Insp Repts 50-275/69-03 & 50-237/69-05 on 690328.No Nonconformance Noted.Major Areas inspected:QA-QC Re Primary Coolant Sys Components for the Plants
ML20154F073
Person / Time
Site: Dresden, Diablo Canyon, 05000000
Issue date: 04/11/1969
From: Andrea Johnson, Spencer G, Vetter W
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML20154C370 List:
References
FOIA-88-156 50-237-69-05, 50-237-69-5, 50-275-69-03, 50-275-69-3, NUDOCS 8805230081
Download: ML20154F073 (16)


Text

._ _ . _

i

i

( ( .

U.-S. ATOMIC ENERGY C0;?tISSION DIVISION OF COMPLIANCE i i REGION V '

s, Report of Inspection I C0 Report Nos. 50-275/69-3 50-237/69-5 i

Licenses: . Pacific Cas & Electric Company '

Lia>Io Canyon No. I Construction Permit No. C??R-39 Ceccgory A Cor.tonwealth Edison Cocpany Dresden II ,

Construction Permit No. CP?R-lS l Catcaory B ,

Date of Inspectiont F: arch 28, 1969 Date of Previous Inspection: March 11, 1969 (Diablo Canyon site)

Inspected byt * . /: ' ' . ! /l

?. .. w. - ./8.s/'/

A. D. Jionnson / I Reactor Inspector (Diablo I)  !

I fh.b W. F. Vetter Y ~ // * $ $

Reactor Inspector (Assist Inspection - Drcsden II)

Reviewed by:

' . V.. . e * '/ M65'  !

i G. S. Spencor

. - . . w .- ..er.ccor Incpecior i

Proprietary Information: Nonc j

. =

8805230081 880510 PDR FOIA MCMILL ANBO-156 PDR

t

( C -

2-SLTARY

1. The contract between Westinghouse and ESCO for the purchase of the Diablo Canyon primary coolant systca fittings contaiacd the necessary conditions to assure that the manufactured fittings would be consistent with the requirements contained in the PSAR.
2. Quality control rce,uircaents fQr che Diablo Canyon fittings woro found to be consistent with those outlined in the PSAR. The i

requirements have been included as conditions in the purchasc order agreement.

3. Appropriate documentation of the work performed by ESCO is generated to show that the fittings have been canufactured in conformance with the purchasc ordwr cpecifications.
4. ESCO's quality control programs include provisions for testin; materials obtained f rom other firms.
5. Both PG&E and Westinghouse conduct inspeccion progre.ns to accure themselves that the fittings proeuced by CSCO arc of the qualicy specified in the purchase ordcr agrecmont. The Westinghousc inspection activitics appeared to be ccmprehensivc. PC&2's activities appea cd to be more of an audit t ype nature.
6. The ESCO data package covering the manufacture of the Dresden II recirculation pump suction covers was found to be adequately informative and indicated desirabia product quality (see Section D. of this report).
7. Our review of ESCO's Quality Assurance (QA) program. produced gratifying results in that the program appears to be up-to-date, comprehensive and consistent with good QA program criteria (see Appendix A of this report). ,

_D_ ETAILS I. Scope The Electric Stocl Company (ESCO) Corporation, located in Portland, Oregon was visited on March 25, 1969. The purpose of the visit was l to:

i 1. Evaluate the ESCO Quality Assurance Program relative to primary coolant syaten conponents for the Diablo Canyon No. I and Dresden II reactors.

1 1

. i J t

( *

  • I i 3 t i l
2. Review ESCO's Quality Control efforts related to the primary
  • l coolant system components for the Diablo Canyon No. I reactor.  ;
3. Review ESCO's Quality Control offorts related to the primary ,

j coolant pump suction covers provided for the Dresden II reactor. '

4  !

! The principal persons contacted during the visit included tho

, following: .

I Mr. B. Kirby - Vice Pros'ident ESCO  ;

Mr. R. Croshart - Manaccr, Quality Control and Inspection ESCO

~

i Mr. Phil Schwab - Manager, Atcmic Power Department ESCO  :

Mr. R. E. Richmond - Senior Product Enginocr. ESCO  :

] Mr. J. Waters - Quality Assuranco Supervisor, ESCO  ;

Mr. C. W. Oldham - Quality Assuranco Supervisor, ESCO l 4 Mr. W. R. Porbes - Supervising Inspection Engineer, PC&E t j Mr. N. S. Roose Senior Qualicy Control Engincar. Westinghouac l Mr. R. D. Page - Quality Control Enginecr, Westinghouso I j Mr. E. W. Ziebell - Quality Control Engineer, General 21cccric

.i II. Results of Visit t

A. ESCO Quality Assurance Proerams I i

Mr. Robert Croshart, Manager. Quality Control and Inspection, JSCO, i presented a 45 minute, prepared talk which was developed to provido l information relativo to the general aspects of thn plant QA-QC  ;

programmatic efforts. An analysis and evaluation of the QA  ;

} program, prepared by W. E. Vetter, is shown in Appendix A to this l j report. The analysis and ovaluation are based on the information ,

provided in Mr. Croshart's presentation, his response to questions l
posed by the inspector following the presentation, and later )

j meetings with ESCO QA-QC personnel. i i 1 l B. Enro cuality car,t rol . nd Ta.e ,ection r,rr.enir.arion i i

The followina ti.aer n. ion was v6 iacd durina utseussions relaciaa j to the status, responsibilitics sad activitics of the Quality Control and Inspection Unit at ESCO.

1. The Quality Control and Inspection Unit enjoys Dcpartmancal j status within the Cocpany. Mr. Croshart, the Manager of the Depa rtment , reports directly to a Vice President of thu j i

Company. '

}

1 a

J

t

. L

. r t

i

. r

-4 [

i I

1  !

1- .

2. The Department's current coiapicmont of personnci consists of l three quality control engiaccrs and three clerks. ,

t

3. Primarily the responsibilic" of the Department in to rcview  !

all purchase orders and dw.emine the requitcuents involved l' to fulfill the orders. Thv e requirements reiste to:

j 'a. Personnel qualification. f I b. Applicabic standar,do; whether commercial or military. i j c. Material requirements.  !

d. Inspections.  !

1 e. Acceptanco standards.

} f. Wolding requirements.  ;

{ g. C1 caning. i j h. Heat treatments.

! i. Packaging and storacc.

1 j. Documentation.  !

k. Manufacturing procedurcs - doccraine whether ESCO'a.  ;
standard procedures are adequate i,.nd, il not, gancraec i appropriate ones to manufacturo the component ac l prescribcd. All procedurca arc approved by Vice Presidents or Division Heads. All standard proccdurcs >

4 are reviewed annually by manageuent pervoanul. j

1. Assure that manufacturing procedurcs aru consistent i with all code or purchase order spccifications. }

4 Department personnel follow ESCO's manufacturing processoa to assure that work is being pcrlormed in accordance with the i appropriate designated procedures. Subsequent to completion l

! of the product, the records which provide the documentation  !

to show that it has been manufactured as specified by the  ;

particular contract are reviewed by a representative of the j Department. After approval of the documentation, the product i

j is delievered to the purchaser along with a data package l i

j consisting of the supportivo documentation relating to the l

article. i I C. Diablo Canyon No. I Primary Coolant Fittings 1 -

4 i The quality control effort related to the manufacture of the j Diablo C nyon No. 1 primary coolant systen fittings was rovicwed 1

by A. D. Johnson and determined to be as follows:

1 4

l 1 . i l

l 1

i i

9

~*~

l

\ 1. Relationship of Parties By contract, Ucstinghouse is responsible for supplying the piping for .the primary coolant system of PGLE's Diablo Canyon Unit No. 1 nucicar plant. Westinghouac,.in turn, has contracted to purchase the fittings to be used in the

, system from Electric Steel Company (ESCO). located in Portland, Oregon. ESCO operates a foundry wherein such components are cast and fabricated.

When a particular component has been accepted by Westinghouse from ESCO, the component is tentatively assigned to a specific projcet, nowever, Westinghouse reserves the right to rea.:aign components to other projects. Therefore, it cannot be stated with certainty that a particular component 1 caving JSCO will be unconditionally appropriated to the contract existing I between PG&E and Westinghouse for the primary piping systou of Diablo Canyon Nucicar Plant No.1.

2. Purchase Order Specificatior.s The inspector reviewed the purchase order given to ESCO by Westinghouse for fittings to be used in fabricating the primary piping system for the Diablo Canyon nuclear plant.

The order 1 poses upon ESCO, conditions relative to design, materials, applicable codes, quality control, nondestructive testing and documentation to show that the conditions have been performed. The following information was obtained from the review of the purchase order-

a. Specification of Fittings The purchase order specifications for the fittings werc l consistent with the requirements prescribed in Section 4 1 of the Preliminary Safety Analysis Report fur Diablo Canyon Nuclear Plant No. 1. Specifically, the desir,n

. . . . ,~ -

... .. - 2 ntipuu.ccd tu be 2/,LJ pain aad 6Lv'i, re:,pe c t ive ly.

The urder also proscribed the dimcasions of the fitting 3 and that the fittings be cast of catorial conforming to the standards of ASTM-351-C76M with a maximum cobalt content of 0.27..

b. Quality Control acquirements l The specifications of the purchas,c order concerning quality control requirements were obscrvod to be consistent uith the requirements of the prolininary i safety analysis report for Diablo Canyon No.1 nucicar plant in that: j i

)

\ (1) The design analysis was specified to. roc; ,rc compliance with the requirements of USA d.I.

331.1 codo for preasure piping.

(2) The specified nondestructive inspection requirements included dye penetrant and radiographic testing.

(3) Conditions wer.c included which requ. : that ESCO submit the manufacturing proceduces (e.g. uciding, heat treat =cnt, cic.. Gng and inspection) to Westinghouse for ccview and approval.

(4) Provisions have been included whereby Westinghouse has the right of inspection and in cortain arcas the duty to inspect and approve recorded results of tests.

(5) Repair of defcets are required to be approved by Westinghouse.

3. Component Quality To determine whether or not ESCO is properly impicmenting the quality Control Program to assure that the pipe fittings are manufactured in accordance with the purchase order specifications, the inspector reviewed availabic documentation concerning a 900 fitting currently assigned to PG&E's nucicar plant. At the prcsont time, onc 900 and four 400.fittingc have been tentatively assigned to the Diablo Canyon project, according to Mr. Page of Westinghouse. From the review of the documentation and discussions with Messrs. Roose, Pago and Waters, the following information was' obtained. .
a. Material Identification t

All components are identified by heat numbers. A particular number is assigned a particular heat of i metal. The number is provided for in the molds and thereby cast directly into both the component and  !

corresponding test coupons when the metal is poured.

This heat number is later included on an information plate which is later welded to the component. All information concerning a particular component can only be traced through the heat number.

b

-, , , . ~ , ,---n ,

,,, n.- , < - e ,,,n-e,,..e. -e, we , , , . - - . , - - .a.,n- ,, -

3 b. Design Analysis -

A stress analysis of the fitting was performed by ESCO personnel. According to Page, the analysis rep)rt contained in the data package has been reviewed and approved by competent Westir.shouse design parsonnel, c, . Casting The 900 fittings arc, cast in horisontal halves and later welded together. The casting molds are of selective sand,

d. Material specification .

Prior to pouring a particular heat Hof metal a macs spectrographic analysis is performed of the metal to ascertain whether or not the chemical cc= position conforms wich the prescribed specifications. Latet, '

after casting, additional analysis of the metal is performed to det.*rmino che chemical composicion of the material. The . red test coupons are also cosced to determine the aaaical proporties of the cetal.

For the particular fitting under review by the inspector, the information contained in ESCO's

, metallurgical report of analyses showed that the 3

material conformed to the contract specifications as to both chemical and mechanical properties.

i

e. Heat Treatment ,

i Subsequent to welding and repairs, the entire fitting is subjected to heat treatment-at temperatures of approximately 20000F for a duration of approximately

  • four hours. The specifications required heat treat-ment at a te.,perature in n:: cess of 19500F for a

.lo cat i ..: oi c . . . . tr pa r iach o i ..c e' .re.m .

Recordings oi cha haac creatments were iue..;;i' led by an appropriato stamp with provisions' included to show that the treatments had bocn reviewed and approved by Westinghouse. Mr. Page stated that the ESCO heat treatmeat procedures have been approved by Westinghouse.  ;

s i f. Welding Procedure The procedure used for welding the compone.ms is an ESCO standard proceduro. Mr. Page stated .: bat as per the contract provision, Westinghouse has . viewed and approved the procedure. Also, of note, Mr. Waters stated that ESCO manufacturcs components for the U. S.

. Navy to be used in nuc1 car systems and thac ::he procedure also conforms to the requirements of the Navy for like work.'

g. Welders Wolding personnel are qualified for certain work by

, ESCO as por Section IX of ASM3 Eoiler and Pressurc Vessel Code. The qualifications are reviewed by the Defense Contract Administrative Services Office (DCASO) located in Portland, Oregon. According to Mr. Waters, welders carry a card shouina their qualifications, ne added, however, that the wolding supervisor is respons-ible to assure that only qualified uciders work on the particular macerial in question. Wolders arc requalified quarterly, according co Mr. Waters. Mr. Page stated that the welders qualificacions are reviewed by Westinghousc. Also, welders are identified in the records as to the work perforacd.

h. Welding Rod Mr. Waters stated that due to previous probicms of controlling welding rod material, strict administrativa controls have been implemented. All rod material is stored in a separato room and only the welding super-visor may authorize withdrawal of rods from storage.

The rods are given an 2SCO identification nu:aber which is then used to identify the welding rod to be used on

, a particular job. Waters added that when a wclder completes his uork, he is required to return all unused material. -

According to Waters, instancos have occurred where the welding nutcrial has been other than stipulated when obtained from che manufacturcr of the rod. To climinate this possible gap in control, a sampic of rod material is now analyzed when roccived from the vendor to assure that the rod caccrial is properly identified. i

9

i. Nondestructive Testing The records of nondestructive testing of the primary system fittings indicated 1007, coverage by both liquid penetrants and radio;raphy.

Subsequent to repair 22 defects and heat treatment, the repaired areas were rechecked. Mr. Waters stated that the records cantain the complete history of all repairs and tests.

The radiographs are read by two individual ESCO employees and then viewed by a Wootinghouse inopcetor who signs the record indicating approval and acceptance of the product. Those radiographs are then viewed by ,

a PG&E inspector according to Forbes.

The contract specifications require that the radiographs be mado in accordance with the provisions of ASTM E94-62T and accepted in accordance with ASTM E-136-6ST, severity level 2 cxcept that cacogorics D & E are unacceptable. The radiographs are produced using type AA film with a cobalt-60 source. According to c report of PG&E's inspector, "the radiographs we-of reasonobly good quality with the 3.0 penetrar.~. .

easily readable."

The records and cortifications by ESCO and Westinghouse  !

showed thct the *above requircracnts have been complied i with before the fittings have been accepted by '

Westinghouse. Although rccords concerning the radiographs are transmitted to Westinghouse, the film itself is retained by iSCO.

j. Cicaninq
. . a t .. . 4 o .;, ;i...; ;>ee
u. .- t o i
h ..a the fli. ting Joilown by c na'ng uich de.nineraliaed water. Itoucver, the cicaaing solution now being used is Igepal which is an urganic cicaning solvent according l to Waters. The c1 caning specificatione required  :

concentrations of ciloride ions in the cicaning solution to be less than 10 ppm.

. i i

~, ,, - - - . - .. ..,n. ., . . - - - . . - - - - - . , . , . , ,

( ( s .

N

k. Pickling According to both Westinghouse and ESCO perconnel pickling of the component is excluded froa cae manufacturing proccca.

,1. S t ora ge Fittings were obsenved to be stored on wooden plates in the storage yard. All fittings were wrapped in plastic.

m. Shipping Mr. Page stated that che fittings will be shipped in a closed gondola car and that the components will be appropriately secured to prevent damage in transit. Soma littings have, in the past however, been shipped via flatbed cars according to Page,
n. Documentation r 3ased on the inspector's rovit.= all of ESCO's documentation pertaining to nucicar plant fittings manufactured for Westinghouse appeared to adequately show that the component had been manufactured as prescribed by the conditions of the contract. The contract between Westinghouse and ZSCO provides that copics of all documentation concerning the fittings pass with delivery of the components to Westinghouse.

Mr. Roose stated that copics of the documents related to a particular fitting pass to PG&E when appropriate as por the conditions of the Westinghouse and PG&E ,

agreement.

o. Westinghouse Inspections Mr. Page stated that under the Westinghouse-ESCO contract, Westinghouse has the r!ght to encer ac any time to observe work in process, and that all documentation is reviewed by a representative of Westinghouse to determinc ESCO's performance of the conditions contained in the agroomant.

e 8

\

i

p. PG&E's Insocctions
  • Mr. Forbes informou the ir.spector that representativos of PG&2 have audited cocumentation and test results at ESCO on two separate occasions prior to the current visit. He added that no significant deficicacies had been identified by the 2C&O inspectors. He also showed the inspector the reports prepared by- the PC&E inspectors subsequent to the visits. No deficiencics concerning ESCO's activitics were identified in the reports.

D. Dresden II Recirculation Pe- ? ".oction Covers W. E. Vetter met with Mossrs. Grachart , Oldhaa and Zicbcli, for a review of recorda associsced with the three primary recirculation systca pu.ap suction covers which were manu-factured for the Dresdca : reactor. The significant results of the review are as follows:

1. The three covers were identified as P.O. No. V-48666 (C2 to Byron Jackson) and P.O. No. 615313 (3yron Jackson to CSCO) .
2. They were manufactured during July-Au;ust, 1966.
3. Two of the covers are identified as heat numbers 5114-1 and 2 and the third as heat number 5147-1,
4. The base material w'as cortified (mill certification) as conforming, per purchase order requirements, to ASTM-A315 and C75M. l S. Nondestructive tcst- (radiograph and dyc penetrant) reports and repair charts disclosed that one m2jor .

and one minor casting defecc (sand inclusions) were decccced and re,..ixmt. . .o. . on cach o f tuo of the C O W i.. . . . .+. o. *- *

. .. a ~ JU;.d e d s free of defecca. W.c rept. e charts and inspeccion sign-off sheets indicate that, as required, radio-graphs were used to verify proper wcld repair after the first veld pass and half way through completed repair wcld in the case of the single major defect.

6. The purchase order called for, and inspection sign-off verified, welding activitics consistent with the requirements of ASM2,Section IX. , The records i also indicated that the veld rcpair work was performed in a conner consistent with ASME,Section III.

l l


1

(

( x -

' Although the suction covers were made of austenctic secci,

\ 7.

outside storage was not a probicm because the covers were shipped from the plant floor one day after final acceptance by GE-Byron Jackson inspection personnel.

8. Records of wcld (fillcr) material control and usage were not available for review. Mr. Groshart explained

-that such records were not ge:. orated as far back as 1966. He added, however, that current QA-QC proceduros provide for "High Perfbrc.ance Product" processing and that the subject records would have been maintained for the suction covers under the current proccdurcs.

9. The available records estab11ched that the two suction covers requiring. weld repair were subject to post-wold heat creatment according to code requircconcs.
10. Radiographs were not availabic for revicw, due to the clapsed time since manufacture of the suctioa covers, but Mr. Zeiboll stated that the quality of ESCO radio-graphs is excellent.

E. Management Interview The inspectors met with Mr. Kirby and members of his staff along with the Westinghouse and PG&E representatives at che conclusion of the visit. Subsequent to an explanation of the responsibility of the regulatory arm of the Cor.. mission in connection with PG&E's proposed nuclear plant, a bricf summary was provided of the inspectors' activitics during the visit. Mr. Kirby stated that he welcomed the visit indicating that ESCO gains from such visits in that out-siders many times see deficiencies not apparent to personnel close to the operation. He added that ESCO had been in the business of supplying products for nuclear applications for '

about 15 years and that it was che company's intention to otay in the field.

1 I

I I

I

. t l 1

I 1

l I

VZ::CO*t/ LICE::SES: ESCO C0a? ORATION - PORTLCD, OREGON l QUA L I fY .* ?St'.'U"L : - ' LITY CO:: TROL PROGR.*lls EFFECTIVENESS A:'ALYSIS 1

  • IV *

._ I . . . . _ _ IL II . . . . . . . _ _ .III _--

RESP 0:!SId1LITIES RECORDS DFSIGN-DESIGN O RGn, .,.,I ZAT ION A::D /.UTHORITIES A SYSTEMS g- DEV. AND C1!At:GES g ~.

S I -- V - .I- -- V- --1~

,__.___v__...-1 ----.-V------ - - - ,

l DOCU::E:.fATION INFORMATION REVIEW AND PROVISIO::S DEFIIIITION FLOW (FORI!AT) l _ _ _ . _ . .-.._..G. _.G_. APPROVAL -,G-

.__..__._y____._.2... \ __ 1 _ _v_ _ 2..

y _

m

_2. I EFFECTIVENESS RECORDS C0:01ISSION DEPIll -

REVIE!f g I-!ANIPULATION g I i :0TIFICATION _gg

_ . . _ . . . . . . . .A. . . - - - - - . . - - - . - - - - - . . - .

3 .._....V. 3 q 3_ _.______.y__.___.3 , _ _ , _ ,

9 C 'ALITY INTERFACE CllECKS AND INSPECTION ASSURA'!CE A PROVISIONS A BALANCES AWARENESS -A.

A_

v 4 y 4 O q PURCllASING .

__ QUALITY p CONTROL I AWARENESS A _ V_. v. . ._ .... _ .JL OVERALL RATING v 5 w* gp FAILURE --

CONT. DESIGN ANALYSIS g

  • G M= MARGINAL E= EXCLUDED G= GOOD
    • Itarginal in tiie "classical sense" A= ADEQUATE but currently adequate (see App.

A I.5.1.)

i&*:!A = I:ot applicabic /ppendix A, page 1. of 4 pages

I

(

1 (ppenc.ix a ACont. s .

4 1

s (A) I. ORGANIZATION (A) 1.1. Documentation availability was considered to be adequato in that organization cl. arcs were made available to all key personnel. ,

(G) 1. 2,. The scope and responsibilitics of QA personnel wora clearly documented.

(A) 2.1. Personnel backarounds were ovaluated by reference to documented minimum requircucats for each position.

The requircaents were found to provido for a top quality QA program.

(A) 3.1. Sta f fing for QA functions. . . broad programs. . . appears to be quite adequate in cac fcra of Mr. Groshart and two assistants.

(A) 3.2. QA-OC liaison functions are maintained on the basis of a relatively "small organization--al=ost hourly coneact" type of operation.

(A) 4.1. Sta f fing for QC functions appears to be more than adequate. In addition to an adequate inspection team, Mr. Groshart's staff incluces three QC cngineers, three QC technicians and stenographic personnel. .

(A) 4.2. See comment under 3.2., above.

l (M) 5.1. Failurc, perforr.r.nce analysia program personnel are r.ot I

formally included into the QA programs. According to Mr. Groshart, a couplete absence of field failures and the lack of on plant performance test requirements for most of the ESCO products, has precluded the need for '

a formal failure analysis program. However, a program

..n- .. .

, e t, e . . 4 2 . . . u .. .e I oi .... .o .o.. .. ., . . . " e. . c. . . uc. ... u" . . .c l studied with ..o eye eo cudacing ucicec free,ueacy.

(A) II. RESPONSIBILITICS AND /.UT!'.ORITY (G) 1.1. Quality of definition (scope-clarity) . The QA program responsibilitics and authority are well established by the conventional methods (organization charts and position descriptions.

(G) 1.2. Responsibilitics appear to be adequately commensurate witii authority. Ecch position in the QA program is assigned full authority to function in a mannor consistent with escablished ecsponsibilities.

o 3

(A) 2.1. program of fcetiveness review provisions are thoroughly -

\ provided for in the form of QA prograus and management appraisal...once cach yearj by a corporato level review 4 committee.

(A) 2.2. Morale, quality inculcation programs (e.g.: Zero defect) are not provided on a formal, sophisticated basis.

However, a strong motivatioa for manufacturing high quality products exists in that, once cach year, one-

~

third of the company. profit is passed on to che employees in the form of a cash bonus.

(y,) 2.3. Failure analysis programs are nonexistent, por so, except in an a'ctract o form (sco I 5.1, above) .

(A) 3.1. Program interface and overlap considerations appear to be more than aucquate. . .primarily due to a relatively small, harmoniously oriented, organization structure.

(G) III. RECORDS SYSTEMS (G) 1.1. A system to control and implcmont the flow of informacion betwoon QC, purchasing and inspection personnel has been provided. This system is conventional in chac all information requires "reply by endorsement".

(G) 1.2. Th information critoria and format design includes up-to-date standards and rendition techniques. For exampic, all wold repair efforts include "before a?.d af ter" drawings showing the scope and location of repairs.

(G) 1.3. The scope of records appeared to be adequate in that  ;

enough information was available whereas the inclusion i of extraneous information appeared to have been avoided. .

(A) 1.4. ,P;ccords catnin-ina uns denonstrated to be execlient in v  ;. . . _ . .. : r. c u eu . 1 . - t : vu ....

oy ce seceace 6o ,iuccoc :.e ocder - joo order ero,a indexing.

(G) 2.1. Records location provisions were found to bc more than adequate in that all portinent information is maintained on plant.

l (A) 2.2. Records availability was found to be adequate (sco Ill 1.4. , above) .* J

  • This comment reflects current practices and should not bc related to an earlier conment relativo :o the Dresden II recirculation pump suction covers.

A.. au. . 4 - -

&e m A: m

.g.

(G) 2.3. Records disposition prescnted no problems in view of

  • the fact that all QC records are retained for at least ten years.

(A) 3.1. Format check and balanco provisions are provided in the fo rm of flow and inspection sheet "stop and go" control on a basis of uultipic sign off requirements.

(G) IV DES _IGN. DESIGN DEUTATION .C L T ON CUANOES (G) 1.1. QA-QCpersonnelravbcworiginaldesignandallchanucs to assure that design characteristics will not adversely affect product quality.

(G) 1.2. Purchasinn perconnel review original design and all changes to assure design compatibility with catorial and/or equipacnt purchasing require.r. cats.

(NA) 2.1. Commiscion notificatic.. ,rocederca arc NA.

(NA) 2.2. Commission aceificacion lecd tir.c provicionn arc NA.

(A) 3.1. Inspectica oA-r.c notificacion of "change-chanac progres."

_is provided for in an aucquate manner on the basis of '

a relatively sun.., close-knit, QA-QC organization structure as wcl1 as by revicw acknowledgment sign-off requirements.

(A) 4.1. Purchasing notification of "change-change progress" is adequately provided for as above.

(G) 5.1. A program for continuing design evaluation (systems, procedurcs and components) is provided and appears to be very dynamic. Any and all design weakaesses (characterictics noted during components manufacturing which might compromisa quality) are called to the cuccomars attentica !cr coacideracion.