ML20154F024
| ML20154F024 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Diablo Canyon, 05000000 |
| Issue date: | 04/14/1969 |
| From: | Spencer G US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Andrea Johnson US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20154C370 | List:
|
| References | |
| FOIA-88-156 NUDOCS 8805230065 | |
| Download: ML20154F024 (1) | |
Text
_
\\
[
i.j
- . -g '+
UNITED STATES 7
1 1
ATOMIC ENERGY COMMISSION 3
g 7
olvisioN CF COMPLI ANCE g
mtotON V till SANCMoFT WAY BcmKELEY. C ALIFoRNI A 94704 tem, m. eta:
Est. 004 April 14, 1969 G. S. Spencer, Senior Reactor Inspector Region V, Division of Compliance PACIFIC GAS AND El.ECTRIC COMPANY (DIABLO CANYON UNIT NO. I)
VENDOR INSPECTION DOCKET NO. 50-275 Attached is my report of a vendor visit to Electric Steel Company (ESCO), Portland Oregon, on March 28, 1969. ESCO is manufacturing the fittings to be used in the piping of the primary coolant system of PG&E's Diablo Canyon nuclear plant No.1.
Based on the information obtained during the visit, it appears that the activities of PG6E, Westinghouse and ESCO are sufficient to provide reasonable assurance that the pipe fittings manufactured by ESCO will.be of a quality consistent with the requirements prescribed in the preliminary saic*v analysis report for the Diablo Canyon No. 1 nuclear power station.
You will note that ESCO retains the radiographs of the fittings.
' During the next visit to PG&E to review PG&E's quality assurance-a,I quality control program, I intend to determine the ultimate disposition of the film.
["d'.
/ d t..s'
A. D. Johnson Reactor' Inspector 1
l Ll 3 7 8805230065 000510 PDR FOIA i
i MCMILL ANBO-156 PDR y
!