MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000275/19850381985-12-0909 December 1985 Insp Repts 50-275/85-38 & 50-323/85-36 on 851118-22.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Findings,Transportation Activities,Solid Waste Mgt Program,Low Level Waste Mgt & Licensee Events IR 05000275/19850321985-10-0808 October 1985 Insp Repts 50-275/85-32 & 50-323/85-29 on 850818-0928. Violation Noted:Nrc Inspector,Not on Approved Access List, Entered Class 1 safety-related Matl Storage Area Unescorted IR 05000275/19850241985-08-14014 August 1985 Insp Rept 50-275/85-24 on 850603-07.No Violations or Deficiencies Noted.Major Areas Inspected:Emergency Response Facilities Compliance W/Suppl 1 to NUREG-0737,including Technical Support Ctr & Operational Support Ctr IR 05000275/19850231985-07-30030 July 1985 Insp Rept 50-275/85-23 on 850610-28.Violation Noted: Weaknesses in Implementation of Qa/Qc Program Re Control of Measuring & Test Equipment & Unqualified Individual Assigned as Technician IR 05000323/20050101985-06-12012 June 1985 Insp Rept 50-440/85-17 on 850323-0510.Noncompliance Noted: Failure to Provide Adequate Administrative Procedural Controls & Failure to Adequately Accomplish Release for Test pre-test Checklist Verification IR 05000323/20050061985-05-22022 May 1985 Insp Repts 50-424/85-13 & 50-425/85-13 on 850323-0506.No Violations or Deviations Noted.Major Areas Inspected:Qa,Fire Protection/Prevention,Containment Dome Reinforcing Steel & Tendon Sheathing & Cavity Liner Plate Welding IR 05000275/19850141985-04-0303 April 1985 Insp Repts 50-275/85-14 & 50-323/85-02 on 850304-08.No Noncompliance or Deviation Noted.Major Areas Inspected:Area Insp,Licensee Actions on Previously Identified Items,Ie bulletins,10CFR50.55(e) Items & TMI Task Action Items IR 05000275/19840051984-06-0606 June 1984 IE Insp Rept 50-275/84-05 on 840326-30.No Violations or Deviations Noted.Major Areas Inspected:New Chemistry & Radiation Protection Dept Organization,Radiation Protection Training,Followup on Noncompliance & IE Info Notices IR 05000275/19820241982-08-0202 August 1982 IE Insp Rept 50-275/82-24 on 820712-15.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Onsite Review Committee & Independent Insp IR 05000275/19820231982-07-30030 July 1982 IE Insp Repts 50-275/82-23 & 50-323/82-12 on 820721-23.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circulars,Info Notices & Bulletins,Preoperational Testing & Monitoring Calibr IR 05000275/19820121982-07-28028 July 1982 IE Insp Repts 50-275/82-12 & 50-323/82-07 Have Been Canceled IR 05000275/19820221982-07-26026 July 1982 IE Insp Repts 50-275/82-22 & 50-323/82-11 on 820526-28 & 0628-0702.No Noncompliance Noted.Major Areas Inspected: Action on Previous Items,Mods to Piping & Electrical Raceway Supports & Unit 2 Vessel IR 05000275/19820211982-07-19019 July 1982 IE Insp Rept 50-275/82-21 on 820606-0703.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & Licensee QA Program IR 05000275/19820201982-06-28028 June 1982 IE Insp Repts 50-275/82-20 & 50-323/82-10 on 820506-28.No Noncompliance Noted.Major Areas Inspected:Implementation of Independent Verification Program Including Independence & Qualification of Personnel & Exam of QA Programs IR 05000275/19820191982-06-18018 June 1982 IE Insp Rept 50-275/82-19 on 820502-0604.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & QA Program IR 05000275/19820181982-06-15015 June 1982 IE Insp Rept 50-275/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Plant Layout,General Employee Training,Chemistry & Radiation Protection Staff Training & NUREG-0737,Items II.B.3 & II.F.1 IR 05000275/19820161982-06-11011 June 1982 IE Insp Repts 50-275/82-16 & 50-323/82-09 on 820329-0402 & 0510-14.Noncompliance Noted:Class I Matl Released for Const Prior to Satisfying Established Matl Receiving,Handling & Processing QC Procedures IR 05000275/19820151982-06-11011 June 1982 IE Safeguards Insp Rept 50-275/82-15 on 820524-28.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization Mgt & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000275/19780071978-05-26026 May 1978 IE Insp Rept 50-275/78-07 on 780227-0303.No Deviations or Items of Noncompliance Noted.Major Areas Inspected:Emergency Planning.Related Encls Include Various Allegations,Qa Matl & I Yin Notes.Partially Withheld Interviews & Notes Also Encl ML20154D4521971-07-22022 July 1971 Insp Rept 50-275/71-02 on 710723-25 & 30.No Enforcement Action Noted.Major Areas Inspected:Unresolved Items, Unusual Occurrences,Design Changes,Status of Const, Procedures & Records & Review of QC Sys for Components ML20212N7781970-12-30030 December 1970 Div of Compliance Insp Rept 50-275/70-05 on 701201-03.Major Areas Inspected:Status of Previously Identified Items of Concern,Discrepancy Repts & QA Audit Activities ML20212N7771970-11-12012 November 1970 Div of Compliance Insp Rept 50-323/70-02 on 700930,1001 & 13.Major Areas Inspected:Design of Steam Generator Supports. QA Procedures Officially Approved & in Use by Design Groups ML20154D8461970-10-16016 October 1970 Insp Rept 50-275/70-04 on 700915-16.No Nonconformance Noted. Major Areas Inspected:Qa/Qc Review for Fabrication & Erection of Steam Generator Supports & Review Status of Previously Reported Deficiencies 1999-09-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870051987-01-28028 January 1987 Insp Repts 50-275/87-05 & 50-323/87-05 on 870112-16.No Noncompliance or Deviations Noted.Major Areas Inspected: Followup of NRC Technical Audit Branch Rept on Allegation Re Flat Spot on Reactor Coolant Piping in Unit 1 Containment IR 05000275/19860251986-09-17017 September 1986 Insp Rept 50-275/86-25 on 860825-29.No Violations Noted. Major Areas Inspected:Preparation for Refueling Activities IR 05000275/19860151986-06-0505 June 1986 Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance Testing of Auxiliary Feedwater Sys.Unresolved Item Re Automatic Feedwater Sys Operability During Pump Maint Identified IR 05000275/19860141986-05-0909 May 1986 Enforcement Conference Repts 50-275/86-14 & 50-323/86-15 on 860425.Major Area Discussed:Licensee Action Plan to Correct Problem of Missed Tech Spec Surveillances.Noncompliance Noted Re Followup of LERs IR 05000275/19850381985-12-0909 December 1985 Insp Repts 50-275/85-38 & 50-323/85-36 on 851118-22.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Findings,Transportation Activities,Solid Waste Mgt Program,Low Level Waste Mgt & Licensee Events IR 05000275/19850321985-10-0808 October 1985 Insp Repts 50-275/85-32 & 50-323/85-29 on 850818-0928. Violation Noted:Nrc Inspector,Not on Approved Access List, Entered Class 1 safety-related Matl Storage Area Unescorted IR 05000275/19850241985-08-14014 August 1985 Insp Rept 50-275/85-24 on 850603-07.No Violations or Deficiencies Noted.Major Areas Inspected:Emergency Response Facilities Compliance W/Suppl 1 to NUREG-0737,including Technical Support Ctr & Operational Support Ctr IR 05000275/19850231985-07-30030 July 1985 Insp Rept 50-275/85-23 on 850610-28.Violation Noted: Weaknesses in Implementation of Qa/Qc Program Re Control of Measuring & Test Equipment & Unqualified Individual Assigned as Technician IR 05000323/20050101985-06-12012 June 1985 Insp Rept 50-440/85-17 on 850323-0510.Noncompliance Noted: Failure to Provide Adequate Administrative Procedural Controls & Failure to Adequately Accomplish Release for Test pre-test Checklist Verification IR 05000323/20050061985-05-22022 May 1985 Insp Repts 50-424/85-13 & 50-425/85-13 on 850323-0506.No Violations or Deviations Noted.Major Areas Inspected:Qa,Fire Protection/Prevention,Containment Dome Reinforcing Steel & Tendon Sheathing & Cavity Liner Plate Welding IR 05000275/19850141985-04-0303 April 1985 Insp Repts 50-275/85-14 & 50-323/85-02 on 850304-08.No Noncompliance or Deviation Noted.Major Areas Inspected:Area Insp,Licensee Actions on Previously Identified Items,Ie bulletins,10CFR50.55(e) Items & TMI Task Action Items IR 05000275/19840051984-06-0606 June 1984 IE Insp Rept 50-275/84-05 on 840326-30.No Violations or Deviations Noted.Major Areas Inspected:New Chemistry & Radiation Protection Dept Organization,Radiation Protection Training,Followup on Noncompliance & IE Info Notices IR 05000275/19820241982-08-0202 August 1982 IE Insp Rept 50-275/82-24 on 820712-15.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Onsite Review Committee & Independent Insp IR 05000275/19820231982-07-30030 July 1982 IE Insp Repts 50-275/82-23 & 50-323/82-12 on 820721-23.No Noncompliance Noted.Major Areas Inspected:Followup on IE Circulars,Info Notices & Bulletins,Preoperational Testing & Monitoring Calibr IR 05000275/19820121982-07-28028 July 1982 IE Insp Repts 50-275/82-12 & 50-323/82-07 Have Been Canceled IR 05000275/19820221982-07-26026 July 1982 IE Insp Repts 50-275/82-22 & 50-323/82-11 on 820526-28 & 0628-0702.No Noncompliance Noted.Major Areas Inspected: Action on Previous Items,Mods to Piping & Electrical Raceway Supports & Unit 2 Vessel IR 05000275/19820211982-07-19019 July 1982 IE Insp Rept 50-275/82-21 on 820606-0703.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & Licensee QA Program IR 05000275/19820201982-06-28028 June 1982 IE Insp Repts 50-275/82-20 & 50-323/82-10 on 820506-28.No Noncompliance Noted.Major Areas Inspected:Implementation of Independent Verification Program Including Independence & Qualification of Personnel & Exam of QA Programs IR 05000275/19820191982-06-18018 June 1982 IE Insp Rept 50-275/82-19 on 820502-0604.No Noncompliance Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Physical Security,Maint,Ler Followup & QA Program IR 05000275/19820181982-06-15015 June 1982 IE Insp Rept 50-275/82-18 on 820426-30.No Noncompliance Noted.Major Areas Inspected:Plant Layout,General Employee Training,Chemistry & Radiation Protection Staff Training & NUREG-0737,Items II.B.3 & II.F.1 IR 05000275/19820161982-06-11011 June 1982 IE Insp Repts 50-275/82-16 & 50-323/82-09 on 820329-0402 & 0510-14.Noncompliance Noted:Class I Matl Released for Const Prior to Satisfying Established Matl Receiving,Handling & Processing QC Procedures IR 05000275/19820151982-06-11011 June 1982 IE Safeguards Insp Rept 50-275/82-15 on 820524-28.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization Mgt & Security Program Audit.Details Withheld (Ref 10CFR73.21) IR 05000275/19780071978-05-26026 May 1978 IE Insp Rept 50-275/78-07 on 780227-0303.No Deviations or Items of Noncompliance Noted.Major Areas Inspected:Emergency Planning.Related Encls Include Various Allegations,Qa Matl & I Yin Notes.Partially Withheld Interviews & Notes Also Encl ML20154D4521971-07-22022 July 1971 Insp Rept 50-275/71-02 on 710723-25 & 30.No Enforcement Action Noted.Major Areas Inspected:Unresolved Items, Unusual Occurrences,Design Changes,Status of Const, Procedures & Records & Review of QC Sys for Components ML20212N7781970-12-30030 December 1970 Div of Compliance Insp Rept 50-275/70-05 on 701201-03.Major Areas Inspected:Status of Previously Identified Items of Concern,Discrepancy Repts & QA Audit Activities ML20212N7771970-11-12012 November 1970 Div of Compliance Insp Rept 50-323/70-02 on 700930,1001 & 13.Major Areas Inspected:Design of Steam Generator Supports. QA Procedures Officially Approved & in Use by Design Groups ML20154D8461970-10-16016 October 1970 Insp Rept 50-275/70-04 on 700915-16.No Nonconformance Noted. Major Areas Inspected:Qa/Qc Review for Fabrication & Erection of Steam Generator Supports & Review Status of Previously Reported Deficiencies 1999-09-13
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000275/19990121999-09-13013 September 1999 Insp Repts 50-275/99-12 & 50-323/99-12 on 990711-0821. Noncited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000275/19990071999-07-27027 July 1999 Insp Repts 50-275/99-07 & 50-323/99-07 on 990503-0714. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations & Engineering IR 05000275/19980161998-11-16016 November 1998 Insp Repts 50-275/98-16 & 50-323/98-16 on 980913-1024.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000275/19980111998-07-22022 July 1998 Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.No Violations Noted.Major Areas Inspected:Circumstances, Potential Safety Consequences & Licensee Response & Actions Taken Re Authorization of Tagout W/O Written Procedure IR 05000275/19980081998-04-17017 April 1998 Insp Repts 50-275/98-08 & 50-323/98-05 on 980202-06,23-27 & 0302-18.No Violations Noted.Major Areas Inspected: Engineering IR 05000275/19980031998-01-23023 January 1998 Insp Repts 50-275/98-03 & 50-323/98-03 on 980105-09.No Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation IR 05000275/19940271994-12-21021 December 1994 Insp Repts 50-275/94-27 & 50-323/94-27 on 941016-1126. Violations Noted.Major Areas Inspected:Operational Safety Verification,Plant Maint,Surveillance Observation,Plant Support Activities & in-office Review of LERs PNO-V-93-013, on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant1993-08-0909 August 1993 PNO-V-93-013:on 930809,during pre-announced anti-nuclear demonstration,13 Protestors Illegally Entered Plant Access Gate & Immediately Taken Into Custody by Sheriff Deputies. Demonstration Related to CP Recapture Hearings for Plant PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield1992-10-20020 October 1992 PNO-V-92-033:on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core1991-03-0707 March 1991 PNO-V-91-003:on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core IR 05000275/19900171990-10-22022 October 1990 Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-1008.Noncited Violations Noted.Major Areas Inspected:Physical Security Program PNO-V-90-033, on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant1990-07-27027 July 1990 PNO-V-90-033:on 900726,observed Crack in Charging Pump Suction Header Piping Caused by Boric Acid Crystals on Elbow of Pump.Licensee Considers Piping Operable & to Be Repaired W/O Plant Shut Down.Inspector Monitoring Plant ML20055J2001990-07-13013 July 1990 Notice of Violation from Insp on 900422-0609.Violations Noted:Work Order Which Provided Instructions for Replacement of Plant Turbine Driven Auxiliary Feedwater Pump Speed Governor Not Appropriate to Circumstances ML20245E9661989-07-31031 July 1989 Partially Withheld Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-18 (Ref 10CFR2.790(d) & 73.21).No Violations Noted.Noncited Violation Noted Re Compensatory Measures. Major Areas Inspected:Physical Security Program IR 05000275/19890121989-04-18018 April 1989 Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted.Major Areas Inspected: Followup on Previous Insp Findings & Operational Status of Emergency Preparedness Program IR 05000275/19890031989-02-0808 February 1989 Insp Repts 50-275/89-03 & 50-323/89-03 on 890117-26.No Noncompliance Noted.Major Areas Inspected:Nonroutine Events, Followup of Open Items,Radwaste Sys & Radiological Environ Monitoring & Transportation Activities PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault1988-07-18018 July 1988 PNO-V-88-048:on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault ML20196D6151988-01-27027 January 1988 Exam Rept 50-275/OL-87-02 for Units 1 & 2 on 871208-17.Exam Results:Three Senior Reactor Candidates & Twelve Reactor Operator Candidates Passed Operating & Written Exams ML20234E8071987-12-21021 December 1987 Corrected Notice of Violation from Insp on 861215-19. Violation Noted:Qualification Documentation for Limitorque Motorized Valve Actuators Did Not Establish Similarity Between Installed Actuator & Actuator Tested PNO-V-87-083, on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart1987-12-14014 December 1987 PNO-V-87-083:on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart PNO-V-87-082, on 871210,fire Occurred in Temporary Tool Storage Trailer in Vicinity of Unit 2 Main Generator Transformers.Caused by 120 Volt Junction Box,Possibly Overloaded from Portable Space Heater.Fire Put Out1987-12-10010 December 1987 PNO-V-87-082:on 871210,fire Occurred in Temporary Tool Storage Trailer in Vicinity of Unit 2 Main Generator Transformers.Caused by 120 Volt Junction Box,Possibly Overloaded from Portable Space Heater.Fire Put Out IR 05000323/19870391987-11-17017 November 1987 Insp Rept 50-323/87-39 on 870805-1030.Violations Noted. Major Areas Inspected:Improperly Authorized Flame Heating of RHR Pipe on 870505 PNO-V-87-074, on 871110,county Inadvertently Actuated Emergency Notification Sys(Sirens).Caused by Wrong Sequence Being Entered Into Sys While Performing Weekly Silent Test. Corrective Action Under Investigation1987-11-10010 November 1987 PNO-V-87-074:on 871110,county Inadvertently Actuated Emergency Notification Sys(Sirens).Caused by Wrong Sequence Being Entered Into Sys While Performing Weekly Silent Test. Corrective Action Under Investigation PNO-V-87-073, on 871107,unit Trip Manually Initiated.Caused by Failure of motor-operated Disconnect in Main Generator 25 Kv Isophase Bus C.Repair & Unit Outage Will Take Between 2 Wks & 2 Months,Depending on Availability of Parts1987-11-0909 November 1987 PNO-V-87-073:on 871107,unit Trip Manually Initiated.Caused by Failure of motor-operated Disconnect in Main Generator 25 Kv Isophase Bus C.Repair & Unit Outage Will Take Between 2 Wks & 2 Months,Depending on Availability of Parts PNO-V-87-066, on 871006,while Performing Periodic Surveillance Testing of Control Rods at 100% Power,Rod Control Urgent Failure Alarm Received on Shutdown Bank A. Caused by Blown Fuses.Fuses Replaced & Alarm Cleared1987-10-0606 October 1987 PNO-V-87-066:on 871006,while Performing Periodic Surveillance Testing of Control Rods at 100% Power,Rod Control Urgent Failure Alarm Received on Shutdown Bank A. Caused by Blown Fuses.Fuses Replaced & Alarm Cleared IR 05000275/19870321987-09-0101 September 1987 Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817. Major Areas Discussed:Recent Plant Events & Apparent Problem Areas That Have Developed Since Last Mgt Meeting on 870306 PNO-V-87-053, on 870723,high Radiation Alarm Automatically Diverted Liquid Radwaste Flow to Storage Tank.Licensee Determining Root Cause.Chemical Drain Tank Properly Recirculated & Sampled Prior to Discharge Per Procedure1987-07-24024 July 1987 PNO-V-87-053:on 870723,high Radiation Alarm Automatically Diverted Liquid Radwaste Flow to Storage Tank.Licensee Determining Root Cause.Chemical Drain Tank Properly Recirculated & Sampled Prior to Discharge Per Procedure PNO-V-87-051, on 870714,reactor Trip & Safety Injection from 12% Power Occurred.Caused by turbine-generator Trip Due to High Steam Generator Water Level & Flickering High Steam Flow Bistables,Respectively.Root Causes Under Investigation1987-07-14014 July 1987 PNO-V-87-051:on 870714,reactor Trip & Safety Injection from 12% Power Occurred.Caused by turbine-generator Trip Due to High Steam Generator Water Level & Flickering High Steam Flow Bistables,Respectively.Root Causes Under Investigation IR 05000275/19870221987-06-23023 June 1987 Insp Rept 50-275/87-22 on 870520-22.Major Areas Inspected: Followup on Allegation File Number RV-87-A-0094 & Followup on Regional Open Items List ML20215F9001987-06-17017 June 1987 PNS-V-87-005:on 870617,American Protective Svc Notified Util That Security Personnel on Strike Over Monetary Benefits. Licensee Capable to Meet Security Staffing Requirements Through Use of Proprietary Security Personnel PNO-V-87-041, on 870602,engineer in Containment Noted Weepage from RHR Sys Line While RHR in Svc.Cause of Effect Undetermined.Licensee Preparing Work Orders to Isolate, Examine & Repair Weld1987-06-0303 June 1987 PNO-V-87-041:on 870602,engineer in Containment Noted Weepage from RHR Sys Line While RHR in Svc.Cause of Effect Undetermined.Licensee Preparing Work Orders to Isolate, Examine & Repair Weld IR 05000275/19870181987-05-0808 May 1987 Insp Repts 50-275/87-18 & 50-323/87-17 on 870420-24.No Noncompliance or Deviations Noted.Major Areas Inspected: Nonlicensed Staff Training,Followup of Part 21 Repts,Various Vital Areas & Equipment ML20209D5131987-04-23023 April 1987 Updated PNO-V-87-030B:on 870421,onsite Phase of AIT Team Special Insp Into 870410 Loss of Suction to RHR Sys While in half-loop Concluded W/Meeting at Site PNO-V-87-030A, on 870415,Region V Augmented Insp Team Commenced Insp Activities Re 870410 Loss of Suction to RHR While at Half Loop.Team Expects to Stay Onsite Through 870421.Summary of Sequence of Event Encl1987-04-20020 April 1987 PNO-V-87-030A:on 870415,Region V Augmented Insp Team Commenced Insp Activities Re 870410 Loss of Suction to RHR While at Half Loop.Team Expects to Stay Onsite Through 870421.Summary of Sequence of Event Encl PNO-V-87-030, on 870410,RHR Sys Capability Lost for Approx 90 Minutes.Caused by Entrainment of Air within RHR Pumps When RCS Water Level Dropped Due to Water Leakage Through Two Valves.Augmented Insp Team Dispatched1987-04-13013 April 1987 PNO-V-87-030:on 870410,RHR Sys Capability Lost for Approx 90 Minutes.Caused by Entrainment of Air within RHR Pumps When RCS Water Level Dropped Due to Water Leakage Through Two Valves.Augmented Insp Team Dispatched PNO-V-87-028, on 870403,reactor Tripped from 12% Power During Shut Down for First Refueling Outage.Caused by Flicker of High Steam Flow Bistables Coincident w/lo-lo T Average.Investigation Continuing1987-04-0606 April 1987 PNO-V-87-028:on 870403,reactor Tripped from 12% Power During Shut Down for First Refueling Outage.Caused by Flicker of High Steam Flow Bistables Coincident w/lo-lo T Average.Investigation Continuing ML20215G3021987-03-26026 March 1987 Notice of Violation from Insp on 870202-13.App B Re Areas Inspected & Results Encl IR 05000275/19870011987-03-25025 March 1987 Insp Repts 50-275/87-01 & 50-323/87-01 on 870202-13. Violation Noted:Failure to Maintain Control Over Lubricants PNO-V-87-025, on 870321,facility Experienced Safety Injection,Reactor Trip & Unit Trip.Caused by Coincidence of High Steam Flow & Low Steam Generator Pressure Signals Due to Closure of MSIV FCV 41.Piping & Valve Switches Inspected1987-03-23023 March 1987 PNO-V-87-025:on 870321,facility Experienced Safety Injection,Reactor Trip & Unit Trip.Caused by Coincidence of High Steam Flow & Low Steam Generator Pressure Signals Due to Closure of MSIV FCV 41.Piping & Valve Switches Inspected IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety IR 05000275/19870091987-03-11011 March 1987 Insp Repts 50-275/87-09 & 50-323/87-08 on 870223-27.No Noncompliance Noted.Major Areas Inspected:Followup of IE Bulletins,Vital Areas & Equipment PNO-V-87-018, on 870301,1-2 Mw/Min Shutdown Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak. Vibration,Induced by Main Generator,Caused Cracking in Welds of Stator Cooling Water Sys Which Occurred on 8702171987-03-0202 March 1987 PNO-V-87-018:on 870301,1-2 Mw/Min Shutdown Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak. Vibration,Induced by Main Generator,Caused Cracking in Welds of Stator Cooling Water Sys Which Occurred on 870217 PNO-V-87-016, on 870221,shutdown Commenced Due to Train B of Solid State Protection Sys Not Returning to Svc within 2 H. Caused by High Steam Generator Level on Generator 1-4 & Feedwater Flow Instabilities & Valve Position Problem1987-02-23023 February 1987 PNO-V-87-016:on 870221,shutdown Commenced Due to Train B of Solid State Protection Sys Not Returning to Svc within 2 H. Caused by High Steam Generator Level on Generator 1-4 & Feedwater Flow Instabilities & Valve Position Problem IR 05000275/19870041987-02-20020 February 1987 Insp Repts 50-275/87-04 & 50-323/87-04 on 861228-870207.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities & Followup of Onsite Events,Open Items & LERs PNO-V-87-014, on 870217,slow Shutdown from 100% Power Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak.Caused by Cracking in Stator Water Cooling Vent Line Due to Vibration.Outage Expected to Last Approx 1 Wk1987-02-18018 February 1987 PNO-V-87-014:on 870217,slow Shutdown from 100% Power Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak.Caused by Cracking in Stator Water Cooling Vent Line Due to Vibration.Outage Expected to Last Approx 1 Wk IR 05000275/19870071987-02-12012 February 1987 Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06. No Items of Noncompliance or Deviations Identified.Major Areas Inspected:Design,Design Changes & Mods & Followup on IE Notices & Nonconformance Repts ML20211M1701987-02-10010 February 1987 Notice of Violation from Insp on 870112-13 IR 05000275/19870061987-02-0606 February 1987 Insp Rept 50-275/87-06 on 870112-13.Violation Noted: Notification of 870102 Emergency Plan Unusual Event Did Not Occur Until 95 Minutes After Declaration IR 05000275/19860321987-01-30030 January 1987 Insp Repts 50-275/86-32 & 50-323/86-30 on 861109-1227 & 870116.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance Activities, Followup of Onsite Events & Allegations IR 05000275/19870031987-01-30030 January 1987 Insp Repts 50-275/87-03 & 50-323/87-03 on 870112-16.No Violations or Deviations Noted.Major Areas Inspected: Previous Insp Items,Transportation,Solid Waste,Licensee Identified Violation & Facility Tours 1999-09-13
[Table view] |
Text
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ -
l -.
.
ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION REG 50N IV -
Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Report No.: 50-275/98-03;50-323/98-03- ,
'
Licensee: Pacific Gas and Electric Company
'
Facility: Diablo Canyon Nuclear Power Plant Units 1 and 2 Location: 71/2 miles NW of Avila Beach Avila Beach, California Dates: January 5-9,1998 Inspector: Gilbert L. Guerra, Jr., Radiation Specialist Plant Support Branch Approved By: Blaine Murray, Chief, Plant Support Branch Divis'on of Reactor Safety Attachment: Supplemental Information
,
9901270225 990123 PDR .ADOCK 05000275 G PDR ,,
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
__ .-- _____ _ _ _
1
. EXECUTIVE SUMMARY Diablo Canyon Nuclear Power Plant, Units 1 and 2 NRC Inspection Report 50-275/98-03; 50-323/98-03
,
- This announced, routine inspection reviewed the implementation of the solid radioactive waste management and radioactive materials transportation programs. Training, quakty assurance oversight, and procedural guioance were also reviewe Plant Sunoort
- A very good solid radioactive waste management program was implemented. The generation of dry active wastes had been reduced (Section R1.1).
- A very good transportation program for radioactive materials and radioactive waste was maintained (Section R1.2).
- Good facilities were maintained for the storage and management of solid radioactive wastes and transportation activities. Housekeeping in the radioactive waste storage areas was good (Section R2).
- Procedures established to implement the solid radioactive waste and transportation programs provided good guidance (Section R3.1).
- The radiation protection department was adequately staffed with knowledgeable and experienced personnel (Section R4).
- Personnel involved in the transfer, packaging, and transport of radioactive materials and wastes were properly trained and qualified (Section RS.1).
- A proper organization and staff were maintained which effectively implemented the radioactive waste management and transportation programs (Section R6).
- The licensee implemented a strong management oversight program for the solid radiosctive waste management and transportation programs (Section R7.1).
,
.
.
'
_ ~ . - - - - - _ - . - _ _ _ . - - . - - . . . _ - . _ _
_ _ _ _ _ _ _ _ .__
__
.
3-Report Details Summary of Plant Status Diablo Canyon Units 1 and 2 were at power operations during this inspection. No events occurred during this inspection that adversely affected the inspection result IV. Plant Suonort R1 Radiological Protection and Chemistry (RP&C) Controls R1.1 Mi_d Radioactive Waste.Manaaement Insoection Scoce (86750)
The inspector interviewed cognizent members of the radiation protection department and observed or reviewed the following solid radioactive waste management program activities:
- Waste stream sampling results and waste characterization documentation
= Scaling factors for required isotopes not measured directly
Solid radioactive waste classification
. Quantities of radioactive waste shipped for dispot.al
. Waste minimization program
= Annual radinactive effluent and so;id radioactive waste repons Observations andf1Dd1023 The inspeJtor verified that waste stream samples were taken as required and analyzed to meet 10 CFR Part 61 requirements for waste classification and characterization. Six waste streams wNe identified that consisted of dry active waste, resin, and filters. Each of the different waste media was divided into two waste streams. Waste stream samples were analyzed by a contractor laborator Classification of waste was performed with a computer code used in the nuclear industr Scaling factors for difficult to measure nuclides in the waste streams were determined and updated as needed in the radwaste computer code data base. Selected exampies of radioactive waste packaged for burial determined that the waste was properly classified and characterize The radwaste computer code used by the licensee was obsolete and no longer supported with current updates by the vendor. However, the radiation protection staff, through the use of several program applications maintained the ability to perform proper data analyses and process the required waste classification and transportation documentation. The licensee stated that arrangements to purchase a current computer code were being develope .. . .
- _ - _ - _ _ - _ _
- - - . . ~ - - . . - -- .- . . - - - . - ~ . . . .. ,
.
. 4 The inspector observed a transfer of spent fuel pool demineralizer resin to spent resin storage tank No.1, including the sampling of the resin for radionuclide analysis. The transfer of the resin went well and no problems were identifie Discussions on radwaste minimization efforts were held. The licensee showed good l performance in its efforts to reduce the amount of dry active wastes generated. Worker !
awareness was enhanced to minimize radioactive waste and maintain contaminated areas to a minimum. Licensee data trends showed that these efforts were effective.
'
However, the licensee have reached a plateau in reducing radwaste generatio '
The volume of radwaste generation was tracked by the licensee with no segregation, processing, or volume reduction. Recently, the licensee began tracking the weight of wastes generated. The following table of licensee outage data shows the dry active waste generated per outage.
,
Solid Waste Reduction Results _
Outage Volume 1R5 4379.0 ft'
2RS 3072.0 ft 2
'
1R6 2475.0 ft 2 2R6 1450.0 ft 1R7 1032.0 ft
_
2R7 892.5 ft (36000 lbs)
1R8 1057.5 ft (41099 lbs)
Annual radioactive effluent release reports contained the required solid radioactive waste data. Dry active waste was shipped to an off-site vendor for volume reduction and subsequent burial. A summary of the volume and activity of solid radioactive waste including resins, irradiated components, and dry active waste shipped for disposal during the last 3 years is tabulated in the next table.
.
t A
' , -
- , ~ , . __ _- _ __ _ _ _ _ - _ . - - -
, .
l
-5-Total
'
Number Volume Activity
Year Of Shipments (m ) (Ci)
1995 17 17.92 394.70 1996 46 41.00 910.34 1997 Not Available l 25.70 (estimt te) Not Available Conclusions A very good solid radioactive waste management program was implemented. Waste stream sampling and analyses met regulatory requirements. Solid radioactive waste was properly classified and characterized for shipment and disposal. The generation of dry active wastes had been reduce R1.2 Transoortation of Radioactive Materialtand Radioactive Waste Insoection Scoce (86750)
The inspector interviewed radiation protection personnel and reviewed the following:
. -
Shipping documentation from selected shipments
- Certificates of compliance for NRC-certified shipping casks
- Copies of current Department of Transportation and NRC regulations
- Copies of current licenses for recipients of radioactive wastes / materials
- Use of a vendor supplied computer program to generate shipping papers
- Packaging and shipping papers
- Marking and labeling of packages for shipment
- Vehicle placarding and driver instructions
- Emergency response information
- Radiation surveys of packages and vehicles Observations and Findings i
Selected shipping records for shipmer,.s between Ja, uary 1996 and December 1997 showed that the licensee had made shipments of both radioactive materials and radioactive waste. Shipments requiring Typo B packaging were properly made, and the-licensee was a registered usec. No shipments were made during the week of inspection; therefore, no observations of actual shipment preparation were possibl An effective file systen, was maintained. The inspector verified the licensee maintained
- current copies of the consignees' radioactive materiallicenses on file. Current copies of regulations and state licenses were maintained. Certificates of Compliance for routinely
-.. . . . . . -_ _ _ _ _ - _ _ _ _ _ _
_ _ _ _ _ - _ _ -____ __
__
'
l l -
t-6-used shipping casks were verified. State shipping permits were reviewed. The inspector noted no problems in the records reviewe A vendor supplied computer code was used to determine proper radioactive material transportation categories, shipping packages, labeling, and shipping paper informatio Shipping papers for radioactive materials shipments contained the information required by 49 CFR 172, Subpart C. In addition to this information, radioactive waste shipment documentation included manifests that conformed to the requirements of 10 CFR Nrt 20, Appendix F, and 49 CFR 173.433. Shipping documents included radioactive activity measurements recorded in international system units as well as customary unit The inspector verified that proper emergency telephone numbers were included with the shipping papers. The licensee utilized an off site facility to provide emergency response Infonnatio The licensee maintained photographs of radioactive waste shipments to confirm that shipments were property labeled, marked, and placarded. Radiation survey records indicated that radiation and contamination levels of shipments were within regulatory limit Conclusions A very good transportation program for radioactive materials and radioactive waste was maintained. Documentation and packages were properly prepared for shipmen R2 Status of Facilities and Equipment
' Insoection Scooe The inspector toured the radioactive waste storage buildings and observed the following solid radioactive waste management program activities:
a Container storage and labeling
- Container accountability Findinas and Observations Tours of the radioactive waste processing and storage areas revealed that good storage facilities were maintained. Storage areas were properly posted and controlle Containers were properly labeled and marked. Overall, housekeeping in the radioactive waste storagt areas was good; however, some storage areas were cluttere The licenset kept the radioactive waste inventory to a minimum. Shipments of wastes were made in a timely manner An inventory of radioactive vcastes was conducted every 6 months. Currently, only two drums of solidified wastes and a few containers of accumulated wastes were in storage. The inspector concluded that the licensee could
.
.. .. - _ _ _ - - _ _ _ _ _ _ - _ _
_________ - __ .
. _
.
! .
account for all of the radioactive waste inventory. The radioactive waste inventory and container accountability system was effective and well maintained.- Conclusions Good facilities were maintained for the storage and management of solid radioactive wastes and transportation activities. An effective inventory system was utilize Housekeeping in the radioactive waste storage areas was goo R3 Radiological Protecnon and Chemistry Procedures and Documentation ~
R Transportation Procedures Inspechon Scope (86750)
The inspector reviewed selected procedures used to implement the waste stream sampling and analyses, transportation, and release program Observations and Findings Specifically, Procedure RCP D-631," Radioactive Materials Shipments," Revision 3, and
' Procedure RCP RW-4, " Solid Radioactive Waste Shipment," Revision 138, were reviewed Other procedures reviewed are listed on the attachment to this report. The procedures provided good detail and reference information.- The inspector noted that Procedure RCP D-631 contained errors in the low specific activity definition Documentation reviewed did not indicate any errors in radioactive waste classification due to these procedure errors. Steps to correct these errors were taken during the inspectio . Pncedures were detailed and provided good guidance for radioactive waste stream sampling, vendor laboratory analysis, updating the computer code data base with new waste stream sample analysis results, and scaling factor Conclusions Procedures established to implement the solid radioactive waste and transportation .
programs provided good guidanc R4 Staff Knowledge and Performance The inspector interviewed members of the radiation protection department involved in
' radioactive waste processing and transportation activities. Personnel responsible for conducting the transportation program for radioactive waste and radioactive matecials
. were knowledgeable of the transportation regulations. Technical specialists were also knowledgeable of the transportation software utilization constraint .4
- _ _ _ _ _ _ _ _ - _ _ _ - _ _ - _ - - _ _ _ - _ - . . _ - _
. _ ~ . _ _ _ . . _ _ . _ . _ _ . _ _ . ._ _ _ ._._ . ._. __ . . _ _ _ . _ . .
-
,- .
!
.;
-
..
~
'- 8; -
[
, The inspector' determined that the radiation protection department was adequately _' i
,
staffed with knowledgeable and experienced personnel.-- j
!
.
i R5 : Staff Training and Qualification in Radiological Protection and Chemistry
!
R5,1 Trainina and 0"=*=*ian of RMi=tian PM+2n Radwasta Personnel-
-
p -i
- Inspection Scope (86750) j The inspector reviewed the training of personnel who were responsible for the - _ _ _
e preparation and packaging of radioactive waste and radioactive materials for shipment.
The inspector reviewed the following: ,
' - Training materials islated to 49 CFR Parts 171-179 and 10 CFR Part 7.1
- * Training and qualification records
* Retraining requirements v . Observations and Findings L
g Training records and qualification cards revealed that all radiation protection personnel
- involved in radweste processing and transportation activities were properly trained and
.
_
.
'
- qualifie A periodic retraining program was conducted in accordance with commitments made in
,
-
response to NRC Bulletin 79-19 " Packaging of Low-Level Radioactive Waste for j . Trs,1 sport and Burial," No changes were made to this commitment.
l The in-house training on packaging, transferring, and transporting of radioactive
.
-
_ materials was typically provided to individuals involved in transportation activities at
[ 2-year Intervals. The inspector noted that the training material was comprehensive
- regarding regulatory requirements, p
' Conclusions
- '
- Personnel involved in the transfer, packaging, and transport of radioactive materials and wastes were properly tra'ned and qualified, i
h R6J . Radiological Protection and Chemistry Organization and Administration The organization and staffing '): uc implementation of the solid radioactive waste 1 management and transportatLa programs were reviewed. A proper organization and staff were maintained which effectively implemented the radioactive waste management -
and_ transportation programs. The technical staff experienced little change and no -
, reductio u
,
F "
_ -
- 5 .,_., . .-..c . . - . . - . -_.,,u...., , J.u- . . . , . ~ .-...m ,.- i.,,. ,, ., _ _~.w., ., -, _
. .- .-
t
.
. R7 Quality Assurance in Radiological Protection and Chemistry Activities R7.1 Solid Radwaste and Transoortation Proaram Assessments Insoection Scope (86750)
Audits and assessments of the solid radioactive waste management and transportation -
programs were reviewed. The review also included the following:
a interviews of quality assurance personnel
= Qualifications and resumes of auditors and technical specialists a Quality controlinspections
- Action requests Observations and Findinas Nuclear Quality Services Audit 95031 of radwaste activities was conducted September 19,1995, through July 25,1996. An audit of this area is conducted every 24 months in accordance with Technical Specification requirements.' The audit team included off site technical specialists knowledgeable in radioactive waste management and transportation activities. The inspector determined that the audit was comprehensive in its review of solid radioactive waste management and transportation activitie During the last NRC inspection, a concem was identified regarding the lack of a quality assurance, programmatic review of transportation activities. The licensee committed to a programmatic review of transportation activities to be included in the 1996 auality assurance audit of the solid radioactive waste ma..agement activitie The inspector verified that the commitment to enhance quality assurance oversight of transportation programs was implemented during the 1996 audit. The licensee also implemented quarterly assessments for a 2-year period. The quarterly assessments were an enhancement to program oversight since the last NRC inspection. Six assessment reports pertaining to solid radioactive waste and transportation activities were conducted in 1997. The assessments were effective in providing feedback to management on program effectivenes Auditi .r qualifications were reviewed, including resumes of technical specialists. The qualifications and experience of auditors was very good. Another concem raised during the last NRC inspection was that the individual responsible for conducting the majority of
,
the audit activities in radioactive waste management and transportation had little radiation protection experience. The inspector noted that the current quality assurance
. staff received training in radioactive waste transpodation and that the organization had acquired an individual who had extensive experience with the transportation of radioactive materials and radioactive waste processin . __ ._ - . _ . _ - - -
.
.
-10-Also, quality controlinspections of transportation activities were conducted. Quality control personnel frequently reviewed transportation documentation and package preparation to ensure compliance with regulatory requirement The effort expended on quality assurance by the licensee was considered a program strengt Off site vendors were not formally evaluated by the licensee; however, the radiation protection engineer had reviewed vendor procedures and audits by industry peer group Audit findings were tracked by the licensees condition reporting system. The inspector noted that the radiation protection organization responded properly to the finding Other, selected condition reports involving radioactive waste activities were reviewe No adverse trends were note c. Conclusions The licensee implemented a strong management oversight program for the solid radioactive waste management and transportation programs. Comprehensive biennial audits and quarterly assessments of the radioactive waste management and transportation programs were performe V. Mananoment Meetinas X1 Exit Meeting Summary The inspector presented the inspection results to members of licensee's management at
,
an exit meeting on January 9,1998. The licensee acknowledged the findings presente No proprietary information was identified.
.
_ _ _ . _ _ - _ _ _
- .
L ATTACHMENT SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licaones V. Backman, Supervisor, Regulatory Services T. Bast, ALARA and Planning, Radiation Protection C. B. Imont, Director, Nuclear Quality Services B. Crockett, Manager, Nuclear Quality Services R. Gagne, Radweste Foreman, Radiation Protection J. Gardner, Senior Engineer, Chemistry and Environmental Operations R. Gray, Director, Radiation Protection C. Har.sen, Auditor, Nuclear Quality Services T. Irving, General Foreman, Radiation Protection
,S. Ketelsen, Supervisor, Reoulatory Services J. Knight, Foreman, Radia, an Protection G. Lautt, Engineer, Radiation Protection
. D. Malone, Engineer, Regulatory Services C. Miller, Engineer,- Radiation Protection J. Molden, Manager, Operations Services M. Mosher, Supervisor, Nuclear Quality Services R. Powers, Vice President R. Rogers, Foreman, Radiation Protection 4 B. Snyder, Training Leader, Learning Services M. Somerville, Senior Engineer, Radiation Protection D. Taggart, Director-Nuclear Safety Engineering, Nuclear Quality Services MilQ L Ricketson, Senior Radiation Specialist D. Proulx, Senior Resident inspector D. Allen, Resident inspector
' IM.S.P_ECIlON_P_RQGEDURES_M.EED
IP 86750 ' Solid Radioactive Waste Management and Transportation of Radioactive Materials ITEMS OPENED. CLOSED. AND DISCUSSED-None- ___-_-___-___________=_-__--____-___________________________-____-_________________
- _ - _ _ _ _ _ _ _ _ _ _ _ - _
< .
.
.
~ LIST OF DOCUMENTS REVIEWED Procedures RCP D-631 Radioactive Material Shipments, Rev. 3 RCP RW-3 Radioactive Waste Nuclide Fractions and Correlation Factor Determination, Rev.11 RCP RW-4 Solif Radioactive Waste Shipment, Rev.13B -
RP2.DC1 Radioactive Waste Classification Program, Rev. 2
. Audits and Assessments Audit 950301 Solid Radioactive Waste Management and Transportation Programs 962900004 Radioactive Waste Management 970210313 Disassembly & Reassembly of CNSI Cask for Radioactive Waste Shipment 970570025 Solid Radioactive Waste Management and Transportation Program 971220201 Solid Radioactive Waste Management 973220017 Solid Radioactive Waste Management and Transportation Program 973370025 Solid Radioactive Waste Assessment Report 3rd Quarter 1997 973460007 Solid Radioactive Waste Assessment Report 4th Quarter 1997 Q1btl Organization Charts Response to NRC IE Bulletin 79-19 Training Records and Qualification Matrix Action Request Listings Auditor Qualifications Outage Reports Radwaste Summary Report 1996
-