ML20154F104

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-275/69-02 on 690311.No Noncompliance Noted.Schedule for Start of Const of Containment Bldg Reasonable.Util to Stress QA-QC Programs
ML20154F104
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 03/21/1969
From: Spencer G
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20154C370 List:
References
FOIA-88-156 NUDOCS 8805230094
Download: ML20154F104 (2)


Text

J

.... A

(

k.

March 21, 1969 1

J. P. O'Reilly, Chief Reactor Inspection and Enforcement Branch Division of Cotap11ance. Headquarters

{

PACIFIC CAS AND ELECTRIC COMPANY (DIABID CANYON UNIT NO. I) i DOCKET No. 50-275 The attached report by our field inspector of a visit to the subject facility on March 11, 1969 is forwarded for information. No items of noncoop11ance or of safety significance were noted during the l

visit.

Based on our observations and information obtained from the applicant personnel, the tentative schedule for the start of construction of the containment building appears to be a reasonable forecast.

Also, of interest, was an obvious awareness on the part of the applicant personnel of the stress expected to be placed on quality assurance and quality control programs.

You will note that PG&E's specifications for the tensile testing of Cadweld splices in the concrete reinforcing steel calls for a lesser number of splices to be tested than are suggested in the RTM which covers this subject. However, in view of the (intetual) classification of RTMs, the discrepancy was not discussed with the PG&E representa-tives.

CM8LutL m;.D ;

C.S. Citr a G. S. Spencer Senior Reactor Inspector

Attachment:

CO Rpt. No. 50-275/69-2 by A. D. Johnson dtd 3/21/69 AU g

8805230094 000510 l

PDR FOIA MCMILL ANGO-156 PDR cmcr>

....CO.; V..

  1. 4 summe,

. Sp'ence r : pmr..

u [. 4r.3 erst >

)l.21.l.b.9.. - --

rorm.u:c.m a n.. nu

\\

.s.n... sw e a

.-o m u

~ -, -. - - - -,, - - - -

i i

(

k J. P. O'Reilly March 21, 1969 i

i 4

i i

DISTRIBUTION:

i J. P. O'Reilly, CO:HQ (Orig. and one copy)

E. G. Case, DRS R. S. Boyd, DRL (2)

S. Levine, DRL (6)

D. J. Skovbolt DRL (3)

L. Kornblith, Jr., CO HQ i

Regional Directors s

REG File 1

]

I t

t

_.