Forwards Insp Rept 50-275/69-04 on 690430.Nonconformance Noted.Util Has Not Yet Formulated & Implemented a Formal QA-QC Program for Plant Const.Plans for Implementing Schedule for June 1969 Noted
ML20154E967
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 05/13/1969
From: Andrea Johnson
US ATOMIC ENERGY COMMISSION (AEC)
To: Spencer G
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20154C370 List:
References
FOIA-88-156 NUDOCS 8805230048
Download: ML20154E967 (2)


Text

_ . . - . .

e' .

UNITED STATES i .I <. s J. j ATOMIC ENERGY COMMISSION g ,7 Division OF COMPLl ANCE RCOlON V 2111 BANCMOFT WAY BennELgy, C AtironNI A 94704 va.amma, ui sm Est. M l May 13, 1969 J

l f G. S. Spencer, Senior Reactor Inspector Region V. Division of Compliance PACIFIC GAS & ELECTRIC COMPANY (DIABLO CANYON UNIT NO. I) f4CKET NO. 50-275 The attached report contains the details of my recent visit to PG&E's home offices in San Francisco, California on April 30, 4

1969.

1 In view of the absence of significant construction activities [

to date, the applicant's quality assurance efforts have primarily been directed toward design activities and vendor inspections. You will note that PG&E has not yet formulated and implemented a fomal QA-QC program to be followed for the

! construction of the Diablo Canyon No. I nuclear plant. However, _;

l PG&E plans to implement such a plan prior to start of construction  :

l of the major civil structures for the unit, currently scheduled j for the last week of June,1969.

1 Although it appears that PG&E personnel have evaluated the changes made to the containment building design from that described in the PSAR and have found the changes not to be detrimental. DRL may wish to review the changes and confim or deny PG&E's evaluation. You will also note that PG&E has not and does not intend to have Westinghouse approve the containment building design as indicated in the PSAR.

Concerning the question raised during the vendor inspection at ESCO Corporation relative to disposition of the radiograph films of the pipe fittings manufactured by ESCO, PG&E does not intend to secure and retain the radiographs. i i  ;

ff ovfdt.w

' A. D. Johnson Reacto inspector

! 8805230040 000510 PDR FOIA MCMILLANBO-156 PDR h-y I

, / / 1

2-SUMM.ARY Currently, PG&E does not have a formalized quality assuranco-quality control program per se in offcet for the construction of the Diablo Canyon No. 1 nuclear power plant. To date, the functions of such a program have been fulfilled by PG6E's Engineering Department acting as the quality assurance agent with the Gcncral Construction Department responsible for quality control. PC6E plans to submit during June 1969, a formal QA-QC program to DRL in connection with the application for a construction permit for Unit No. 2 to be constructed at the Diablo Canyon site. The proposed plan will also be applicable to Unit No. 1 and will be implemented prior to the start of construction of the major civil structures. (Soc Section B. of the report for details.)

Based on a preliminary review of the proposed contract specifications for the Class one structures of the facility, three variances were identified between the description supplied for the containment building in the PSAR and those contained in the proposed contract specifications.

PG&E believes the specifications, as written, are adequate to ucet the design criteria prescribed for the structures. PG&E indicated the changes would be documented in the FD&SAR. (See Section B. of the report for details.)

Concerning final film disposition of code required radiographs performed by and at vendor shops, PG&E currently does not intend to secure and retain the film. (See Section C. of the report for detstis.)

Although the wording in the PSAR indicates that Westinghouse review and approval was required for the containment building design change, Westinghouse's role was limited to review and comment on the design.

PG&E indicated that this was all that was intended by the language used in the PSAR. (See Section B. of the report for details.)

DETAILS A. Persons cc .cacted D. V. Kelley - Project Enginecr-Chief Mechanical Engineer J. L. Schuyler - Senior Mechanical Enginect W. J. Lindblad - Design Engineer ,

M. H. Chandler - Station Construction Manager A. J. Plewes - Construction Engineer J. 3. Hoch - Engineer R. V. Bettinger - Engineer W. R. Forbes - Supervising Inspection Engineer