ML20198L663

From kanterella
Jump to navigation Jump to search
Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21
ML20198L663
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/18/1998
From: Beasley J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1285, NUDOCS 9901050084
Download: ML20198L663 (2)


Text

\

J. Bernie Beasley, Jr., P.E Southern Nuclear Vice President Operating Company,Inc.

SAFEGUARDS MMATION Vogtle Project 40 invemess Center Parkway ENCLOSURE CONTAINS SAFEGUARDS INFORMATION y P.O. Box 1295 UPON SEPARATION THIS PAGE IS DECONTROLLED '

Birmingham. Alabama 35201 Tel 205.992 7110 Fax 205.992.0403 SOUTHERN COMPANY Energy to Serve nur World" December 18, 1998 LCV-1285 Docket Nos.: 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D. C. 20555-0001 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING ILANT PHYSICAL SECURITY AND CONTINGENCY PLAN AhfENDhfENT NO. 37 In accordance with 10 CFR 50.54 (p) and 10 CFR 50.4, Southern Nuclear Operating Company hereby submits three copies of Amendment 37 to the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Physical Security and Contingency Plan. By copy of this letter, two copies of Amendment 37 are being provided to the NRC Region II OfBce.

This amendment includes: 1) changes to Section 4.L2.5 which describe the steps to be taken due to the installation of railroad derailers; 2) a revision to Section 5.3.3.4 to delete the requirement to have a security lock in addition to a high strength cable seal when the seal meets certain pull pressure limits; 3) a change to Section 6.3.1 to incorporate guidance relating to intrusion detection equipment performance test frequency; 4) a change to the Glossary for the dennition of " Security Seal"; and 5) a revision to Section 9.1 to provide the current minimum number of required armed responders.

Enclosure 1 provides the description and justification for the changes, and Enclosure 2 contains the actual Amendment 37 pages. Enclosures 3 and 4 give insertion instructions g and the new effective page list for the VEGP Physical Security and Contingency Plan.

Only Enclosure 2 is safeguards information and should be withheld from public Ng 7 [F 1) disclosure in accordance with 10 CFR 73.21. /

Please contact this ofDee if you have any questions.

SAFEGUARDS INFORMATION L35 w aa f' Sinc ely' ms oocument couwus sArecuanos wronwoon SAFEQUARDSINFORMATION W AccoRDAucs wm4 to crn 73.23. uNAUTHORRED ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

,- nan r=ms or courensa suaxcnocrva.

Amo UPON SEPARATION THIS PAGE IS DECONTROLLED $ Be e J b /f' N 9901050084 981218 -

U

- Date: '

PDR ADOCK 05000424 F _ PDR_ mg. lPq,.*cer

  1. c OrganizadoPNESP-MEL Enclosures and xc: (See next page)

k SAFE 00ARDSINFORMATION

  • ' ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED l

U. S. Nuclear Regulatory Commission Page 2

Enclosures:

1. Changes and Justification
2. Amendment 37 - Revised Pages (SafeguardsInformation)
3. Insertion Instructions
4. Effective Page List xc: Southern Nuclear Operating Comoany Ms. R. H. Parker (w)

Mr. J. T. Gasser (w/o)

Mr. M. Sheibani (w/o)

U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator (w/2 copies)

Mr. D. H. Jaffe, Senior Project Manager, NRR (w/o)

Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o)

SAFECUARDS INFORMATION LCV-1285 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED