ML20205H405

From kanterella
Jump to navigation Jump to search
Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1)
ML20205H405
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/25/1999
From: Justin Fuller
AFFILIATION NOT ASSIGNED
To: Hoyle J
NRC OFFICE OF THE GENERAL COUNSEL (OGC), NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20205H352 List:
References
NUDOCS 9904080188
Download: ML20205H405 (4)


Text

s' W DALTON UTILITIES March 16,1999 W tor, Ught and Sinking Fund Commission R O. Bcx 869 Dalton, GA 30722-0869 Tel: 706-278 706-278-7230 Docket Nos. 50-424 T e: 1-888- 313 50-425 g g a  %

Mr. John C. Hoyle, Secretary E N 1000 fo U.S. Nuclear Regulatory Commission

$ VicePresidentand $

ATTN: Rulemakings and Adjudication's Staff Grwa:e Counsel &

Washington, D.C. 20555-0001

'4 4 p N 68L99 Vogtle Electric Generating Plant

" Financial Assurance Requirements for Decommissioning Nuclear Power Reactors" (63 FR 50465 dated September 22.1998)

Dear Ladies and Gentlemen:

As provided in 10 CFR 50.,75(f)(1), each power reactor licensee is required to report to the NRC, on a calendar year basis, beginning on March 31,1999, and every 2 years thereafter, on 7 e status ofits decommissioning funding for each reactor or part of reactor it owns.

The Water, Light anJ Sinking Fund Ccmmission of the City of Dalton, operating as Dalton Utilities, hercty submits the information for operating licenses NPF-68 and NPF-81 as requested in accordance with 10 CFR 50.75(f)(1) for the Vogtle Electric Generating Plant. It is recognized by Dalton Utilities that Southern Nuclear Operating Company (Southern Nuclear) will be providing this information to the NRC along with the other Co-Owner submittals. Although Southem Nuclear holds the operating license, Dalton Utilities is one of the licensed owners of Plant Vogtle, units 1 & 2, owning 1.6% of the facility.

Based on the information presented in enclosure one and its attachment, there is reasonable assurance that the Dalton Utilities ownership prorated amount of the NRC prescribed minimum will be available to decommission Plant Vogtle units 1 & 2 on the current expiration date ofeach unit's operating license as set forth in 10 CFR 50.75(c).

Should you have any questions conceming this matter, please call Tom Bundros @

(706) 281-1035.

Respectfully submitted, b

Cope President & CEO 9904000188 990331~

PDR ADOCK 05000424 I PDR,

%* v\ \ '

pi. :,-

l l

l l U.S. Nuclear Regulatory Commis' ion Page Two I cc: Southern Nuclear Oneratine Comnany Mr. H.L. Sumner, Vice President - Plant Hatch U.S. Nuclear Regulatory Commission. Washington. DC Mr. L.N. Olshan, Project Manager - Hatch U.S. Nuclear Regulatory Commission. Region il Mr. L.A. Reyes, Regional Administrator Mr. J.T. Munday, Senior Resident Inspector - Hatch l

l r

I-l' a

f.>

1 l

l 1

l Enclosure One l

Vogtle Electric Generating Plant The City of Dalton I Ownership Percentage- 1.6% I 10 CFR 50.75 (f)(1) Requirement Unit 1 Unit 2 )

1 1 The nummum decommissioning fund estimate, $4,503,000' $4,503,000' l Pursuant to 10 CFR 50.75 (b) and (c) ' }

2 The amount accumulated at the end of the $5,791,070 $6,045,998 calendar year preceding the date of the report for items included in 10 CFR 50.75 (b) and (c).

3 A schedule of the annual amounts remaining to See Schedulein See Schedule in ,

be collected; for items in 10 CFR 50.75 (b) and Attachment 1 Attachment / l

.(c) 7 The assumptions used regarding: N/A N/A Rates of escalation in decommissioning cost y yg9 Rates of Eamings on decommissioning funds Rates of other factors used in funding projections N/A N/A 5 Any contracts upon which the licensee is relying N/A N/A purstant to 10 CFR 50.75(e)(1)(ii)(c) 6 Any . modifications to a licensee's current method N/A N/A providing financial assurance occuring since the last submitted report.

l 7 AnFlerial changes to trust agreements N/A N/A 1 The NRC formulas in section 10CFR50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in the NRC deconunissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to DOE are not included in the cost formulas.

l 2

This number is based on NUREG-1307, Rev. 8 for the Burial factor and the December 1997 values for the Labor and Energy factors.

q,' g

- h -

k EeaR -

9 9

/

5 0 0 0 1 e 0 0 0

/ u 0, 0, 0, 3 l a 0 4 4 V 3 2

9 2 5

r 2, a 6 7 3 P 1 1 3 l

a m

s te e 8 d n lu 0 8 6 n a 7 9 I

u d 0, 9, 0, F n V 1 5 7 l a t

e 9 4 3 a l kr 7, 0, 8 o a t

1 a 5 6 1 T m M $ $ $

t e

x E e l

u 3 2 5 a 4 1 5 V 7, 1, 8, g 6 0 6 n 2 7 9 i

v 7, 9, 6 r 5 1 r 5 a $ $

1 C

e 0 0 0 u 0 0 0 l

a 0, 0, 0, V 0 4 4 3 9 2 n r 0, 2 3, o a is ) P 4 4

8 s s d

i. sn n

. dnpo u

. F e

oAuu F o a u 6 8 4 CG gC 5 7 3 l

n a 2, 4, 7, V

i d n,no k n on n t 2 4 6 i r9 i e 9 1 0 ut l aiZo e 9 S k 3, 6, 0,

( 91 F " r gds l a a 3 3

7 ss inf i e yr 's

)

n M knymn omcu(a$ t m

n e na u it i SiCc ol aa l a

7 2

2 0

9 2

d e eBJ V 0, 3, 3, n hDt a Tr a 8 9 7 _

t n n 7 9 7 _

hf igoe n ae i v

r 3,

3 5,

3 9,

6 L

l ct s ue C r

a $ $ $ _

r, Nv t

e i n

a W

0 0 0 e 0 0 0 l

u 0, 0, 0, _

a 0 0 0 _

V 0 0 0 r 2 0, 2, a 2 3 5 P 1 1 2 d $ $ $

n u

F e

"a u 4 0 4 n l a 1 2 3 i

k V 8, 5, 3, n t 8 1 0 i

S e 9 3 3

" ia 3, 4, 8, l

a 2 2 4

-i n M t

e x e _

E u 6 0 6 la 1 1 2 V 7, 8 5 a 8 0 9 n 4 7 1 _

ivr 3, 3 7, r 2 2 4 a $ $ $ _

C ic t

a 2  :

o 1 la V

t it n

t i

n t o

n U U T l

a P

r