Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20198B8021998-12-0909 December 1998 Lists Issues Being Raised Re Bradshaw Reservoir NPDES Permit PA 0052221,as Follow Up to Recent Telcon.Historical Ph Grab Sample Data for Ebpc Discharge Encl ML20198B8091998-12-0909 December 1998 Submits Listed Info as follow-up to Recent Telcon Re Bradshaw Reservoir NPDES Permit PA 0052221.Historical Do Grab Sample Data for Ebpc Discharge,Encl ML20154K8401998-10-14014 October 1998 Requests Change in Usage Rates for Listed Betz Dearborn Chemical Additives Re Inhibitor AZ8104,Depositrol PY5206 & Spectrus BD1500 ML20151S7311998-09-0101 September 1998 Requests That LGS NPDES Permit PA0051926 Be Amended by Adding Betzdearborn Chemical Additive Spectrus BD1500 to Part C of Permit.Additive Will Be Used for Controlling Algae Growth in Cooling Water Sys ML20237E8541998-08-21021 August 1998 Requests That NPDES Permit PA0051926 Be Amended by Adding Betzdearborn Chemical Additives Inhibitor AZ8104 & Depositrol PY5206 to Part C of Permit & Used for Controlling Corrosion & Scaling in Cooling Water Sys ML20236U2611998-07-23023 July 1998 Requests Temporary Approval to Discharge Effluent from Dewatering of Dredge Matl to Stormwater Outfall 012 at Limerick Generating Station ML20248B3691998-05-20020 May 1998 Submits Request That NPDES Permit PA0051926 Be Amended by Adding Chemical Additives Betzdearborn Spectrus NX1100 & Continuum AEC3120 to Part C of Permit ML20217P2601998-04-27027 April 1998 Requests That NPDES Permit PA0051926 Be Amended by Modifying Total Suspended Solids Monitoring Requirement & Requirement for 24 H Composite Sampling of Zinc,Copper & Phosphorus ML20217D4491998-04-16016 April 1998 Requests Approval to Revise Scope of Aquatic Biology Assessment Program by Reducing Biological Monitoring ML20202H6071998-02-0909 February 1998 Documents 980204 Meeting Re Regulatory Requirements for Monitoring Total Suspended Solids as Contained in Facilities NPDES Permit PA0051926 ML20198N7991998-01-14014 January 1998 Forwards Proposed Study Plan to Evaluate Effects of Water Diversion Sys Discharge on Fecal Coliform Levels in East Branch Perkiomen Creek ML20197J5021997-12-23023 December 1997 Forwards Completed NPDES Permit Application for Bradshaw Reservoir,Application General Info,Evidence of Municipal & County Notification & Check for Application Fee.Change to Current Monitoring Requirements Requested ML20203F8181997-12-10010 December 1997 Requests That 960508 Approval to Utilize Chemical Additive Betz Deposi-Trol 855D Be Amended to Include Outfall 001 as Sampling Point ML20151K1421997-07-30030 July 1997 Requests Temporary Approval to Discharge Effluent from Dewatering of Dredge Matl to Stormwater Outfall 012 at Plant ML20116M1121996-08-15015 August 1996 Forwards Corrected Total Suspended Worksheet ML20115D7161996-07-10010 July 1996 Requests Temporary Approval to Discharge Effluent from Dewatering of Dredge Matl to Stormwater Outfall 012 at Lgs. Sediments Will Be Removed & Placed in Low Lying Area Adjacent to Pump House.Project Scheduled to Begin 960805 ML20113A6831996-06-18018 June 1996 Requests That NPDES Permit PA0051926 Be Amended to Include Net Total Suspended Solids Calculation Worksheet for Outfall 001 ML20112B6091996-05-17017 May 1996 Requests Review & Approval of Encl computer-generated Discharge Monitoring Rept Form Developed by Licensee ML20203F7851996-05-0808 May 1996 Responds to Requesting Approval to Use Chemical Additive Betz Deposi-Trol 855D for Cleaning of Heat Exchanger Tubes at Station.Request Approved W/Listed Conditions ML20108B3191996-04-23023 April 1996 Requests That Chemical Additive Betz Deposi-Trol 855D Added to Plant NPDES Permit PA0051926 ML20094D9901995-10-19019 October 1995 Requests That LGS NPDES Permit PA0051926 Be Amended to Allow Use of Chemical Additive Betz Bio-Trol 88P in Cooling Water Sys at LGS ML20098C9551995-10-0202 October 1995 Forwards Summary of Util post-diversion Biological Monitoring of Aquatic Community in East Branch Perkiomen Creek ML20087C3201995-08-0202 August 1995 Requests LGS NPDES Permit PA0051926 Be Amended to Allow Use of Listed Betz Chemical Additives in Cooling Tower & Emergency Spray Pond Treatment Programs ML20083B6291995-05-0101 May 1995 Submits Requested Info Re Plant NPDES Permit PA0051926 ML20082N9111995-04-13013 April 1995 Requests That Sampling Parameters Listed for Outfalls 003 & 005 Be Removed & Incorporated as Part of Monitoring Points. Schematic Showing How Drain Lines,Condensers & Outfalls 003 & 005 Aligned Encl ML20080P7401995-02-28028 February 1995 Discusses Plant Units 1 & 2 950127 Outfall 005 Total Zinc Concentration in Excess of Daily Max Limitation.Informs That Interim Corrective Action Implemented to Temporarily Suspend Use of Outfalls 005 & 003 Until Cause Further Investigated ML20078M6001995-02-0202 February 1995 Requests That NPDES Permit PA0051926 Be Amended ML20071L0811994-07-25025 July 1994 Forwards Ltr Re Approval of Betz Chemical Additive PEC10 at Facility ML20069M3241994-06-14014 June 1994 Requests NPDES Permit PA0051926 Application to Allow Use of Sodium Bromide 40,supplied by Albermarle Corp,As Alternative to Currently Permitted Bromide Plus,Supplied by Jnb Labs ML20069D1631994-05-24024 May 1994 Requests Amend to Permit PA0051926 for Approval to Use Betz Bio-Trol 107,per Chapter 92.7, Reporting of New or Increased Discharges, of Dept of Environ Resources Rules & Regulations ML20069D1611994-05-23023 May 1994 Provides Listed Info,As Per Request to Update LGS NPDES Permit PA0051926 Application.Evidence of Municipal & County Notification Also Encl.Fee Paid ML20065S2641994-05-11011 May 1994 Forwards Ltr Requesting Temporary Approval for Use of Betz Products Peco 3,PEC10 & PEC12 for 6-month Period.Chemicals Replacements for Currently Used Peco 4 & Peco 5 & Will Be Used for Corrosion & Deposition Control in CWS ML20064K8581994-03-17017 March 1994 Requests That NPDES Permit PA0051926 Be Amended to Allow Use of Betz Foam Trol 144A a Replacement for Betz Foam Trol CT, Per Chapter 92.7, Reporting of New or Increased Discharges ML20063K1581994-02-15015 February 1994 Requests LGS NPDES Permit PA0051926 Be Amended to Allow Use of R.J.D Products,Inc Formula 65 Foaming Agent to Perform Condenser Leakage Testing at LGS ML20063F1511994-01-31031 January 1994 Requests NPDES Permit PA0051926 to Be Amended to Allow Solution Pentaborate to Be Discharged to Schuylkill River from Outfall 001 Via Holding Pond (Monitoring Point 201) ML20063C8041994-01-27027 January 1994 Requests Extension of Approval to Continuously Discharge Perkiomen Creek Water to Possum Hollow Run Through Apr 1995 or Until New NPDES Permit Issued.S Garg Indicating Approval Expires on 940228 Encl ML20046B8091993-07-28028 July 1993 Requests That NPDES Permit PA0051926 Be Amended to Allow for Use of Biocide Betz 3625 as Alternative to Betz CT-1 for Routine Biological Control at Plant.Favorable Response Requested by 930901 ML20044G5461993-05-26026 May 1993 Requests Amend to NPDES Permit PA0051926,approving Testing of Nalco 7455 (anti-foaming Agent) in Cooling Towers at Facilities.Matl Data Sheets & Aquatic Toxicity Data for Nalco 7455 Encl ML20127M2541993-01-19019 January 1993 Requests That NPDES Permit PA0051926 Be Amended to Reflect Change in Discharge Rate Re Continuous Overflow of Perkiomen Creek Water ML20127G3731993-01-14014 January 1993 Forwards Completed NPDES Renewal Application for Bradshaw Reservoir.Evidence of Municipal & County Notification,Proof of Local Newspaper Public Meeting Notice & Check 13002380) in Amount of $500 for Application Fee Also Encl ML20115B0251992-10-0606 October 1992 Requests That NPDES Permit PA 0051926 Be Amended to Allow Continuous Flow of Perkiomen Creek Water to Discharge to Possum Hollow Run Via Outfall 020 ML20077K1651991-08-0202 August 1991 Responds to 910715 Notice of Violation from NPDES Permit PA 0051926.Corrective Actions Included Removal of All 55 Gallon Drums Temporarily Stored in Schuykill Intake Bldg Pumphouse ML20062E9931990-11-15015 November 1990 Responds to 901031 Notice of Violation from Insp on 900918. Corrective Action:Routine Tests Developed & Implemented to Perform Functional Checks of Level Probe to Ensure Proper Operation ML20245H6891989-08-10010 August 1989 Forwards Info in Response to Requesting Informal Discovery.Related Correspondence ML20247Q8341989-07-31031 July 1989 Ack Receipt of Executed Agreement Re Disclosure of Confidential Info Pertaining to T-102,Sheet 1 of 1-Primary Containment Control-Limerick Generating Station Trip Procedure. W/O Encl.Related Correspondence ML20247Q6791989-07-28028 July 1989 Provides Response to Section a to Requesting Informal Discovery.Sections B,C,D & E Fall Outside of Scope of Board 890718 Memorandum & Order & Further Response to Sections Deemed Unnecessary.Related Correspondence ML20244B1881989-04-0505 April 1989 Notifies of Util Intent to Use Chlorine in Spray Pond at Plant to Control Algae.Forwards Ltr from Station Detailing Chlorination Program & What Steps Will Be Taken to Prevent Discharge from Spray Pond During Chlorination ML20149K1221988-02-16016 February 1988 Recommends Listed Insp & Corrective Actions Be Taken Prior to Startup of Fairbanks Morse Emergency Diesel Generators. Upon Completion,Engine Should Be in run-in Schedule ML20196C6441988-02-0909 February 1988 Forwards Completed Application Form 2c Part V A,B & C Analysis for Discharge Point 007 & Discharge Points 002-005 to Be Attached to NPDES Permit Application Submitted on 871217 ML20237E4541987-12-18018 December 1987 Requests Confirmation of Address for Svc of Documents. Related Correspondence 1998-09-01
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20245H6891989-08-10010 August 1989 Forwards Info in Response to Requesting Informal Discovery.Related Correspondence ML20247Q8341989-07-31031 July 1989 Ack Receipt of Executed Agreement Re Disclosure of Confidential Info Pertaining to T-102,Sheet 1 of 1-Primary Containment Control-Limerick Generating Station Trip Procedure. W/O Encl.Related Correspondence ML20247Q6791989-07-28028 July 1989 Provides Response to Section a to Requesting Informal Discovery.Sections B,C,D & E Fall Outside of Scope of Board 890718 Memorandum & Order & Further Response to Sections Deemed Unnecessary.Related Correspondence ML20244B1881989-04-0505 April 1989 Notifies of Util Intent to Use Chlorine in Spray Pond at Plant to Control Algae.Forwards Ltr from Station Detailing Chlorination Program & What Steps Will Be Taken to Prevent Discharge from Spray Pond During Chlorination ML20149K1221988-02-16016 February 1988 Recommends Listed Insp & Corrective Actions Be Taken Prior to Startup of Fairbanks Morse Emergency Diesel Generators. Upon Completion,Engine Should Be in run-in Schedule ML20196C6441988-02-0909 February 1988 Forwards Completed Application Form 2c Part V A,B & C Analysis for Discharge Point 007 & Discharge Points 002-005 to Be Attached to NPDES Permit Application Submitted on 871217 ML20237E4541987-12-18018 December 1987 Requests Confirmation of Address for Svc of Documents. Related Correspondence ML20237B7631987-12-0909 December 1987 Forwards Results of Analysis of Addl Cartridge Sample Which Is Required When Number of Operable Channels Less than Number Required by Tech Specs,As Followup to 871202 Response to .W/O Encl.Related Correspondence ML20237B7691987-12-0707 December 1987 Requests Listed Info Re ASLB 871120 Memorandum & Order, Including Radiological Tech Specs Concerning 10CFR50,App 1 Requirements Involving Principle Alara. Related Correspondence ML20236X2561987-12-0404 December 1987 Provides Results from Weekly Analysis of Cartridges from Iodine Sampling Sys.Related Correspondence ML20236X2291987-12-0202 December 1987 Provides Listed Items in Response to & in Accordance W/Aslb 871120 Memorandum & Order,On Behalf of Util.Related Correspondence ML20238E5291987-09-0404 September 1987 Responds to 870730 Petition on Behalf of Limerick Ecology Action,Inc,Stating That Review of State & Local Radiological Emergency Response Plans Re Plant Violate FEMA Regulations. Petition Viewed as Lacking Merit.Related Correspondence ML20214N5151987-05-26026 May 1987 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per ASLB 820601 Order.W/O Encls.Related Correspondence ML20206E2491987-03-31031 March 1987 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies.Per ASLB 820601 Order.W/O Encl.Related Correspondence ML20211G5851987-02-20020 February 1987 Forwards Documents & Correspondence Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,In Accordance W/Aslb 820601 Order.Related Correspondence ML20212F7981987-02-19019 February 1987 Submits Testimony Opposing Granting Extension of Revs 5 & 6 to Docket D-69-210 CP for Facility.Author Unable to Attend 870225 Public Hearing ML20211A3101987-02-11011 February 1987 Requests Permission to Use Nalco Acti-Brom 1338 at Facility Discharge Point 001 as Chlorine Enhancer During Testing Program.Program Expected to Begin in Mar 1987 & Continue for Approx 2 Wks ML20211A7711987-02-11011 February 1987 Forwards Documents & Correspondence Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Govt Agencies,Per 820601 ASLB Order.W/O Encls.Related Correspondence ML20215E7241986-12-15015 December 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies.W/O Encls.Related Correspondence ML20215E7011986-11-28028 November 1986 Submits Testimony for Delaware Water Commission 861125 Hearing Re Util Request to Reduce Flow Requirements for Withdrawal of Schuylkill River Water for Plant Cooling. Related Correspondence ML20211D1081986-10-14014 October 1986 Forwards Correspondence & Documents Re Emergency Planning Among Util,Nrc,Commonwealth of PA & Other Govt Agencies. Related Correspondence ML20210H8951986-09-23023 September 1986 Forwards Semiannual Effluent Release Rept 2,Jan-June 1985 & Two Corrections & 22 ML20209H8041986-09-11011 September 1986 Submits List of Witnesses for Hearing Scheduled for 860922, Per ASLB Order.Sample of Sheets Used in call-up Sys Encl. Related Correspondence ML20205G9211986-08-11011 August 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per ASLB 820601 Order.Related Correspondence. W/O Encl ML20205C4831986-08-0707 August 1986 Requests That TR Campbell Be Made Available to Testify at 860818 Hearing Re ASLAP Remanded Initial Decision Concerning Sufficient School Bus Drivers to Evacuate Children in Listed Districts.Related Correspondence ML20214H2511986-08-0505 August 1986 Requests Permission to Use Nalco 1360 & Nalco 1372 for Cooling Water Treatment at Discharge Point 001.Existing Treatment Program,Utilizing Nalco 1336,1370 & 2513,will Be Terminated Upon Approval.Bulletins & Data Sheets Encl ML20199J4211986-06-0505 June 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per ASLB 820601 Order.W/O Encls. Related Correspondence ML20197D7981986-05-0707 May 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc Staff,Commonwealth of PA & Other Responsible Governmental Agencies.W/O Encl.Related Correspondence ML20141F3401986-04-14014 April 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Govt Agencies,Per ASLB 820601 Order.W/O Encl.Related Correspondence ML20155D6321986-04-0909 April 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order.W/O Encl. Related Correspondence ML20141D3021986-03-27027 March 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,In Accordance W/Board 820601 Order. Related Correspondence ML20154Q1221986-03-18018 March 1986 Forwards Documents Re Pleadings & Attachments That Licensee Filed in Consolidated Cases Concerning Check Valve & Containment Isolation.W/O Encls.Related Correspondence ML20154M7011986-03-0505 March 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per ASLB 820601 Order.W/O Encl.Related Correspondence ML20214B9761986-02-12012 February 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per ASLB 820601 Order.W/O Encl.Related Correspondence ML20137P9331986-01-29029 January 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per Board 820601 Order.W/O Encl.Related Correspondence ML20198H0371986-01-15015 January 1986 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies.W/O Encl.Related Correspondence ML20154B0671986-01-0909 January 1986 Forwards Documents Re Emergency Planning Among Applicant, Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per ASLB 860601 Order.W/O Encls.Related Correspondence ML20137A9011986-01-0909 January 1986 Requests Revs to Proposed Stipulation Re Util Arrangements for Handling & Treatment of Onsite Contaminated Injured Individuals at Backup Hosp.Contention Should Be Withdrawn. Related Correspondence ML20151P1091985-12-31031 December 1985 Confirms 851231 Telcon Re Remaining Issue of Adequate Backup Hosp for Onsite Emergency Preparedness in Accordance w/ALAB-819.Related Correspondence ML20138R1321985-12-23023 December 1985 Advises That B Rader Sending Basic Procedure,Equipment & Training Documents for Montgomery Hosp.Hosp Providing Treatment for Radiological Accident Victims.Confirms Linnemann 860103 Deposition.Related Correspondence ML20138P5581985-12-18018 December 1985 Forwards Documents & Correspondence Among Applicant,Nrc, Commonwealth of PA & Other Govt Agencies Re Emergency Planning,Per ASLB 820601 Order.W/O Encl.Related Correspondence ML20138R8991985-11-14014 November 1985 Forwards Info Re Emergency Planning Among Applicant,Nrc, Commonwealth of PA & Other Govt Agencies,Per Board 820601 Order.W/O Encl.Related Correspondence ML20198E2731985-11-0505 November 1985 Forwards Correspondence & Documents Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Govt Agencies,Per Board 820601 Order.W/O Encls.Related Correspondence ML20133F9611985-10-0404 October 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per ASLB 820601 Order. Related Correspondence ML20132D5781985-09-18018 September 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order. Related Correspondence ML20132D5951985-09-16016 September 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order. Related Correspondence ML20132D6561985-09-16016 September 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order. Related Correspondence ML20134K7611985-08-23023 August 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order. Related Correspondence ML20134K0291985-08-23023 August 1985 Forwards Correspondence & Documentation Re Emergency Planning Among Applicant,Nrc,Commonwealth of PA & Other Responsible Governmental Agencies,Per Board 820601 Order. Related Correspondence ML20127M5321985-06-25025 June 1985 Submits Appeal Revoking RM Krimm 850521 & 30 Certifications Re Offsite Radiological Planning & Preparation for Plant & Declaring That Emergency Plans Inadequate Per 44CFR350.12(e) & 350.15(a).Related Correspondence 1989-08-10
[Table view] |
Text
RELATED CCFDISIONDENCE k s LAW OFFICES GONNER 6e WETTERHAHN, P.G. '
1747 PENNSYLVANIA AVENUE. NrWy_.,
M a s J. wgTTEE N AEN WAS HINGTON. D. C. 2 0006 ,,
zonanTM. MADRE ENORID M. OLSON
^ " 5 *. " "i " "' 24 11G0 -3 Att :21 '" "'" * "
C*:""i.. .. . .. August 1, 1984 l .' o N Miss Maureen Mulligan HAND DELIVERY Limerick Ecology Action P.O. Box 761 762-Queen Street Pottstown, PA 19464 In the Matter of Philadelphia Electric Company (Limerick Generating Station, Units 1 and 2)
Docket Nos. 50-352 and 50-353 0 L_
Dear Miss Mulligan:
This letter will confirm the points we discussed in our telephone conversation on Friday, July 27, 1984, the agree-ments reached, and the matters in dispute regarding LEA's answers to Applicant's first set of interrogatories and request for production of documents. I would have called sooner, except that your answers, postmarked July 19, did not reach me until July 23, 1984. When I spoke to you on July 24, you stated you would be unavailable on July 25 to discuss the answers. As described below, I am including a copy of the callaway decision I discussed, relating to
+ interrogatories requiring an intervenor to provide answers as to how alleged emergency planning deficiencies should be resolved. I will discuss each interrogatory in order and then our request for production of documents.
General Interrogatories 1-2. These interrogatories requested you to provide information regarding any expert and fact witnesses. LEA's answer that it has not yet determined which contentions will be litigated is nonresponsive and unacceptable. The pos-sibility exists in every case that any particular contention will not be litigated. This is irrelevant. I noted that Applicant is entitled to information regarding witnesses whom LEA has presently lined up, even though others will be sought. You nonetheless declined to answer the interroga-tories in view of your position that contentions might be dropped.
8400060182 840801 PDR ADOCK 05000352 0 PDR TSOS
c- i Mico Mrurcen Mulligan g August 1, 1984 Page 2
- 3. I noted that LEA's answer stated that it "has relied" upon certain unspecified "RERP related documents and correspondence."' You agreed to provide me a specific list of documents upon which LEA will rely.
Specific Interrogatories
- 1. In response to subpart (g), you agreed to p: ovide me with all alleged deficiencies in the plans and implement-ing procedures, not just ones in your answers which you deem to be " representative."
4, 5 and 21. This interrogatory asks for information regarding the unwillingness of any school teacher or staff to perform his responsibilities in the event of a radio-logical emergency. LEA's answer states that it "has not conducted such a survey." I noted that the interrogatory did not request you to conduct a survey, but only sought whatever information LEA has. You stated that you wished to consult with Mr. Elliott, but declined at that time to provide the information or agree to do so. I note that with regard to Interrogatory 20, by contrast, you agreed to check with LEA members and provide such information.
- 6. Regarding the level of nonperformance by teachers and staff required to supervise students in the event of a radiological emergency, your answer cites a figure of 75% as stated by Dr. Claypool. Clarifying your answer, you stated that LEA does not itself have any other figure independent of Mr. Claypool's statement.
- 8. This interrogatory sought the basis for LEA's allegations that teachers and staff will abandon their assigned duties in the event of a radiological emergency.
LEA's answer states that " LEA's present concerns are based on general conversations with teachers and other school staff." You advised me that further information is being accumulated, but declined to provide me with information presently on hand.
9, 17, 25, 27, 39 and 43. Each of these interroga-tories requests LEA to specify any change in the plans l and/or implementing procedures which it asserts to be l necessary in order to assure that there is adequate planning
- for the particular aspect in question. As I noted during our conversation, the Licensing Board in Callaway required answers to the same interrogatories. See Union Electric Company (Callaway Plant, Unit 1) , Docket No. STN-50-483 OL,
" Memorandum and Order (Applicant's Motion to Compel)"
L
Miss Mnurcan Mulligan i August 1, 1984 Page 3 (December 9,1982) (copy attached). In that case, the Board
! held at page 3:
In another series of interrogatories, 4 numbered 33, 41, 45, 58, 59, 60, 66, 77 and 90, the Applicant sought to uncover the grounds for a number of Intervenor's contentions. The questions were object-ed to on the basis that they call for conclusions or possible resolutions to problems that are not the responsibility of the Intervenor. In the Intervenor's view, he has only to prove the validity of a contention and not provide answers as to how emergency planning defi-ciencies should ba resolved. The discovery process would be meaningless if it did not permit parties to probe the foundation or basis of a litigant's claim. One acceptable method for such i
probing is to solicit positive solutions from the litigant for deficiencies alleged to exist. This is what the App'.icant has attempted to do here and the interrogatories are appropriate, as a means of determining the strengths and weaknesses of an opponent's case.
Obviously, if LEA regards the plans and procedures as deficient, it necessarily holds an opinion as to how they must be amended in order to assure adequate planning. Such
< matters clearly go to the heart of the contentions and are entirely relevant to their disposition.
I also note that LEA did not object to Interrogatories 11, 15 and 41, which seek the same kind of information.
- Your answers to those interrogatories state that LEA will
' provide such information, or you agreed to provide this information during our conversation. Nonetheless, you declined to provide these answers without first reviewing the Callaway decision.
- 12. You agreed to provide me with the testimony to which this answer refers.
- 14. LEA's answer does not refer to any particular dosimetry. You stated to me that any dosimetry customarily used for emergency planning would be acceptable. You agreed to provide me a more specific answer if LEA contends that
p Mica M;urcen Mulligan i August 1, 1984 Page 4 the dosimetry which PEMA contemplates for use is unaccept-able. ,
- 15. With regard to LEA's contention regarding adequate dosimetry and KI supplies, you agreed to define "predistribution" as used in your answer.
- 16. This interrogatory asked LEA to specify all elements of training ' which it -contends the planners must provide to school bus drivers, teachers and other school staff. Your answer that "[t] raining has not progressed to the point that LEA can answer this question" is nonrespon-sive. LEA can take a position on what training must be provided regardless of the status of the training program.
Nonatheless, you declined to provide this information.
- 18. This interrogatory seeks information regarding alleged defects in the plans, implementing procedures or g training provisions as regards "the assignment of school bus drivers to transport students." Your answer asserts that LEA cannot answer this question until buses have been assigned to individual schools. As I stated during our conversation, I see not way in which the adequacy of assign-ing school bus drivers is dependent upon the assignment of particular buses to particular schools. You declined to provide this information.
- 19. Clarifying your answer, you indicated that the sources of IEA's information were the letter to the Licens-ing Board from Dr. Claypool and Attachment 3 to your an-swers.
- 20. You stated that you would check with LEA members to determine whether they could recall their conversations with particular individuala. You agreed to supply any such information.
- 22. Regarding the level of nonperformance by school bus drivers in the event of a radiological emergency, LEA stated in its answer that it cannot respond until "the additional unmet needs indicated in the present RERP's have been assigned and arrangements have been completed." As I stated during our conversation, this particular interroga-tory is not dependent upon the status of the plans; it seeks LEA's position as to how many or what percentage of school bus drivers will abandon their duties. This is not based on any " unmet needs."
~
Miss Maureen Mulligan v August 1, 1984 Page 5
. 23. LEA's answer regarding the level of nonperformance by school bus drivers which would render the plans incapable of implementation refers to Dr. Claypool's figure of 25% as to school teachers. In our conversation, you adopted this as LEA's position for bus drivers and agreed to provide me with any other information taking a different position.
- 28. This interrogatory sought information regarding LEA's and FOE's assertions that traffic congestion in parks and other areas will affect evacuation of the EPZ. Your answer states that LEA and FOE are conducting an inves-tigation and that the requested information will be provided at a later date. You stated that you are checking on this with Mr. Anthony. In response to your comment about a
" survey," I stated that the Applicant was not asking either LEA or FOE to conduct any survey, but only sought available information. You declined to provide me with any commitment as to the date upon which this " investigation" would be completed or when the information would be provided.
- 29. You stated that LEA forwarded the Evacuation Time Estimates report to Mr. Steven Sholly about one or two weeks after receipt by LEA. You agreed to check on the status of his review to determine when the answer to this interroga-tory would be available, but declined to make any commitment as to the date.
- 30. You took the same position here as to the previous interrogatory, stating that you also intended to contact certain park personnel. You declined to make any commitment regarding the time within which any further information would be submitted.
31-33. You stated that Mr. Anthony was obtaining "the PENNDOT traffic analysis" cited in LEA's answer, which you agreed to furnish me once obtained. You stated that you w'uld provide me with the title and date of the study if you cid not obtain a copy.
- 34. You clarified LEA's answer regarding responses
" attached" as being Attachments 4-7. You stated that the
" telephone inquiries" to which the answer refers were those listed in response to Interrogatory 35. I also asked what was meant by the last portion of the answer, which states:
"as well as their familiarity with the fact that they were listed in the RERP's." You stated that you were unable to explain what this means and agreed to delete it from your answer unless you otherwise advised me.
Miss Maureen Mulligan g August 1, 1984 L Page 6 L
~
k 35. At the end of this answer, LEA states: "Similar responses were received from other municipalities." You declined to provide me with statements of conversations
< between LEA members and fire department personnel constitut-m ing these other " responses." You took the position that the ones given were " representative." I stated that Applicant
~
was entitled to all relevant information, not merely that which was " representative" in LEA's view. Nonetheless, you
_ declined to provide this information.
r
- 36. In response to my suggestion that LEA's answer was nonresponsive because this interrogatory only asked for an
= analysis of the written plans, you agreed to provide an f
answer.
5 38. This contention seeks LEA's position as to specif-ic deficiencies in planning for the identified facilities.
r I noted that your answer makes general references to " con-F cerns" but did not specify deficiencies. You stated that r the plans have not identified or included transportation needs. While this provided some specificity, it still does not identify the specific resources which LEA asserts to be
[
necessary to evacuate those facilities. I ask that you provide a more specific answer.
- 42. With regard to towing, gasoline and snow removal F resources for non-State roads, you stated that LEA is still
[ looking at the plans, examining provisions as to parks, reviewing the PennDot study, and checking other items. You
{
=
stated that LEA may conduct a random survey of gas stations and towing services. You agreed to furnish this information f
=
when compiled, but made. no commitment as to the date of completion.
As to each of the interrogatories in which LEA stated,
" either in its answer or during our conversation, that g further information is being compiled or review of the plans E is incomplete, you agreed to supplement your answers. Given
= the number of contentions and areas of dispute, preparation
- g. of Applicant's case requires that such updates be received as soon as possible. Accordingly, I request that ycu furnish me with any supplements to your answers no later
. than August 31, 1984. A full month should be ample time for E LEA to complete whatever surveys or investigations it has undertaken. In this regard, you also agreed to furnish me h with supplements to each of your answers based upon LEA's I observations and evaluations in connection with the July 25, i 1984 planning exercise.
)
i 1
LJ EF --
Miss Maureen Mulligan
- August 1, 1984 Page 7 Document Production As I stated'during our conversation, I was surprised to receive only eight short documents attached to your answers in response to our request for production of documents, only two of which were generated by LEA itself. Given the number of LEA members involved and the range of issues and concerns it has raised, it is incredible that a far greater number of documents was not produced. Apparently, LEA did not follow the instructions in Applicant's interrogatories and requests for production of documents. Accordingly, I request that you undertake immediately to provide Applicant with all requested documents, including internal LEA memoranda, notes, or documents of whatever kind. As a practical matter, Applicant's discovery requests are broad enough to encompass any documents related to LEA's contentions.
Therefore, any document in LEA's possession that relates to emergency planning should be produced.
Apart from LEA's evident failure to produce requested documents, I was also surprised by your statement that there were " documents" from which LEA's answers were drafted, but which were thrown out once the answers were drafted. I advised you in response that such action was not permissible when discovery requests had been filed. I suggested that you immediately contact Mr. Elliott and discuss the matter with him. As the former LEA representative, Mrs. Zitzer should also be contacted to see what she knows about any destroyed or otherwise undisclosed documents.
Given the standing order of the Board that motions to compel must be filed within ten days of service of incom-plete answers, Applicant is required to seek relief regard-ing incomplete answers to its interrogatories and incomplete document production at this time. As a related matter, Applicant will ask the Licensing Board for the following relief concerning the protection of relevant documents:
- 1. All such " documents" as requested by Applicant in connection with its various interrogatories and document request shall be compiled and furnished to Applicant or produced for inspection and copying within ten days.
- 2. LEA shall conduct a survey of each of its members or former members with knowledge of these matters, including any representative (e.g., Mrs. Zitzer or Mr. Elliott) or consultant, to determine whether
" documents" as so defined have been destroyed,
Mics MnurO2n Mulligen j August 1, 1984 Page 8 undisclosed or otherwise not produced. The survey shall state the name of each member surveyed, a description of the form and content of any such document which was destroyed or which the member knows to have been destroyed, and the date (ap-proximate) the document was destroyed.
- 3. LEA shall file an affidavit which attests to the results of the survey, including a statement that (a) a good faith effort has been made to recover and produce copies of all available documents requested by Applicant, and (b) a good faith effort has been made to specify to the fullest extent possible the content of any documents which have been destroyed.
- 4. Under no circumstances shall any " document" as defined in Applicant's interrogatories be de-stroyed (meaning physically obliterated, discarded or rendered unavailable for any other reason) .
I look forward to hearing from you on these matters.
Sincerely, Robert M. Iader Counsel for the Applicant RMR/dlf cc: Service List l
l L