MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19982001998-04-0707 April 1998 Insp Rept 50-223/98-200 on 980317-20.No Violations Noted. Major Areas Inspected:License Programs Were Directed Toward Protection of Public Health & Safety.Mgt Attention Should Be Directed to Issues Raised by Firefighters During Tours IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19972011997-06-26026 June 1997 Insp Rept 50-223/97-201 on 970513-16.No Violations Noted. Major Areas Inspected:Licensee Organization,Operations & Maint Activities ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19960021996-10-10010 October 1996 Insp Rept 50-223/96-02 on 961007-10.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19982001998-04-0707 April 1998 Insp Rept 50-223/98-200 on 980317-20.No Violations Noted. Major Areas Inspected:License Programs Were Directed Toward Protection of Public Health & Safety.Mgt Attention Should Be Directed to Issues Raised by Firefighters During Tours IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19972011997-06-26026 June 1997 Insp Rept 50-223/97-201 on 970513-16.No Violations Noted. Major Areas Inspected:Licensee Organization,Operations & Maint Activities ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19960021996-10-10010 October 1996 Insp Rept 50-223/96-02 on 961007-10.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19982001998-04-0707 April 1998 Insp Rept 50-223/98-200 on 980317-20.No Violations Noted. Major Areas Inspected:License Programs Were Directed Toward Protection of Public Health & Safety.Mgt Attention Should Be Directed to Issues Raised by Firefighters During Tours IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19972011997-06-26026 June 1997 Insp Rept 50-223/97-201 on 970513-16.No Violations Noted. Major Areas Inspected:Licensee Organization,Operations & Maint Activities ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000223/19960021996-10-10010 October 1996 Insp Rept 50-223/96-02 on 961007-10.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000223/19900031990-09-19019 September 1990 Insp Rept 50-223/90-03 on 900827-28.No Violations Noted. Major Areas Inspected:Radiation Protection Program,Including Status of Previously Identified Items,Staffing,External Exposure Controls & Contamination Controls IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures 1990-09-19
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20198P2921998-11-27027 November 1998 NRC Operator Licensing Exam Rept 50-223/OL-98-03 (Including Completed & Graded Tests) for Tests Administered on 981116- 19.Exams Administered to Six License Candidates IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition ML20237F1111998-08-11011 August 1998 NRC Operator Licensing Initial Exam Rept 50-223/OL-98-01 of Exam Administered During Wk of 980803-06.Exam Results:One RO Candidate Failed Two Sections of Written Exam & All Other Candidates Passed All Portions of Respective Exams IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO IR 05000223/19982001998-04-0707 April 1998 Insp Rept 50-223/98-200 on 980317-20.No Violations Noted. Major Areas Inspected:License Programs Were Directed Toward Protection of Public Health & Safety.Mgt Attention Should Be Directed to Issues Raised by Firefighters During Tours IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20203H2641998-02-11011 February 1998 NRC Operator Licensing Exam Rept 50-223/OL-98-01 Administered on 980130.Exam Results: During Wk of 980126, Retake of Section B of Written Exam Was Administered to Ro. Candidate Passed Exam ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20202J2981997-10-16016 October 1997 NRC Operator Licensing Exam Rept 50-223/OL-97-01 (Including Completed & Graded Tests) for Tests Administered on 970929- 1001 ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill IR 05000223/19972011997-06-26026 June 1997 Insp Rept 50-223/97-201 on 970513-16.No Violations Noted. Major Areas Inspected:Licensee Organization,Operations & Maint Activities ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days 1999-08-16
[Table view] |
Text
_ _ _ . _
R8oo UNITEC STATES
- o, NUCLEAR REGULATORY COMMISSION
. o REGION il-5* $ .101 M ARIETTA STR E ET, o * ATLANTA, GEORGIA 30303
%*****/ APR 181985 Report Nos.: 50-424/85-09 and 50-425/85-09-Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket Nos.: 50-424 and 50-425 License Nos.: CPPR-108 and CPPR-109 Facility Name: Vogtle 1 and 2
>
Inspection Conducted: February 23, 1985 - March 22, 1985 Inspectors: M M l%19 FG K W. F. Sanders, Senior Resident Inspector, Construction Date Signed
& "0-0 U l2,1986 Oste Signed p J. F. Rogge, Senior Resident Inspector, Operations Accompanying Peronnel: J. Schepens, Resident Inspector, Construction
~
Approved by: 2r , k /fD M.-V.iSinkule, Section Chief .Dafe Signed'
Division of Reactor Projects SUMMARY Scope: This routine, unannounced inspection entailed 352 resident inspector hours on site (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> were on backshifts) _ inspecting: quality assurance, ~
refueling cavity seal ring installation, refueling canal welding, containment
~
dome reinforcing steel and tendon sheathing, cavity liner plate welding, containment post tensioning, reactor coolant system primary loop piping
~
installation'and welding, safety-related piping installation and welding, reactor-vessel internals fit-up and invessel storage activities, and storage and protection of safety-related equipmen Results: One violation was identified (Failure to Follow Procedure to Prevent Dissimilar Metallic Materials from Coming in Direct Contact with One Another -
paragraph 14).
i i
8505200577 850418 PDR ADOCK 05000424 G PDR
_ _ _ _ _ _ _ _ _ .
.- .
APR 181985 REPORT DETAILS
. Persons Contacted Licensee Employees
- D. O. Foster, Vice President and Project General Manager P. D. Rice, Vice President and General Manager, Quality Assurance W. T. Nickerson, Deputy Project General Manager W. C. Ramsey, Readiness Review Manager H. H. Gregory III, General Manager Nuclear Construction
- M. H. Googe, Project Construction Manager G. Bockhold,'Jr., General Manager Nuclear Operations 0. Batum, General Manager Engineering and Licensing C. W. Hayes, Vogtle Quality Assurance Manager C. E. Belflower, Quality Assurance Site Manager - Construction
- E. D. Groover, Quality Assurance Site Manager - Construction
'
S. D. Haltom, Quality Assurance Engineering Support Supervisor W. E. Mundy,- Quality Assurance Audit Supervisor J. E. Sanders, Project Construction Manager - Unit 1 D. M. Fiquett, Project Construction Manager - Unit 2 B. C. Harbin, Manager Quality Control
,
- J. L. Blocker, Assistant. Quality Control Manager T. L. Weatherspoon, Assistant Quality Control Manager
- G. A. P,cCarley, Project Compliance Coordinator W. C. Gabbard, Assistant Project Compliance Coordinator
- J. O. Dorough, Administrative Manager
- L. N. Brooks, Civil Manager
- Stone, Engineering Supervisor Other licensee employees contacted included craftsmen, technicians, supervision, engineers, and office personne Other Organizations F. B. Marsh, Project Engineering Manager - Bechte!
M. Malcom, Deputy Project Engineering Manager - Bechtel
- D. L. Kinnsch, Project Field Engineering - Bechtel
- D.W . Stroham, Project Quality Assurance Engineer - Bechtel
- R. J. George,- Mechanical Discipline Manager - Bechtel
- G. H. Fredy, Project Field Engineer / APE - Bechtel
- G. Introcaso, Administration Manager - Pullman Power
- T. J. Pruitt, Field QA/QC Manager - NISCO
- D. R. Murphy, Construction Engineer - Oglethorpe Power Corporation
y
- -
APR 181985
.
' 2. . Exit Interview (30703C)
The inspection scope and findings were summarized on March 22,1985, with those persons indicated in paragraph 1 above. The inspector described .the areas inspected and discussed in detail the. inspection findings listed below.- No' dissenting comments were received from the license (0 pen) Violation 50-424/85-09-01: " Failure ' to follow. procedure to prevent dissimilar metallic materials from coming in direct contact with one another" - Paragraph-1 (0 pen) IE Bulletin No. _84-03: " Refueling Cavity Water Seal" Units 1 & 2 -
Paragraph 2 The licensee did not identify as proprietary any of the materials provided
-
to.or; reviewed by the inspector during this inspectio .
, Licensee Action on Previous Enforcement Matters (92702)
Not inspecte c Unresolved Items (92701)
Unresolved items are matters -about which more information is require to
- determine ' whether they are acceptable or may involve violations or
~ deviations. Unresolved items were not identified during this inspectio . Construction Inspection - Units 1 & 2 (92706C)
Periodic inspections were made throughout this reporting period in the - form of. general type inspections in different areas of both facilitie The areas were selected on the basis of the scheduled activities and were varied to provide wide coverage. : Observations were made of activities in progress to note defective items or items of noncompliance with- the required codes and regulatory requirements. On these inspections, particular. note was made
~
,
.of the presence of ~ quality control inspectors, supervisors, and quality control evidence in.the' form of available process sheets, drawings, material l identification, material protection, performance of tests, and housekeepin Interviews . were made with craft personnel, supervisors, coordinators, quality-control inspectors, and others as they were available in the work area Unitli -independent ' inspection encompassed but was not limited to the following areas:
I- (1) Refueling Cavity Seal Ring - Periodic inspections were conducted during the weld out of the seal ring to the reactor vessel seal c ledge and -the reactor cavity- line The purpose of these inspections were to determine that the requirements of applicable specifications, codes, standards, work performance procedures! and inspections (QC) procedures were being followed. This work was completed during this inspection perio ~ '
APR 181985
.
(2) Refueling Canal - An inspection was conducted during the fit-up phase of. the bellows assembly. This was a replacement bellows being installed due to the first one being damaged after installation during the grinding operatio : to flat top the wel ' The weld prep configuration of the penetration pipe and new bellows was inspecte (3) Refueling Bridge Crane Rail Installation - An inspection was conducted of the preparation activities for the installation of the track Unit 2 independent inspection encompassed but was not limited to the following areas:
Cavity -liner plate welding - The inspector conducted a general inspection of the welding operation, i.e. , weld filler metal control and storage, fit up cleanliness requirements, slag removal and grindin No violations or deviations were identifie . Containment (Structural Concrete) - Unit 2 (47053C)
Periodic inspections were conducted of the containment dome reinforcing steel and tendon sheathing installation and the North and South walls around the steam generators to determine that the requirements of applicable specifications, codes, standards, work performance procedures and inspection (QC) procedures are being followe No violations or deviations were identifie . Containment (Prestressing) - Observation of Work Activities - Unit 1 (47063C) Procedure and Document Review The inspector reviewed and examined implementation portions of the following specification, procedure, and quality assurance manual pertaining to the installation of vertical tendons, to determine whether they comply with applicable codes, standards, NRC Regulatory Guides and licensee commitment ' Specification No. X2AF04, Revision 2, date of issue 7/24/84
" Technical Provisions for Containment Post-Tensioning System".
-
Bechtel Log No. AX2AF04-100-7, " Field Instruction Manual for Installation of VSLES-55 Post-Tensioning System Within Nuclear Containment Structures", Revision 4, dated 2/15/8 Bechtel Log No. AX2AF04-81-10, "VSL's Corporation Quality Control Program for Nuclear Power Projects", date of issue 1/19/8 .__
.__
_ - _ - _ _ _ _ _ _ _- _ . _ _ _ .__ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
- *
APR 181995 4 Installation Activities The inspector witnessed portions of the installation activities indicated below to verify the following:
-
The latest issue (revision) of applicable drawings or procedures is available to the installers and were being use Tendons were free of nicks, kinks, and corrosion; were installed in designated locations; and the installation sequence and technique was per specified requirement Installation crew was properly trained and qualifie QA inspection was properly performed by qualified personnel in accordance with applicable requirements.
I
-
Adequate protective measures were.being taken to ensure mechanical and corrosion protection during storage, handling, installation, and post installatio The following tendons were observed:
Vertical Tendon N Length Seg. N Activity 24-88* 578.7' 3 Tendon Initial Installation 22-90 577.9' 2 Mopping Tendon Sheathing
- Surveillance Tendon No violations or deviations were identifie . Containment (Steel Structures and Supports) - Units 1 & 2 (48053C)
Periodic inspections were conducted to observe containment steel and support installation activities in progress to verify the following:
-
Components were being properly ~ handled (including bending or straight-ening).
-
Specified clearances were being maintaine Edge finishes and hole sizes were within tolerance Control, marking, protection and segregation were maintained during storag Fit-up/ alignment meets the tolerances in the specifications and drawing ._ .
APR 181985
No violations or deviations were identifie . Safety-Related Structures (Structural Steel and Supports) - Units 1 & 2 (48063C)
Periodic inspections were conducted to observe construction activities of safety-related structures / equipment supports _for major equipment outside the containment to verify that:
-
Materials and components are being properly handled to prevent damag Fit-up and alignment are within tolerances in specification and drawing requirement Specified clearances from adjacent components are being me No violations or deviations were identifie . Reactor Coolant Pressure Boundary Piping - Observation of Work and Work Activities - Unit 1 (49053C)
During the inspection period pipe run walkdowns were performed where piping installation is near completion to determine whether the piping run is installed as shown on approved drawings and in accordance with applicable construction specifications. Specific pipe run walkdowns of ASME B&PVC,Section III, Class 1 piping inspected is listed below:
ISO No./ Revision Pipe Run Inspected 1K4-1201-049-02, Rev. 08 RCS Loop "4" Line No. 1201-049-12" From Hot Leg to Valve HV 8702A (RHR Sys. Train B Suction Line)
1K4-1204-023-02,-Rev. 10 RHR Hot Leg Injection Crossover to 1K4-1204-023-03, Rev. 11 RCS Hot Leg Loop No. 1 IK4-1204-021-03, Rev. 08 RHR Hot Leg Injection Crossover to RCS Hot Leg Loop No. 4 Specific areas examined during the pipe run walkdown for compliance with the applicable isometric drawings and the Plant Design and Instrumentation Construction Specification No. X4AZ01, Revision 19 were as follows:
Vent and Drain Connection and Locations Instrumentation Connections and Locations Valve Installation and Orientation Line Size and Location Fittings Type and Location Pipe / Valve / Fitting End Connections Hanger Locations and Types No violations or deviations were identifie . .
APR 181985
11. Safety-Related Piping - Observation of Work and Work Activities - Unit 1 (49063C)
During the inspection period, pipe run walkdowns were performed where piping-installation is near completion to determine whether the piping run is installed as shown on current, approved drawings and in accordance with applicable construction specifications. Specific pipe run walkdowns of ASME B&PVC,Section III, Class II piping are listed below:
ISO No./ Revision Pipe Run Inspected 1K4-1205-001-03, Rev. 5 RHR Train A Suction Line From Valve 1K3-1205-003-02, Rev. 10 HV 8701A (Line Nos. 1205-001-12" &
1205-003-12") to Elev. 160'-0" Line No. 1205-003-14" 1K4-1205-002-01, Rev. 9 RHR Train B Suction Line From Valve HV8702A (Line Nos. 1205-002-12" &
1205-004-12" to Elev.161"-6" Line No. 1205-004-14" Specific areas examined during the pipe run walkdown for compliance with the applicable isometric drawings and the Plant Design and Instrumentation Construction Specification No. X4AZ01, Revision 19 were as follows:
Vent and Drain Connections and Locations Instrumentation Connections and Locations Valve Installation and Orientation Line Size and Location Fittings Type and Size Pipe / Valve / Fitting /End Connections Hanger Locations and Types No violations or deviations were identifie . Reactor Vessel Protection - Unit 2 (50053C)
The inspection consisted of examination of the Unit 2 Reactor Vessel installed in containment to determine that proper storage protection prectices were in place and that entry of foreign objects and debris was prevented. The inspector noted that protective covers were installed on the bottom mounted instrumentation-penetration No violations or deviations were identifie . Reactor Vessel Integrated Head Package - Unit 1 (50053C)
The inspection consisted of examination of the Unit 1 integrated head ,
package stored on the refueling floor in its designated laydown area to l determine that proper storage protection practices were in place, entry of foreign objects and debris was prevented, and that access was controlle No violations or deviations were identified. . . . _ ,
' ~
- -
APR 1- 8 1985 -
1 Reactor Vessel Internals - Unit 1(50063C)
Periodic-inspections were conducted during .the inspection period when the upper. - and lower ! internals were stored in the cavity in their designated .
storage area' to ' determine that proper storage protection' practices 'were in place, entry of foreign objects and debris was. prevented, and that access was-controlled. The inspection' also . included the fit-up operation, the
' installation of the . reactor vessel internals, and the integrated head pack-age. This activity consisted of the.following tasks:
-
. Trail fit-up of~the core barrel to the Reactor vessel to record fit-up clearances, e.g... nozzle gap measurements between the CSB and RV (with Clevis inserts) and clearance dimensions of lower radial support key,
,
.etc.
- -'
Removal of the core barrel and storage in its designated area.
,
,
-~
Radial support clevis insert dowel pin reaming, installation of dowel pins, and locking bar Refit-up of core barrel to the Reactor Vessel.
-
Installation of the hold-down spring.
1-I -
Trial fit-up of the upper internals to record fit-up clearance ~
-
Installation of the Reactor Pressure Vessel integrated head onto the Reactor. Vessel flange seal .and trial fit-up of the stabilizer bracket The' inspector reviewed and examined implementation portions of the following procedures or drawings pertaining to the above Reactor Vessel internal . fit-up operation to determine whether they comply with applicable codes
- standards,-NRC Regulatory Guides and licensee commitment X4AZ06-56-3, NISCO Engineering Specification No. 4028-Vogtle-17
- Revision C; Reactor Vessel Internals Assembly
.
AX4AZ06-15-4, NISCO Engineering Specification No. 67, Revision C; Cleanliness Requirements and Control
-~
AX4AZ06-69-1, NISCO Engineering Specification No. 69, Revision A; Control,- Usage and Storage of Consumables for Use on Nickel Based Corrosion Resistant Material AX4AZ06-16-2, NISCO Engineering Specification No. 4028-Vogtle-6, Revision B; General Handling Procedur .
-
Process Control .No. 105-17, Revision A, Reactor Vessel Internals, Installation of the Lower Radial Support Clevis Insert IX6AB06-53-1, y Dwg. No. 6125EE14, Sht 2 of 3, Reactor Vessel Lower
- Radial Support Clevis Insert Gaging and Assembl . _ _ . _ _ __ .
.
_ . .
~ ~ ~
APR 181985 s ,
8 t
.
'
-
AX4AZ06-60-3, WPS'430-2-1, Revision D WPS.for Manual GTAW of inconel to Itself on-Plate, Pipe, Tube, etc.,.1/16" thru 1/4".
'
-
PQR 801, . Revision.D PQR for. combination GTAW/SMAW of Inconel to itself ' 'l on 3/8" thick. plate in 3G positio l The inspector: witnessed ' portions of ' the above Reactor Vessel internals I fit-up operations to. verify the following:
- - Lifting ~and handling are consistent with established requirements and precautions.
'
-
Lifting ~ equipment is as specified and ' required testing has been completed prior to liftin Core barrier, upper internals, and integrated head package are placed in position within-. dimensional tolerances, proper axis orientation
,
and levelnes Radial support clevis insert dowel pin and locking bar'insta11ation is-
,
in accordance with applicable specification With regard to the above operations, the inspector noted a personnel basket had been lowered into the Reactor Vessel to allow personnel to clean the hot leg nozzle mating surfaces. . During this operation . the carbon steel personnel basket came in direct contact with the Reactor Vessel stainless .
steel cladding. The inspector questioned the licensee about this operation and observed immediate action taken to remove the personnel basket and t wrap A-cloth around it to prevent carbon steel contacting the reactor vessel cladding as required by Paragraph 5.3.8 of Engineering Specification No. ES-67, Revision C dated 5/31/84.
>
' Failure to follow the above procedure is considered to be in violation of 10
-
CFR Part 50,- Appendix B, Criterion V. This-item was identified as Violation 424/85-09-01 " Failure to Follow Procedure to Prevent Dissimilar Metallic Materials From Coming in Direct Contact With One Another."
15. Safety-Related Components - Units 1 & 2 (50073C)_
The ' inspection - consisted of plant tours to observe protection installed components to determine that adequate protection from dirt, debris, water, or adjacent construction activities were in plac Unit 1 equipment examined included:
-
Residual Heat Removal (RHR) Pumps
-
Diesel Generator
- - Boric Acid Storage Tank
-
Containraent Spray (CS) Pumps
-
Containment Penetration Encapsulation Vessel for Train A&B RHR and CS
--
Auxiliary Feed Pumps _
.
- . - + - c -.-..-.._-,m -- 4 -y ,,- , ,,--,,m_- -.-v- . - - - - - . - . .-m--. - - - ,- y
. .
APR 181985
-
Pressurizer
-
Main Coolant Pump Casings
-
Steam Generators
.~
-
Safety Injection Pumps
-
Auxiliary Component Cooling Water (ACCW) Heat Exchangers
-
Component Cooling Water Heat Exchangers
-
ACCW Pumps
-
Reactor Makeup Pumps
-
Boron Injection Tank
-
Cable Spreading Room Train A & B
-
Integrated Reactor Pressure Vessel Head
-
4160V Train A & B Switchgear (IAA02 & IBA03)
-
13.8KV Reactor Coolant Pump Switchgear
-
Reactor Vessel Lower Internals
-
Reactor Vessel Upper Internals Unit 2 equipment examined included:
-
Residual-Heat Removal (RHR) Pumps
-
Containment Spray (CS) Pumps
-
Containment Penetration Encapsulation Vessel for Train J4 & B RHR and CS
-
Pressurizer
-
Steam Generators
-
Safety Injection Pumps
-
Reactor Vessel No violations or deviations were identified.
n 16. Electrical (Components and Systems) - Units 1 & 2 (51053C)
Periodic inspections were conducted during the inspection period to observe safety-related electrical equipment to verify that the installation and storage were accomplished in accordance with applicable requirements. The following areas were examined during the inspections:
-
Location and alignment
-
Type and size of anchor bolts
-
Identification
-
Segregation and. identification of nonconforming items
-
Equipment space heating
-
Rotation of motor shafts
-
Lubrication and fluid levels
-
Protective coatings, preservations, desiccants, inert gas blanket, et No. violations or deviations were identifie . Electrical (Cables and Terminations) - unit 2 (51063C)
Periodic inspections were conducted during the inspection period to determine whether the raceway installation and protection of installed cable is in accordance with applicable codes, standards, and NRC Regulatory Guide .
APR 181985
In reference to the raceway installation, the following areas were inspected to verify compliance with the applicable requirements:
-
Identification
-
Alignment
-
Bushings (Conduit)
-
Grounding
-
Supports and Anchorages In reference to the installed cable, the following areas were inspected to verify compliance'with the applicable requirements:
-
Protection from adjacent construction activities (welding, etc.)
-
Coiled cable ends properly secured
-
Unterminated cable ends taped
-
Cable trays, junction boxes, etc., reasonably free of debris
-
Conduit capped, if no cable installed
-
Cable supported No violations or deviations were identifie . Reactor Coolant Pressure Boundary (Welding) - Unit 2 (55073C)
Periodic inspections were conducted on Reactor Coolant System Primary Loop pipe ~ welds at various stages of weld completio The purpose of the inspection was to determine whether the requirements of applicable specifications, codes, standards, work performance' procedures and (QC)
procedures were being met as follows:
-
Work was conducted in accordance with a process sheet which identified the weld and its location by system, references procedures or instructions, and provides for production and QC signoff Welding procedures, detailed drawings and instructions, were readily available and technically adequate for the welds being mad Welding procedure specification (WPS) were in accordance with the applicable ASME Code requirements and that a Procedure Qualification Record (PQR) is reference and exists'for the type of weld being mad That the base metals, welding filler materials, fluxes, gases and insert materials were of the specified type and grade, have been properly ' inspected, tested and were traceable to test reports or certification That the purge and/or sheilding gas flow and composition were as specified ~1n the welding procedure specification and that protection was provided to shield the welding operation form adverse environmental condition _ _
' *
APR 181985
-
' That - the weld joint geometry including pipe . wall thickness was specified and that surfaces to be welded have been prepared, cleaned and inspected in accordance with applicable procedures or instruction That the pipe to be welded to the component were assembled and held in place within specified gap and alignment tolerances-allowed by the ASME Cod That a sufficient number of adequately qualified QA and QC inspection personnel were present at the work site, commensurate with the work in progres That disbursement of welding material was controlled in accordance with approved procedure Procedure / Drawing Review The following documents were reviewed:
-
2X4D4A17, Rev. 7, Reactor Coolant Loops
-
(W) 32-III/I-8-12, Rev. A, Procedure for tacking the inser III/I-8-K1-A1, Procedure for welding the reactor coolant system primary loop pipin Process Sheet No. 2X4D4A17 003-W-0 Process Sheet No. 2X404A17 002-W-0 Process Sheet No. 2X404A17 006-W-0 Process Sheet No. 2X404A17 007-W-0 Installation Activities The inspection observed the above criteria on the following Reactor Coolant System primary pipe welds at various stages of weld out during the inspection perio Weld N Weld Out Stuge Inspected 002-W-02 Fit-up 006-W-01 1/3 out 006-W-02 Weld prep 010-W-01 Welded out
~003-W-02 Welded out 007-W-01 Fit-up 007-W-02 Weld prep 011-W-01 1/3 out 011-W-01 1/3 out No violations or deviations were identified.
.c _a
__,
-- -
APR 181985
1 Safety-Related Piping (Welding) - Unit 1 (55083C)
Periodic inspections were conducted on safety-related pipe welding at various stages of weld completion. The purpose of the inspection was to determine whether the requirements of applicable specifications, codes,_
~s tandards, work performance procedures and QA procedures are being met as follows:
-
That the weld area cleanliness was maintained and that pipe alignment and fit-up tolerances were within specified unit That weld filler material being used was in accordance with welding specifications that unused filler material was separated from other types of material and was stored in heated cans, and stubs properly removed form the work locatio That there were no evident signs of cracks, excessive heat input, sugaring, or excessive crow Installation Activities
+
During the inspection period, welds at various stages were observed in the following systems:
-
Residual Heat Removal System
-
Component Cooling Water System
-
Chemical & Volume Control System
-
Nuclear Service Cooling Water System No violations or deviations were identifie . IE Bulletins (IEB) - Units 1 & 2 (92703B)
(0 pen) IEB No. 84-03: " Refueling Cavity Water Seal", Units 1 & 2. The Resident Inspectors have reviewed Georgia Power Company's letter of March 7, 1985, File No. X7BC24, Log No. GN-543, in order to determine if the requested actions of the bulletin have been acceptably addressed. This item is also under review by the Division of Reactor Safety Test Programs Section and will be closed pending the completion of this revie . .