Text
-
T
[g.
r
S AFEOi'. bs'40S 4?e UMM AD2
J.;
The information on this page-is considered to be' appropriate
for public, disclosure pursuant to 10 CFR. 2.790
U. S. NUCLEAR REGULATORY COMMISSION
<
REGION V
l
Report No's.
50-275/89-20 and 50-323/89-20 (IE-V-898)
Docket Nos.
50-275.and 50-323
License Nos.
Licensee:
' Pacific Gas and Electro: Q.roany
77 Beale Street, Room 1451
San Francisco, California 94106
Facility Name:
Diablo' Canyon Power Plant (DCPP), Jnits 1 and 2
Inspected At:
San.Luis Obispo County, California
. Inspection Conducted: July 10 through 18, 1989
q
..
Inspector:
l
G < i']
!
E
l
^!
e-
D. W. Schaefer, Physigal Security Inspector
Date Signed
1
Approved By: hh b
1//Ett
M. D. 6chuster, Chief, Safeguards Secticn
Dats Si'gne'd
Inspection Summary:
Areas Inspected:
This routine unannounced inspection by a region-based
inspector examined the following portions of the licensee's physical ' security
program:
Physical Security Program for Power Reactors (CORE Inspection
Program); Security System Power Supply; Access Control-Personnel; Personnel
Training and Qualification Plan; and Follow-up on Events, Generic Letter, and
Inspector Identified Problems.
During this inspection, portions of Inspection
Procedures 30703, 81700, 81058, 81070, 81501, 92700, 92701, rind 92703 were
used.
- This inspection was begun during regular hours.
Results:
In the areas inspected, the licensee's security program appeared
adequate to accomplish their security objective. The licensee was found to be
in' compliance with NRC requirements within the areas examined during this
inspection, except for the non-cited violation in the area ot:
Compensatory
Measures (Inspection Report Details, Paragraph 6).
This non-cited violation
involved the licensee's- discovery of a contract security officer sleeping
while acting as a compensatory measure for a protected area perimeter alarm
zone,
8908140070 890731
"
ADDCK 05000275
G
..;. ..+. M "5
.. . .
'e
. . N[Md.E.'[ $$ [.
,
,,
,
,,,
..gg.
L .'Ai .1: - AT i ' '. 71 E
O
'* ' -
' ' *
^
- '
I A0B 4 " .r.
',!ROl.IC.
--
_ _ - - - _-.-___
. _ _ -
- - _ _ . _ _ _ _ - - - _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _
_ _ - _ _ _ _ - _ _ _ - -