docket No. 50-424 U.S. Nuclear Regulatory Commission ATTN: Ducument Control Desk Washington, D.C. 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT SPECIAL REPORT NUMBER OF STEAM GENERATOR 11)BES PLUGGED DURING 1R2 In accordance with the requirements of the Vogtle Electric Gererating Plant Technical Specifications, Section 4.4.5.5, Georgia Power Compt.ny is submit-ting the enclosed Special Report concerning the number of tub 1s plugged in each steam generator during the second Unit I refueling outage.

Sincerely, w.4. WW W. G. Hairston, III W6H/NJS/llh

Enclosure:

Special Report 1-90-02 xt: Georaia Power Company Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. R. M. Odom Mr. P. D. Rushton NORMS U. S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. T. A. Reed, licensing Project Manager, NRR Mr. R. F. Aiello, Senior Resident inspector, Vogtle 9003280402 90o3:2 PDR ADOCK 05000424 m

i, is(

iga P PDC  %

u-

l ENCLOSURE V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 TECHNICAL SPECIFICATION SPECIAL REPORT l-90-02 NUMBER OF STEAM GENERATOR TUBES PLUGGED DURING REFUELING OUTAGE 1R2 A. REQUIREMENT FOR REPORT This report is required in accordance with the Vogtle Electric Generating Plant Technical Specifications, Section 4.4.5.5. This section of the Technical Specifications requires that the number of tubes plugged in each steam generator be reported to the Commission in a Special Report pursuant to Specification 6.8.2 within 15 days following the completion of each inservice inspection of steam generator tubes.

B. NUMBER OF STEAM GENERATOR TUBES PLUGGED Inservice inspections of Unit 1 steam generator tubes were completed on March 11, 1990, during the second Unit I refueling outage. As a result of these inspections, four tubes in Steam Generator No. 2 were plugged. Only one of these tubes actually exceeded the plugging limit (i.e., 40% of nominal tube wall thickness) and was required to be plugged. The other three tubes did not excaed the plugging limit, but were plugged as a precautionary measure. No defective tubes were detected in Steam Generators 1, 3, and 4. Thereforo, no tubes were plugged in those steam generators.

Complete inspection results will be submitted by March 11,1991, in accordance with the requirements of Technical Specification 4.4.5.5b.