Category:INSPECTION REPORT
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000157/19890011989-05-11011 May 1989 Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 ML20236B8851987-10-20020 October 1987 Performance Appraisal Nrc/State Contracts for Environ Monitoring on 871005-06.State Fulfilled All Requirements W/ Few Exceptions.Major Areas Inspected:Repts,Correspondence, day-to-day Contacts & Promptness in Resolution of Problems IR 05000018/19870011987-09-23023 September 1987 Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000263/19870081987-06-0808 June 1987 Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000293/19870051987-02-17017 February 1987 Insp Rept 50-293/87-05 on 870112-17.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Ie Bulletin 83-02 & Generic Ltr 84-11,inservice Insp Activities Including Review of Procedures & Licensee Action Re Oyster Creek IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000259/19860371986-12-15015 December 1986 Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000369/19860221986-10-30030 October 1986 Insp Repts 50-369/86-22,50-370/86-22,50-413/86-31 & 50-414/86-34 on 860804-08.No Violations or Deviations Noted. Major Areas Inspected:Licensed & Nonlicensed Operator Training IR 05000247/19860261986-09-22022 September 1986 Insp Rept 50-247/86-26 on 860826-28.Major Areas Inspected: Requalification & Initial Licensing Training Programs for Licensed Operators.No Tracking Sys for Assuring Compliance w/10CFR55.31(e) Requirements IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities ML20211N4461986-06-26026 June 1986 Enforcement Conference Repts 50-213/86-04,50-245/86-06 & 50-336/86-06 on 860618.Major Areas Discussed:Violations & Program Weaknesses in Radioactive Matls Transportation Program IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified ML20199F0381986-05-30030 May 1986 Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted.Major Areas Inspected:Independent Safety Reviews & Overviews by General Ofc Review Board,Audits & Previously Identified Items IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000455/19850471986-03-28028 March 1986 Insp Repts 50-455/85-47,50-456/85-60 & 50-457/85-56 on 851118-22.No Violations Noted.Major Areas Inspected: Implementation of Design Verification Activities 1999-09-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000157/19890011989-05-11011 May 1989 Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 ML20236B8851987-10-20020 October 1987 Performance Appraisal Nrc/State Contracts for Environ Monitoring on 871005-06.State Fulfilled All Requirements W/ Few Exceptions.Major Areas Inspected:Repts,Correspondence, day-to-day Contacts & Promptness in Resolution of Problems IR 05000018/19870011987-09-23023 September 1987 Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000263/19870081987-06-0808 June 1987 Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000293/19870051987-02-17017 February 1987 Insp Rept 50-293/87-05 on 870112-17.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Ie Bulletin 83-02 & Generic Ltr 84-11,inservice Insp Activities Including Review of Procedures & Licensee Action Re Oyster Creek IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000259/19860371986-12-15015 December 1986 Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000369/19860221986-10-30030 October 1986 Insp Repts 50-369/86-22,50-370/86-22,50-413/86-31 & 50-414/86-34 on 860804-08.No Violations or Deviations Noted. Major Areas Inspected:Licensed & Nonlicensed Operator Training IR 05000247/19860261986-09-22022 September 1986 Insp Rept 50-247/86-26 on 860826-28.Major Areas Inspected: Requalification & Initial Licensing Training Programs for Licensed Operators.No Tracking Sys for Assuring Compliance w/10CFR55.31(e) Requirements IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities ML20211N4461986-06-26026 June 1986 Enforcement Conference Repts 50-213/86-04,50-245/86-06 & 50-336/86-06 on 860618.Major Areas Discussed:Violations & Program Weaknesses in Radioactive Matls Transportation Program IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified ML20199F0381986-05-30030 May 1986 Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted.Major Areas Inspected:Independent Safety Reviews & Overviews by General Ofc Review Board,Audits & Previously Identified Items IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000455/19850471986-03-28028 March 1986 Insp Repts 50-455/85-47,50-456/85-60 & 50-457/85-56 on 851118-22.No Violations Noted.Major Areas Inspected: Implementation of Design Verification Activities 1999-09-13
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000157/19890011989-05-11011 May 1989 Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 ML20236B8851987-10-20020 October 1987 Performance Appraisal Nrc/State Contracts for Environ Monitoring on 871005-06.State Fulfilled All Requirements W/ Few Exceptions.Major Areas Inspected:Repts,Correspondence, day-to-day Contacts & Promptness in Resolution of Problems IR 05000018/19870011987-09-23023 September 1987 Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000263/19870081987-06-0808 June 1987 Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000293/19870051987-02-17017 February 1987 Insp Rept 50-293/87-05 on 870112-17.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Ie Bulletin 83-02 & Generic Ltr 84-11,inservice Insp Activities Including Review of Procedures & Licensee Action Re Oyster Creek IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000259/19860371986-12-15015 December 1986 Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000369/19860221986-10-30030 October 1986 Insp Repts 50-369/86-22,50-370/86-22,50-413/86-31 & 50-414/86-34 on 860804-08.No Violations or Deviations Noted. Major Areas Inspected:Licensed & Nonlicensed Operator Training IR 05000247/19860261986-09-22022 September 1986 Insp Rept 50-247/86-26 on 860826-28.Major Areas Inspected: Requalification & Initial Licensing Training Programs for Licensed Operators.No Tracking Sys for Assuring Compliance w/10CFR55.31(e) Requirements IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities ML20211N4461986-06-26026 June 1986 Enforcement Conference Repts 50-213/86-04,50-245/86-06 & 50-336/86-06 on 860618.Major Areas Discussed:Violations & Program Weaknesses in Radioactive Matls Transportation Program IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified ML20199F0381986-05-30030 May 1986 Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted.Major Areas Inspected:Independent Safety Reviews & Overviews by General Ofc Review Board,Audits & Previously Identified Items IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000455/19850471986-03-28028 March 1986 Insp Repts 50-455/85-47,50-456/85-60 & 50-457/85-56 on 851118-22.No Violations Noted.Major Areas Inspected: Implementation of Design Verification Activities 1999-09-13
[Table view] Category:UTILITY
MONTHYEARIR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000263/19870081987-06-0808 June 1987 Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000293/19870051987-02-17017 February 1987 Insp Rept 50-293/87-05 on 870112-17.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Ie Bulletin 83-02 & Generic Ltr 84-11,inservice Insp Activities Including Review of Procedures & Licensee Action Re Oyster Creek IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment IR 05000259/19860371986-12-15015 December 1986 Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000369/19860221986-10-30030 October 1986 Insp Repts 50-369/86-22,50-370/86-22,50-413/86-31 & 50-414/86-34 on 860804-08.No Violations or Deviations Noted. Major Areas Inspected:Licensed & Nonlicensed Operator Training IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities ML20211N4461986-06-26026 June 1986 Enforcement Conference Repts 50-213/86-04,50-245/86-06 & 50-336/86-06 on 860618.Major Areas Discussed:Violations & Program Weaknesses in Radioactive Matls Transportation Program IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified ML20199F0381986-05-30030 May 1986 Insp Repts 50-219/86-15 & 50-289/86-08 on 860430-0502.No Violations Noted.Major Areas Inspected:Independent Safety Reviews & Overviews by General Ofc Review Board,Audits & Previously Identified Items IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000455/19850471986-03-28028 March 1986 Insp Repts 50-455/85-47,50-456/85-60 & 50-457/85-56 on 851118-22.No Violations Noted.Major Areas Inspected: Implementation of Design Verification Activities IR 05000454/19860091986-03-11011 March 1986 Insp Repts 50-454/86-09,50-455/86-08,50-456/86-11 & 50-457/86-09 on 860225-26.No Violation or Deviation Noted. Major Areas Inspected:Engineering Allegations IR 05000254/19860031986-02-13013 February 1986 Insp Repts 50-454/86-07,50-455/86-06,50-373/86-05, 50-374/86-06,50-254/86-03,50-265/86-03,50-295/86-03 & 50-304/86-03.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program IR 05000275/19850381985-12-0909 December 1985 Insp Repts 50-275/85-38 & 50-323/85-36 on 851118-22.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Findings,Transportation Activities,Solid Waste Mgt Program,Low Level Waste Mgt & Licensee Events IR 05000275/19850321985-10-0808 October 1985 Insp Repts 50-275/85-32 & 50-323/85-29 on 850818-0928. Violation Noted:Nrc Inspector,Not on Approved Access List, Entered Class 1 safety-related Matl Storage Area Unescorted IR 05000295/19850351985-10-0404 October 1985 Mgt Meeting Repts 50-295/85-35,50-304/85-37,50-373/85-31, 50-374/85-32,50-454/85-41 & 50-455/85-29 on 850920.Major Areas Discussed:Items Re Exercise Scheduling for FY86 Exercises IR 05000275/19850241985-08-14014 August 1985 Insp Rept 50-275/85-24 on 850603-07.No Violations or Deficiencies Noted.Major Areas Inspected:Emergency Response Facilities Compliance W/Suppl 1 to NUREG-0737,including Technical Support Ctr & Operational Support Ctr IR 05000275/19850231985-07-30030 July 1985 Insp Rept 50-275/85-23 on 850610-28.Violation Noted: Weaknesses in Implementation of Qa/Qc Program Re Control of Measuring & Test Equipment & Unqualified Individual Assigned as Technician IR 05000269/19850141985-06-13013 June 1985 Insp Repts 50-269/85-14,50-270/85-14,50-287/85-14, 50-369/85-19,50-370/85-20,50-413/85-21 & 50-414/85-20 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ & Meteorological Programs IR 05000323/20050101985-06-12012 June 1985 Insp Rept 50-440/85-17 on 850323-0510.Noncompliance Noted: Failure to Provide Adequate Administrative Procedural Controls & Failure to Adequately Accomplish Release for Test pre-test Checklist Verification IR 05000269/19850131985-06-11011 June 1985 Insp Repts 50-269/85-13,50-270/85-13,50-287/85-13, 50-369/85-18 & 50-370/85-19 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping Sys IR 05000261/19850161985-05-24024 May 1985 Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted. Major Areas Inspected:Preoperational Radiological Environ Monitoring Program at Shearon Harris & QA at Harris Lab IR 05000323/20050061985-05-22022 May 1985 Insp Repts 50-424/85-13 & 50-425/85-13 on 850323-0506.No Violations or Deviations Noted.Major Areas Inspected:Qa,Fire Protection/Prevention,Containment Dome Reinforcing Steel & Tendon Sheathing & Cavity Liner Plate Welding 1990-10-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant1993-08-0909 August 1993 PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield1992-10-20020 October 1992 PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core1991-03-0707 March 1991 PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant1990-07-27027 July 1990 PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant ML20055J2001990-07-13013 July 1990 Notice of Violation from Insp on 900422-0609.Violations Noted:Work Order Which Provided Instructions for Replacement of Plant Turbine Driven Auxiliary Feedwater Pump Speed Governor Not Appropriate to Circumstances PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing ML20247N0071989-09-11011 September 1989 PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage1989-08-0808 August 1989 PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred1989-07-0505 July 1989 PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred IR 05000157/19890011989-05-11011 May 1989 Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred1989-04-0303 April 1989 PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants1989-03-23023 March 1989 PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process1988-11-0909 November 1988 PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000413/19880241988-10-13013 October 1988 SALP Repts 50-413/88-24 & 50-414/88-24 for Aug 1987 - Jul 1988 IR 05000369/19880211988-10-13013 October 1988 SALP Repts 50-369/88-21 & 50-370/88-21 for Aug 1987 - Jul 1988 ML20151U7701988-08-10010 August 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250,000.Violations Noted:Control Room Operators Observed Sleeping While on Duty,Reading Matls Not Directly Job Related & Failure to Rept Items to NRC PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault1988-07-18018 July 1988 PNO-V-88-048:on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities1988-06-13013 June 1988 PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends1988-05-0909 May 1988 PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item IR 05000354/19860991988-03-0404 March 1988 SALP Rept 50-354/86-99 on 861201-880115 PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom1988-02-16016 February 1988 PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom IR 05000272/19860991988-02-0505 February 1988 SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987 PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named1988-02-0202 February 1988 PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named ML20196D6151988-01-27027 January 1988 Exam Rept 50-275/OL-87-02 for Units 1 & 2 on 871208-17.Exam Results:Three Senior Reactor Candidates & Twelve Reactor Operator Candidates Passed Operating & Written Exams PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure1988-01-0404 January 1988 PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure ML20234E8071987-12-21021 December 1987 Corrected Notice of Violation from Insp on 861215-19. Violation Noted:Qualification Documentation for Limitorque Motorized Valve Actuators Did Not Establish Similarity Between Installed Actuator & Actuator Tested PNO-V-87-083, on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart1987-12-14014 December 1987 PNO-V-87-083:on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart PNO-V-87-082, on 871210,fire Occurred in Temporary Tool Storage Trailer in Vicinity of Unit 2 Main Generator Transformers.Caused by 120 Volt Junction Box,Possibly Overloaded from Portable Space Heater.Fire Put Out1987-12-10010 December 1987 PNO-V-87-082:on 871210,fire Occurred in Temporary Tool Storage Trailer in Vicinity of Unit 2 Main Generator Transformers.Caused by 120 Volt Junction Box,Possibly Overloaded from Portable Space Heater.Fire Put Out 1999-09-13
[Table view] |
Text
... - - . - .- _ _ . - - _ .
I
. I 4
(. ;
5 U. S . ATOMIC ENERG'.' CO.W.ISSION q
DIVISION OF COMPLIANCE I REGION V l J
i Report of Inspection l CO Report No. 50-275/69-7 i i i l i I
. Licensee Pacific Gas & Electric Company (
Construction Percit No. CPPR-39 ;
l
- Category A t
i Date of Inspection: Septecher 16, 1969 Date of Previous Inspection: June 26 and 27,1969 l 4
l I
Inspected by:
W# X'/a/f/ l A. D. J,chnson }
3 Reactor '
Inspector (In-charge) l
/i r . ,
'l f/
. i
? i
\ /O. / .!912% l j
J; I?.' Crews ((bifs[;'!
/ /- ;
Reactor Inspector ,
\)
Reviewed by: MAMV /
C. S. Sp'dncer i
! Senior Reactor Inspector f j Proprietary Information: None ;
i 1 l I
SCOPE l .
1 l
{
Type of Facility: Pressurized Water Reactor l l
Power 1.evel 3250 1:vt ;
! l 4 1 l
1 8805dOO327 000156 IL t p156 M i
j
(
2 Loc a t ion: Diablo Canyon, San Luis Obispo County, calif ornia Type of Inspection: Routinc Announced Accompanyinn Personnel: None Scope of Inspection: Thc inspcetion effort included a review of (1) the construction organi:ation cnd relationships botvcen PC&E, the prima construction contractor and the ceveral sub-contractors, and (2) the currently dcveloped QC procedures rels:ed to the construction of the contair.acnt buildin; cad other Class 1 civil structurcs.
SCOM'l Safety Iters - None Nonconforrance Items - None Status of Previously Reported Problems -
None Other Significant Items .
- 1. Detailed quality control procedurcs have been formulated concerning construction of the containncat building and other Class I structures. The procedures related to nonconforming coeponents and/or esterial did not cicarly delineate responsibilities and approval authority for final disposition. PG&E indicated additional consideration would be given to the adequacy of these procedures.
- 2. The initial placement of reinforcing secel for the containment ba se ro t is scheduled to commence in early October. A labor dispute which delayed the start of construction activitics for approxinately six weeks has been settled.
1 l
l
Management Interview -
At the conclusion of the visit, the inspectors met with Messrs. Kelly and Lindblad to review the scope and findings of the inspection effort. Mr. Kelly indicated that the items concerning clarification of approval authority for final disposition of nonconforming catorials and complete documentation related to placccent and curing controls for concrete would be given appropriate consideration to assure adequacy of the procedures.
DETAILS A. Persons Contacted D. V. Kelly -
Project Engineer J. O. Schuyler -
Senior Mcebenical Engineer W. J. Lindblad -
Mcchanical Engineer M. H. Chandler -
Panager, Station Construction R. S. Bain -
Construction Superintendent W. R. Hersey -
Project Superintendent L. H. Carr -
Quality Assurance Engineer, Cencral Construction Department R. R. Friedrichs -
Resident Civil Engineer A. J. PleweJ -
Construction Engineer K. A. Beede -
Engincar, Department of Engineerin; 2cscarch R. Mayers -
Inspection Engineer J. H. Searle -
Senior Faccrials Inspector J. L. Murin -
Civil Engineer, Q-A F. W. Brady -
Civil Engineer, Q-A J. Zipperer -
Q-A Spec ia lis t , Engineering Departrant W. N. Harris -
Q-A Engincer, Guy F. Atkinson Company i B. Concrete (Containment)
- 1. Implementation of Quality Assurance Program Mr. Bain outlined the licensce-contractor line and quality control organizations for concrete manufacture, testing, placement and curing. The stru .ture of PG&2's organization responsible for -
onsite supervision of contractor activities conforms to the organization table shown in Appendix B of CO Report No. 50-275/69-1. I Mr. R. R. Friedrichs has been namad the Resident Civil Engineer 4 responsible to the Project Superintendent, Mr. Hersey, to assurc '
that the contractors perform civil construction activitics in accordance with the conditions of the contract.
, . - - _ . _ -s _ _.
l I
i 4-Mr. Harris, representing the Guy 7. Atkinson Company, explained that Atkinson will perform the concrete work; however, sub-contractors have been employed to install the reinforcing secci, embedded piping, tanks and containment liner. I Harris outlined Atkinson's onsite construction organization as l follows:
I Proicet Mananer l l
i l A I Basiness Sa fety Concral Snoerintendent Eneincaring OA i
l l j s 4 0 Batch Plant Concreto Rincers Labor Pipinn Etc.
Concerning the relationships of the licensec-contractor, Mr. 2ain explained the duties of each as follows:
- a. Atkinson is to nanufactura, placc and cure the concreto I in accordance with the contract specifications.
l
- b. Atkinson is to receive all concroce catorials, assure that appropriate certification documents accompany all materials, confirm that materials as cortified conform to the appropriate code requirements, and provide a copy of the documents along i with material sampics to PG62 representatives.
- c. Atkinson is to preparo drawings of each concrete lif t for ,
PG6E 's approval. These detailed "lif t drawings" are to shov l the complete layout of the lift indicating dimensions,
- eleva tions , and loca tion. Embedded items are to be shown ,
such as anchor bolts, water stops and miscellancous metals. l The shop drawings will be used for placement of reinforcing steel, electrical conduit and piping. The lif t drawings are to also show the class of concretc and all finishes. A "Bill of dbterial" listing all materials or equipment required for the lift is to be included on each drawing.
- d. PG&E hos the responsibility and authority to inspect all constraction activities to assure contract conditions are being satisfied.
- e. PG&E is responsibic to obtain samples, test and evaluated results of roterials used in the construction of the facility. PG&E is also responsible to sampic and test the manufactured concrete to confirm that the manufactured product conforms to the coatract specifications,
- f. PG&E has the responsibility to inspect and verify that proper procedures are followed in placement and curing of the concrete as prescribed by the contract.
- g. PG&E inspectors are responsible to thoroughly understand the requirements of the contract specifications and applicable standards or codes pertaining to the work in progress. An inspector also has the authority to stop or reject all work which in his opinion is below specified quality standards if Atkinson does not take proper action to document such deviations as well as initiate the proper corrective measures. Such items and activitics are required to be noted on the inspector's daily report of activitics to the Resident Civil Enginecr.
- 2. Review of Quality Control System
- a. Mix Design According to Mr. Friedrichs, concrete trial batches containing various amounts of materials have been tasted and evaluated in accordance with the standard ASTM procedurcs. To date sufficient data have been accumulated to enable selection and approval of an appropriate mix for 3,000 psi concrete (Class B). According to Mr. Becde, this mix design was determined in accordance with method 2 of ACI 313-63 section 502. However, the mix for 5,000 psi concreto (Class A) has not yet been approved. The Approved Class B mix design was stated to be as follows:
Strength - 3,000 psi in 28 days Slump - 3 inchos Ingredient Ucipht - Pounds / cubic vard Water 291 Cement 498 Sand 1,330 3/4-inch aggregate 820 1 -inch aggregate 890 Air entraining agent (-) 12.5 11. oz.
Water reducing agent ( _ . 42 fl. oz.
- b. Temperature Limits The contract specifications include appropriate limits concerning temperature and delivery timo as reported in CO Report No. 50-275/69-6.
The batch plant is fully automated with its operation and batching cycle initiated by a mix card inserted into the control consolo. The card is checked by the ?GLE batch plant inspector to assure that che proper mix is used for the concrete placement in progress. Each concrete mix will' have an identifying number along with the design strength and the structure or structures for which its use is intended.
The plant is equipped with an autc=stic digital recorder which provides a record on tape of materials, time and temperature of the batch. The inspector is responsibic for verifying that the manufactured concrete conforer to the contract requirements. ?G&I's QC procedure also inscructs the inspector at the piscoment point to confirm from the bacch ticket that (1) the mix is proper for the locacion and (2) ,
the age of the batch is Icss than 45 minutes. Mr. Friedrichs stated that in view of the closeness of the batch plant to the work area, the age of the concrete at time of pouring should average approximately 15 minutes. he also added that the ambient temperature in the area seldom drops below 350 F in the winter or rises above 900F in the su=scr.
- c. Slump, Stronnth and Air Entrainment Tests The contract provides appropriate procedures and requirements '
concerning these tests as reported in CO Report No. 50-275/69 6.
PG&E's QC procedures include provisions establishing the frequency of tests and the standard ASTM proceduros to be followed in performing and evaluating the tests. The ;
procedures require test cylinders to be taken on a minimum '
frequency rate of 1 set for cach 100 cubic yards of concrc:' i ma nufac tured. These cylinders of concrete are to be used to determine the strength characteristics of the concrete 1 placed in the structurcs. The procedurcs also require that during the early stage of construction cylinders be cast at ,
time of placement to provido data to correlate strength '
characteristics of the concrete as mixed at the plant and after transportation to the placement site.
~7--
Slump and air entrainment tests are to be performed in conjunction with the casting of all test cylinders. In addition, the procedures require additional checks of slump and entrainment between casting cylindors. Also, clump is to be checked by the laboratory personnel should the placement inspcetor observe variations in the concrete being placed.
Documentation of all concrete test results is to be made on approved forms. All tests are to be identified as to the structure, placement and batch number for future re ferenc e.
- d. Curing Procedurce The contract requirements concerning curing of ccacreto have been documented in C0 Report No. 50-276/69-6. ?O&E 's QC procedures designate the placemant inspector as the responsibic individual to confirm that Atkinson follows the appropriate procedures as prescribed in the contract specifications,
- e. Placement Control -
Both Atkinson's and ?G&E's QC procedurcs requira that prior i to concrete placement , the particular area will be inspected l by representatives of both PG&E and Atkinson. Each represen- l tative is to sign the placcment card (checklist) indicating that the area has been inspected and approved. Itecs to be inspected and approved included: (1) cleanup, (2) line and grade, (3) forcs and blockouts, (4) reinforcing steel, l (5) inserts, (6) anchor bolts, (7) embedded metal (8) water i stops, (9) joint filler (10) piping and (11) cicetrical.
The inspector commented that the checklist contained no pro-visions for documenting confiraation that adequate personnel and equipment were available for the placement operation.
Both Harris and Friedricks indicated these items would be i added to the list along with a provision for the PG4E l placement inspector to document the fact that proper curing procedures have been implemented subsequent to placement.
The procedure for insuring that proper concrete is delivered to the proper location in the time required is keyed to the batch ticket which contains a mix design number and the time the batch was manufactured. The placement inspcetor is responsibic for verifying that the mix design number
8-is consistent with that shown on his lif t drawing. He is also required to verify from the time shown on the ticket that the age of the concrete is less than 45 minutes prior to authorizing placement.
- 3. PG&E Inspector Qualifications Provisions in the onsite quality assurance plan concerning qualification of inspectors require that:
- a. A record of the job experience and training of each inspector working at the construction site shall be filed with the quality assurance records,
- b. PG&E is to certify that the individuals are suitable for the assigned responsibilities.
- c. The following requirements are to be used in selecting inspectors.
(1) BS degree or equivalcat academic training in engineering or five years experience in construction prac t ic e.
(2) Thorough knowledge of applicable codes and specifications. l (3) Certificate from an organization which specializes in nondestructive testing training.
Mr. Chandler, Manager, Station Construction, stated that the inspectors will be drawn from organizations within the General Construction Department cf the Company. He did not expect i difficulty in filling the needed inspector positions from the j 4,700 employees in the Department. He added that if sufficient ,
qualified personnel were not available within the company, ~
l' qualified personnel would be hired from other labor sources.
C. Reinforcing Steel (Containment)
Quality control procedures relating to the manufacture and placement of reinforcing steel were reviewed, and discussions were held with Messrs. Lindblad, Carr, Harris and Bain. The following information and observations resulted.
The G. F. Atkinson Company (Atkinson) has contracted with the Pacific i States Steel Corporation (PSSC) of Union City, California, to supply and install reinforcing steel for the concrete structures of Diablo Canyon
9 (Unit 1) plant. The PSSC has retained the Pittsburgh Testing Laboratory (PTL) in Oakland, California , to provide quality assurance of both the manufacturing and fabrication (installation) activitics of PSSC. The Atkinson Quality Assurance Manual contained procedures relating to the following quality assurance activitics of the PTL.
- 1. Quality Control Organization The PTL quality assurance personnel will be under the supervision of the PTL District Of fice in Oakland. The District Yanager, Mr. R. F. Mikus, is to report to the Vice President, Mr. J. R.
Doubert, of PSSC in Union City. An organization chart in the QA Manual showed the assignment, under Mr. Mikus, of three PTL inspectors at the PSSC mill and four inspectors at the Diablo Canyon site. A footnote on the chart stated that '*Ihc number of inspectors will be governed by workload requirements".
Biographical data and the qualifications of each PTL inspector are to be provided to Atkinson, according to statements in the QA Manual.
- 2. Quality Control Procedures - Steel Manufacturing Written procedures described the dutics and responsibilities of FIL inspectors at the PSSC mill to include the following:
- a. Determine the sequence of sampling of the steci for ladle and check analyses.
- b. Observe laboratory procedures of steci analysis,
- c. Review all chemical analysis results. (A PTL inspector is to sign the chemical analysis reports prepared by PSSC.)
- d. Determine that proper identification and separation (by heat) is maintained of steel billets af ter stripping and
- e. Verify the proper marking and identification of finished l bars. (Each bar is to contain, in addition to that ;
marking required by ASTM A615-68, the number of the heat from which it was rolled.)
- f. Select bars and witness the cutting of samples from those for tensile and bend tests. (The PG&2 contract specifications require bend tests on No. 14 and 18 bar. Such a requirement is not contained in the applicabic ASTM specification, A615-68. )
l
- g. Witness tensile and bend costs on each heat and bar size.
(Sizes #3 through #11 are to be tested at the PSSC mill.
Sizes #14 and #18 are to be tested at the PC&E Diablo Canyon Laboratory.) A PTL inspector will sign all physical test reports.
- h. Verify that all testing results are in accordance with specifications prior to the shipment of any stoc1 to the s ite .
- 3. Quality control Procedures - Steel Fabrication and Installation at the Site The QA Manual contained procedurcs relating to the following duties and responsibilities of PTL inspector at the Diablo site:
- a. Check all steel shipments received at the site, and determine that they are properly identified and tagged.
(Shipments are to be checked against production and delivery order.) Each shipment is to be inspected for damage in t ra nsit .
- b. Check the placement of all steel, and verify (by hect number) the location of bars in accordance with detailing drawings.
- c. Inspect all welded and Cadweld splicer. (The location of each splice is to be recorded and compared to the detailing drawings . )
- d. Conduct random inspections of the quality of deformations,
- e. Verify proper spacing of reinforcing steel.
f.
For each Cadweld splice the PTL inspector is to verify and record: The splico number, loca tion (group, layer and run) , pre-hea t , setup for splice (alignment, centering and gap space), post-splice visual inspection, void area, ;
splicing crew identification, and whether the splice was <
selected for tensile testing. -
Cadweld splices are to be inspected in accordance with !
Erico Products, Inc. , procedure dated August 1969. This procedure contains void limits for filler metal at the ends of splice sleeves, e.g. , 2.64 square inches for No.18 bar (splice Cat. No. RBT-1876 H). In response to the
( (
i l
~
inspector's inquiry, Mr. Carr said that void areas would be determined by probing the splico ends with a small diameter wire.
D. Containment Building Steel Liner Fabrication and field crection of the containment building liner has been subcontracted by Atkinson to the Pittsburgh-Des Moines S cci Company (PDM).
The Atkinson QA Manual contained quality control procedures to be implemented by PDM. The procedures covered, in separate sections of the Manual, both shop fabrication and field fabrication and crection.
During the current inspection, principal attention was given to the field quality control procedures. The following information and observations resulted:
- 1. Quality Control Organization An organization chart in the QA FMnual showed a line of "authority and decision" extending, independent of production, from the PDM QA Chief at the site to tiac PDM corporate level management (Corporate Chief Engineer).
Ncndestructive testing (NDT) personnel qualifications are to be on file for those persons employed in that capacity at the site.
The QA Funual stated that the SNT icvol systea l / of qualification for NDT personnel would be followed for all parts which are to meet the requirements of ASFC,Section III, BLPV Code. The SNT level system is not, however, to be followed for the qualification
. of NDT personnel on other components. The qualifications of NDT personnel will be a subject of particular attention during subsequent CO on-site inspections.
- 2. Quality Control Procedures - Field Erection The Manual contained detailed procedures relating to NDT technic.ucs and the recording of test results. The NDT methods for which individual procedures were available included radiography, magnetic l particle, liquid penetrant and ultrasonic.
I 1/ Society for Nondestructive Testing, SNT-TC-1A, "Recommended Practico for Nondestructive Testing Personnel Qualification and Certification".
l l
I
^
Typical of the several procedures was that relating to radio-gra phy. This procedure, which was six pages in length, contained the requirements and/or provided guidance in the following areas,
- a. Equipment This section covered the use of X-ray machines and radio-active isotopes (cobalt and iridium). The applicabic thickness range and source intensity or voltage range was given for each type of equipment as well as the source to film distance,
- b. Materials The following film types were specified. Kodak AA or M, Dupont 506, or Ansco Superay A.
The use of lead intensifying screens and back scatter radiation control was specified.
- c. Penetrameters The type, location and identification of penocracators, and shims as required, was specified. It was stated that one penetrameter would be used for films ten inches or icss in length and two penotrameters for films over ten inches in length. An exception to the above is the case where a complete circumferential joint is radiographed in a singic exposure. In this case, four penetraceters, equally spaced, are to be used.
- d. Acceptance Standards The definitions of unacceptabic weld defects were observed to be consistent with those contained in ASME, Sections III and VIII, B and PV Code, ,
- e. Records and Reports Radiographic interpretations are to be recorded. The ?DM form (No. 17955) specified for this purpose provides for the entry of information relating to: type of equipment used, penetrameter and shims used, type of film, welding process, location and description (including sketch) of defects revealed, and disposition (reject, accept or repair).
The form also provides space for the signatures of the radiographer, QA supervisor, -code inspector (if applicable) and the customer 's representative.
- 3. Non-Conforming or Variance Control The Atkinson QA Manual contained a procedure relating to the control and disposition of non-conforming materials or workmanship. This procedure discussed in considerabic detail the documentation of such deficiencies. The procedure specified the use of a form entitled "Deficiency or Variation Report" (DVR). The DVR is to contain a description of the co=ponent or part, as well as a description of the deviation. For cach such deviation, provision is rode on the form for indicating (yes or no) its detrimental affect on: performance, life, safety, maintainability and/or reliability.
Final disposition approval for "use-as-is" deviations, according to the procedures, is to bc =ade by PGLE. This was a subject of particular discussion betwcon the inspector and Messrs. Bain, Lindblad and Carr. The discussion centored on the inspector's question 'Vith which individual or individuals within PG&E does such approval authority rest?" The discussion revealed that such authority is not currently well defined. Mr. Carr stated that a procedure or instruction is to be prepared for the purpose of clarifying this area of authority within the PG&E project organiza-tion.
- 4. Miscellaneous Procedures - Not Revicued in Dcoth The Atkinson QA >bnual was observed to contain procedures relating to the following subjects, which were not reviewed in depth at the time of the current inspection.
- a. Drawing Distribution and Control. .
- b. Construction Plans and Procedures.
- c. Material Identification and Storage,
- d. Erect, ion, Fitup and Welding Control
- e. Weld Electrode Control.
- f. Welding Procedure and Welder Qualification Records.
- .14 g . '- Calibration of Measurement and Testing Equipment.
- h. Acceptance and Performance Tests.
- i. As-built Records and Final Documentation.
These procedures will be reviewed in greater _ depth during future CO on-site inspections.