Forwards Estimate of Cost of Const Delay for Facility,In Response to NRC 810325 Request
ML20003E781
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/03/1981
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
W3P81-1030, NUDOCS 8104100512
Download: ML20003E781 (3)


Text

.O o

142 DELARoNoE STREET P O W E R, & L 1 G H T! P o Box 6000 e NEW ORLEANS. LoulSIANA 70174 . (So41 366-2345 MioOLE south UTsuTiES SYSTEM Q L AswELL vce preo.asnt pmeer Prusucuan April 3, 1981 W3P81-1030 3-A1.10 Mr. R. L. Tedesco, Assistant Director for Licensing Division of Licensing U U. S. Nuclear Regulatory Commission ,,f, g Washington, D. C. 20555 4 t

,s

SUBJECT:

Waterford 3 SES g Docket No. 50-38'2 ,]

Estimate Of Cost Of Delay p; pQ 3 ggy j (}g

REFERENCE:

NRC (R. L. Tedesco) letter to Mr. D. L. Aswell *** ,

dated March 25, 1981 \g ID '

Dear Mr. Tedesco:

As requested in the above reference letter, LP&L's estimate of the cost of delay for Waterford 3 is attached.

The estimate of the cost of replacement energy is based on our most recent fuel forecast for the year of 1983 considering a 3 month delay beyond our scheduled commercial operation date.

l The estimate of the capital expense is based on maintaining the plant in a completed condition for a period of 3 months beyond our current projected fuel load date and includes contractor's cost, LP&L's cost and AFUDC.

It should be recognized that the cost effects of such a delay can be signifi-cant once the participants in the project know that the completion requirement date has been extended. Moment.um of the work force is lost and the possibility exist that the project can be further delayed beyond the completion date due to the work forces loss of impetus to finish the project. Further, when the project is delayed there is an additional expecure to later regulatory require-ments which can further extend the project completion. These factors are alcost impossible to quantify and therefore are not included in the capital expense estimate, fo0I s i

8104100 m

.- . ,. _.- -. _ = __.-. - -. . _- - - . - . . - . . ---_ . . - . -.-- . .. .. -- ._. . ---

I 1

I J.

Mr. R.' L. Tedesco

! W3P81-1030 Page 2 4

4 4

6 j Yours very truly, 3 D. L.-Aswell -

i

(

DLA/FJD/dde t

t

i. Attachment 1

1 cc E. L. Blake

. W. M. Stevenson

  • i l

I 1 ,

. i P

h 4

5' f

f i

i.

i t i e

1 6

-W-9 44 y} yr W t'PFN4' W ^w 'OT]--M %M 4W 4ta + p-W F Tidy P t-r18WW--'1**PytPM 3yNev *W-M 94NW WeePN P

  • 3m -

~

April 27, 1981 s-f COST OF REPLACEMENT ENERCY AND CAPITAL EXPENSE INCURRED DUE TO LICENSING' DELAYS FOR WATERFORD 3 COST OF REPLACEMENT ENERGY Average Esti- Total Replace-Cost of Incre- mated Replace- ment Replace- Nuclear mental Length ment Energy REPLACEMENT FUEL ment Fuel Fuel Of Energy Cost Per HIX % Fuel Cost Cost Delay Cost Month IMe COAL OIL GAS Mills /kwh Mills /kwh Mills /kwh Months $1 x 106 $1 x 10 6 1104 100 68.1 8.9 59.2 3 82.1 27.4 CAPITAL EXPENSE i

1 Estimated Capital Capital Expense Capital Cost During Expense Of Unit At Delay Per Completion Period Month

$1 x 106 $1 x 106 $1 x 106 1492 45.75 15.25