Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] |
Text
i 1 Rif4CIPAL STAFF y
g*A 4A> dNF l '
res eg 43 5/aA_
\tRA <
.m STONE & WEBSTER MICHIGAN, INC. GD bGI r ici I (R 1 I
P.O. Box 2325 BOSTON. M ASSACHUSETTS O2107 55_ l !
. s l I l i
!q_ L I (R ' t 4 04 Mr. J. G. Keppler March 15, 1983 Administrator, Region III J.O. No. 14358 U. S. Nuclear Regulatory Commission MPS- 12 799 Roosevelt Road Glen Ellyn, IL 60137 Re: DOCKET NO. 50-329-330 MIDLAND PLANT - UNITS 1 AND 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING AFFIDAVITS AND RESUMES FOR ADDITIONAL TEAM MEMBERS With the extension of the duration of the independent assessment of the underpinning work at the Midland Plant, Stone & Webster feels that it may be necessary to supplement the existing assessment team. In this regard, affidavits and resumds for additional team members that may become involved in the assessment are enclosed with this letter:
?. J. Majeski - Geotechnical Engineer R. J. Henry - Construction R. J. Beaudet - Quality Assurance Stone & Webster has determined that these individuals meet the in-dependence requirements for this work.
If you have any questions, please contact me at (617) 589-2067.
A. S. Lucks Project Manager ASL:PJC MAR 161983 8303220169 830315 PDR ADOCK 05000329 A PDR h m
. _ . .-- . _._ ~ - - - - _ - - -_. -
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 ON CONSUMERS POWER COMPANY . 50-330 OM (Midland Plane., Units 1 and 2 Docket No. 50-329 OL 50-330 OL I
February 14, 1983 AFFIDAVIT OF , ,
My name is P.J. Majeski . I an employed by Stone & Webster Engineering l
Corporation as Senior Geotechnical Encineer.
I am currently assigned to the team which is conducting an independent l assessment of soils work at the Midland Nuclear Plant site. Prior to being 1 given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company, Bechtel, or the Mergentime Company relating to soils of underpinning. i I have never been employed by Consumers Power Company, Bechtel, or Mergentime l Company. I do not own any shares of Consumers Power Company, Bechtel, or Mergentime stock. Mutual funds or other funds in which I may have a 4
beneficial' interest, but over which I have no control, may own shares of Consumers Power Company, Bechtel, or Mergentime stock, of which I am unaware.
I have no A list of such funds in which I have an interest are attached.
relatives which are or have been employed by Consumers Power Company, Bechtel, or Mergentime Company.
Arth Sworn and Subscribed Before Me This 14th Day of February 1983
- VHL w A& CZ Notary Public Suffolk County, Massachusetts My Commission Expires November 8, 1985
/
1
- - - - . , - - , - -,,.-,.,---,.--.v--- , , - - - -.v.- ,m-- - , - , , , - ,.-----..,.c, - , , - - - w - , , , , - , . , - - - . ,,
- _ _ - - . - _ - . - . ~ _ _ . - . .-. - ._- . -__
- i. .
February 1983 MAJESKI, PETER J. SENIOR SOILS ENGINEER GEOTECHNICAL DIVISION EDUCATION Northeastern University - B.S. in Civil Engineering 1966 Northeastern University - M.S. in Civil Engineering 1970 Harvard University - Special Soil Mechanics Program for Practicing Engineers and Teachers 1968 Northeastern University - Additional Studies in Engineering Geology and Rock Mechanics 1973-1974 Northeastern University - Studies in Business Administration 1979-1981
)
Specialty Conferences - Lateral Stresses in the Ground, Performance of Earth 9
! and Earth-Supported Structures, 19th U.S. Symposium on Rock Mechanics, Ports
, Lecture Series - Engineering Geology and Groundwater, Deep Foundations, l Lateral Earth Pressure, and Welding LICENSES AND REGISTRATIONS Professional Engineer - Alaska, Indiana, Massachusetts i
1 EXPERIENCE
SUMMARY
Mr. Majeski, a Senior Soils Engineer, has 17 years of experience in geotech-nical engineering, including 12 years experience as Lead Geotechnical Engineer on 12 power projects in the United States. His primary areas of expertise are foundation design and construction, site preparation, water-front structures including bulkheads, cofferdams and offshore pipelir.cs ,
i shore and erosion protection, rock anchors, dewatering, and special testing.
As Lead Geotechnical Engineer, he has administrative and technical responsi-bilities for all geotechnical aspects of a project throughout the explora-tory, engineering, design, and construction phases. This includes cost and feasibility studies to support conceptual design, preparation of licensing documents, preparation of foundation reports, setting design criteria, and developing specifications and drawings.
I In addition to his experience in the power industry, Mr. Majeski has been involved in civil, structural, and foundation engineering for highways, waterworks, sanitation facilities, airfields, port facilities, and urban redevelopment.
PROFESSIONAL AFFILIATIONS Boston Society of Civil Engineers Section/American Society of Civil Engi-neering - Member
! Geotechnical Group Forum Committee - Member 1972-1974, 1977-1979 Waterways, Port, Coastal and Ocean Group - Vice Chairman 1982-1983 l
7SW50-2655 1 i
l
+
, PJM American Society of Civil Engineers - Member Geote-hnical Engineering Division - Improvement and Placement of Soils - Committee Member, 1982-1983 Energy Division - Energy Resources Management - Committee Control Group Member, 1982-1983 PUBLICATIONS Rock Anchor Support of Marine Bulkhead - Senior Author with P. K. Taylor and J. A. DiVito. Presented at ASCE Convention and Exposition, Boston, 1979 i
i I
l l
1
(
7SW50-2655 2
DETAILED EXPERIENCE REC 0dD MAJESKI, PETER J. 55838 STONE & WEBSTER ENGINEERING CORPORATION, BOSTON, MA (Apr 1971 to Present)
Appointments:
Senior Soils Engineer - Mar 1975 ,
Soils Engineer - Apr 1973 Engineer (Soils) - Apr 1971 ,
- Solar Repowerina, Newman Station, El Paso Electric Company (Oct 1982 to Present) l As LEAD GEOTECHNICAL ENGINEER, was responsible for determination and implementation of all phases of the geotechnical investigations and analyses j for preliminary design of the heliostat and central receiver foundations.
] The scope ian:luded development of the field exploratory and laboratory
! testing programs, analysis and design of foundations and preparation of a i geotechnical report.
4 Rio Penstock Replacement, Orange and Rockland Utilities, Inc.
(J.uly 1982-Nov 1982)
Developed the subsurf ace exploratory program, directed foundation analysis, ,
and prepared foundation design criteria for replacement of an above ground penstock in a potential landslide area. This work included an analysis of j an existing earth dam which has excessive hydrostatic pressures in the underlying rock foundation. This work also involved preparation of contract documents for the penstock replacement which included installation of the instrumentation for monitoring an existing slope for future movement.
- Patriot Generating Station, Indianapolis Power and Light Company (Aug 1976 to Present)
As LEAD GE0 TECHNICAL ENGINEER, has been in responsible charge of the sub-surface investigations and analysis and foundation recommendations for the main powerhouse and adjacent structures.
This included preparation of a Geotechnical Report which presents the l
subsurface conditions and foundation recommendations.
Also is in responsible charge of the design of the waterfront cellular structures, pump house cofferdam and dewatering methods. Supervised pre-1 paration of a site evaluation for the proposed coal-fired power plant including preparation of a summary report. This evaluation included studies for siting and licensing of the power plant, coal unloading and handling facilities, cooling towers, and other auxiliary structures.
Other responsibilities included supervision of geotechnical studies for determination of groundwater parameters for use in studying the feasibility of obtaining cooling water makeup from the groundwater.
i 7SW50-2655 1
. PJM PFB Pilot Plant - Curtiss Wright Corporation (Mar 1976 to Present)
As LEAD GEOTECHNICAL ENGINEER, supervised the studies necessary for a foundation report for an experimental power plant project at the Curtiss-Wright facilities in Wood-Ridge, New Jersey.
In addition, has made anlyses, set design criteria, prepared contract documents, and monitored construction activities for the foundations of the plant and appurtenant structures.
Sears Island Station, Central Maine Power Company (July 1978-Feb 1980)
As LEAD GEOTECHNICAL ENGINEER, involved in the planning of the geotechnical effort to support site layout, licensing, and design of a large coal-fired power plant near Searsport, Maine.
Ethylene Complex No. 1 - Libya, Azzawiya Oil Refining Company, Inc.
(July 1978-Dec 1980)
Provided geotechnical services for conceptual and final design of founda-tions for power generation and desalination facilities. Work included the study of cofferdams and dewatering schemes for a large desilting basin founded in porous limestone. Schemes involving cutoff walls and grout curtains were investigated.
Fuel Unloading Facilities - Salem Harbor Station (Apr 1976-June 1979)
Supervised the analysis, design, and' preparation of contract documents for a sheet pile bulkhead with rock anchor support at Salem Harbor Station. Also served in a consulting capacity during construction. This project involved replacement of deteriorated structures, including the docking facilities, while maintaining the existing fuel unloading facilities.
Add-On Facility - Gas Diffusion Plant, Energy Research and Development Administration (Aug 1976-Apr 1977)
As LEAD GE0 TECHNICAL ENGINEER, responsible for coordination of design of five large electrical switchyards near Portsmouth, Ohio. l River Bend Power Station, Gulf States Utilities Company (Apr 1976-Feb 1977)
As SPECIALIST for site preparation, had responsibility for the technical aspects of specifications for site preparation including placement of fill for support of structures.
Shoreham Nuclear Power Station, Long Island Lighting Company (Apr 1976-Sept 1976)
As SPECIALIST for installation of offshore pipelines, reviewed the design, specification preparation, and installation of the discharge pipe and diffuser system projecting approximately 1 mile offshore into Long Island Sound.
7SW50-2655 2
PJM Charlestown, Rhode Island - Units 1 and 2, New England Power Company (Feb 1974-May 1976)
As LEAD GEOTECHNICAL ENGINEER, supervised geotechnical data acquisition and analysis necessary for preparation of the Preliminary Safety Analysis Report and the Environmental Report. The studies for these reports included liquefaction analysis, slope stability analysis under dyntmic loading, 8roundwater analysis, measurement of the elastic properties of soil and rock, and geologic research investigations.
Was also involved with plant siting and conceptual design of the circulating water system and site layout.
Associated with the project was the preliminary evaluation and report for four alternate sites.
Canal Plant - Unit 2, NEGEA Service Corporation (Nov 1971-Jan 1976)
As LEAD GEOTECHNICAL ENGINEER, in responsible charge of all geotechnical work for design and construction of the second unit at this site.
Work included settlement analysis of powerhouse, preparation of Soils Report, and specifications for the excavation of unsuitable soils and replacement with compacted fill. Set foundation design criteria for the powerhouse, temporary and permanent braced sheet pile structures, fuel storage tanks, and other structures. Worked in cooperation with construction forces to ensure quality control during the performance of the work. A portion of this work included setting design criteria and preparing specifications for a large diameter concrete pipeline and diffuser to be installed underwater.
Newman Power Station - Unit 4, El Paso Electric Company (June 1973-Aug 1975)
As LEAD GEOTECHNICAL ENGINEER, prepared scope of exploratory program, analyzed data, and made foundation recomendations for all structures.
Supervised preparation of specifications for excavation of unsuitable soils and backiill with compacted fill for several structures on site. In addi-tion, supervised preparation of other site-related specifications, prepara-tion of the Soils Report, and design of two lined wastewater ponds.
Presque Isle Station - Units 5 and 6, Upper Peninsula Generating Company (Sept 1971-Aug 1975)
As LEAD GEOTECHNICAL ENGINEER, during design and construction, reviewed earthwork specifications and provided assistance in the design of various structures including powerhouse, reclaim pit, and screenwells. Set design criteria and assisted in preparing drawings and specifications for the
- circulating water intake and discharge pipelines and related work. The
! pipelines are large diameter, filament-wound fiberglass installed in Lake Superior.
j 7SW50-2655 3
PJM Lockhart Site - Unit 1, El Paso Electric Company (Apr 1972-July 1973)
As LEAD GE0 TECHNICAL ENGINEER, prepared exploratory programs and speci-fications, wrote preliminary soils and foundation report. Prepared speci-fication for an aerial topographic survey of the site.
Tracy Power Station - Unit 3, Sierra Pacific Power Company (Apr 1971-Mar 1973)
As LEAD GE0 TECHNICAL ENGINEER, in responsible charge of all foundation engineering.
Prepared program and supervised foundation investigations and made feasi-bility, ease of construction, and cost studies for various structures required on site. Set foundation design criteria, prepared Soils Report, wrote portions of earthwork specifications, and provided assistance, as necessary, during construction. Supervised the preparation of drawings and specifications for a 4-acre, lind evaporative waste pond.
Surry Power Station - Units 3 and 4, Virginia Electric and Power Company (Oct 1972-Dec 1972)
Assisted the Lead Geotechnical Engineer during acquisition of field data for Units 3 and 4. Duties included implementation of the exploratory program and reduction and analysis of data leading to foundation recommendations and preparation of the Preliminary Safety Analysis Report.
North Anna Power Station - Unit 3, Virginia Electric and Power Company (Nov 1972)
~
~ Assisted Lead Geotechnical Engineer by making preliminary settlement analyses of various tank structures.
Assisted in setting procedures for the installation of earth pressure cells for measurement of lateral pressures on the Unit 3 containment.
l l FAY, SP0FFORD & THORNDIKE, INC., BOSTON, MA (Dec 1968-Apr 1971)
Soils Engineer i
j Assignments as the only permanent Soil Engineer varied, frequently involving j engineering and design in civil engineering fields other than the soil
- mechanics and foundations. This work included structural and hydraulic design, site layout, and grading and design of slope protection.
Responsible for the seepage and foundation studies for a small suburban reservoir comprised of approximately 6,000 f t of dike of varying heights up '
l to approximately 20 ft. Duties included coordination of the various aspects of the project and preparation of the earthwork specifications.
l 7SW50-2655 4
M PJM Engaged in making seepage studies and recommendations regarding infiltration .
rate from sewage lagoons.
Work in highway engineering included numerous bridges and walls underlain by varied soil conditions including peat, rubbish fill, and clay. Studies and recommendations were made regarding preloading for construction of highway embankments over soft soils.
i Designed various waterfront structures including cellular and sheet pile bulkheads. This work included design of a 600 ft cellular bulkhead for use as a wharf at Ogdensburg, New York.
HALEY & ALDRICH, INC., CAMBRIDGE, MA (May 1967-Dec 1968) i As ASSISTANT S0ILS ENGINEER, assignments included design and economic studies, reports, and field work for shopping centers, waterfront struc-tures, and building towers.
Other duties included construction supervision of pile installations and spread footing foundations on sensitive soils and data and soil sample acquisition on special exploratory projects.
Prior to receiving a B.S. Degree, worked part time with this firm as a Soil Technician performing laboratory and field tests, inspection of borings, test pits, Gow caisons, compacted fill placement, and piling.
, C.A. PICKERING ASSOCIATES, WEST BRIDGEWATER, MA (May 1966-May 1967)
As JUNIOR CIVII. ENGINEER, designed sewer and storm drain systems, along with various structural components and foundations. Supervised a number of pile load tests for the NASA site in Cambridge, Massachusetts, and other sites in the Boston area.
i f
l 1
7SW50-2655 5
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY . 50-330 OM (Midland Plant, Units 1 and 2 Docket No. 50-329 OL 50-330 OL February 14, 1983 4
AFFIDAVIT OF [ ,4 & J My name is R. J. Henrv . I am employed by Stone & Webster Engineering Corporation as Asst. Superintendent .
I am currently assigned to the team which is conducting an independent assessment of soils work Lt the Midland Nuclear Plant site. Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company, Bechtel, or the Mergentime Company relating to soils of underpinning.
I have never been employed by Consumers Power Company, Bechtel, or Mergentime Company. I do not own any shares of Consumers Power Company, Bechtel, or Mergentime stock. Mutual funds or other funds in which I may have a beneficial interest, but over which I have no control, may own shares of Consumers Power Company, Bechtel, or Mergentime stock, of which I am unaware.
A list of such funds in which I have an interest are attached. I have no relatives which are or have been employed by Consumers Power Company, Bechtel, or Mergentime Company.
MAcce .
Sworn and Subscribed Before Me This 14th Day of Pabruary 1983 l
~0in u / b t <A t Y
. Notary Public l / lbLli Anoch, ///jb n ~-
l /-
I My Commission Expires /g/1 <'N3 l
/
l
~ ~ ~ ' -- - - . . . .
_________________g
I ROBERT J. HENRY ASSISTANT SUPERINTENDENT 0F CONSTRUCTION
)
EDUCATION I
j Marietta College - B.S. Geology l LICENSES A';D REGISTRATIONS California - Registered Professional Geologist Registered Professional Engineering Geologist .
EXPERIENCE
SUMMARY
Mr. Henry has over 20 years experience in heavy construction including dam and earthwork, nuclear power plant and process construc-tion. Since joining SWEC in 1969, Mr. Henry has steadily progressed from Construction Engineer to his present assignment as Assistant Superintendent of Construction on a 100 MM/CPY Methanol project for Getty Refining & Marketing Company in Delaware, where he is responsible for all construction activities for the installation of this plant.
Before this, he was assigned to a large nuclear power plant at St. Francisville, Louisiana. In this capacity, he is in direct charge of the offsites area including waterfront work.
Prior to this, Mr. Henry was assigned as Senior Construction ~
Supervisor, then Assistant Superintendent of Construction for a large j ethylene plant at Port A"thur, Texas. On this assignment Mr. Henry was initially in charge of all construction planning work. He h finished the project in charge of all construction equipment and services.
Earlier, Mr. Henry was assigned as Construction Engineer, q
then Construction Supervisor on the construction of a large nuclear 1 power plant at North Anna, Virginia. In these capacities, Mr. Henry lf was responsible for carthwork, excavation and backfill operations. He ll was further responsible for the scheduling and management of construction equipment.
l.
' Before joining SWEC, Mr. Henry held positions with the U.S.
l!
- Army Corp. of Engineers and the Virginia Department of Highways l engaged in earthwork and dam construction.
l l
t l
.._.______.)
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY . 50-330 OM (Midland Plant, Units 1 and 2 Docket No. 50-329 OL 50-330 OL February 14, 1983 AFFIDAVITOF) b .
// 7~~
My name is Roland J Seaudet I an employed by Stone & Webster Engineering Corporation as Jr. ,
Uniet QC Insp Supervisor I am currently assigned to the team which is conducting an independent assessment of soils work at the Midland Nuclear Plant site. Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company, Bechtel, or the Mergentime Company relating to soils of underpinning.
I have never been employed by Consumers Power Company, Bechtel, or Mergentime Company. I do not own any shares of Consumers Power Company, Bechtel, or Mergentime stock. Mutual funds or other funds in which I may have a beneficial interest, but over which I have no control, may own shares of Consumers Power Company, Bechtel, or Mergentime stock, of which I am unaware.
I have no A list of such funds in which I have an interest are attached.
relatives which are or have been employed by Consumers Power Company, Bechtel, or Mergentime Company.
Mans Swo nd Subscribed Before Me This 14th Day of E1_ __g 83
-% iN Notpry Public f' Neh fe/winnn bui >i o ne My Commission Expires 40 e<t/S
[
BEAUDET, JR. ROLAND J. JANUARY 1983 April 12, 1939 FIELD QUALITY CONTROL Married - Four Children EDUCATION Chicopee High School, Chicopee, Mass.
Apprentice Ship - Boilermaker, Graduate Norfolk Naval Shipyard, Portsmouth, Virginia REGISTRATIONS None TECHNICAL SOCIETIES None PATENTS None LANGUAGES None EXPERIENCE
SUMMARY
Mr. Beaudet joined Stone & Webster Engineering, River Bend Power Station, St. Francisville, Louisiana in January 1980 as a QC Engineer on loan to Graver, subcontractor, to perform surveillance inspections of Welding, NDE, Document Control, QA Manual and Specification requirements. In April 1980 he supervised radiography, interpreting radiographic film, providing assistance in Pipe Installation, Welding Inspections, Documentation review and other Quality related activities. Since January 1981 Mr. Beaudet has been supervising the installation and testing of the HAVAC System, performing surveillance inspections of Graver activities including reviewing all RT film
- and providing technical assistance in the structural welding section.
- Prior to River Bend Power Station Mr. Beaudet has been with Stone & Webster i
Engineering as a QC Engineer.at the Nine Mile #2 Plant, J.A. Fitzpatrick, Shoreham and Surry Power Station in Piping, Welding, and NDE.
Prior to joining Stone & Webster Engineering Corporation, he was a Metal Lab Inspector performing non-destructibe examinations on lluclear Submarine l Piping Systems. He also has had experience as a boiler inspector including repairs, hydrotest, tube replacement, and generator repairs. Prior to his nuclear experience, Mr. Beaudet was employed as a boilermaker for six years.
i
- _ f