Confirms 801202 Telcon Commitment to Oct 1982 Fuel Load Date
ML19351E580
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/05/1980
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
3-J1, W3P80-0300, W3P80-300, NUDOCS 8012100473
Download: ML19351E580 (1)


Text

fA LO POWERUISI& LIGHT AN A[ p a242sox 6008sraetr ceLAnaNce . NEW OnLEANS. . LOUISIANA (504) 366-2345 70174

  • U' UliuEIbSYSiE o L AswELL December 5, 1980 y,c pm ntso. , % t n W3P80-0300 3-J1 3-A1.01.04 h!r. Albert Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Cor:=tission Washington, D. C. 20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 Fuel Load Date

REFERENCE:

Letter LPL 14745 from D. L. Aswell to A. Schwencer (Constraction Completion Extension), dated August 6, 1980

Dear Mr. Schwencer:

Per the December 2, 1980 telephone conversation between Roy Prados and Bill Kane, this letter re-confirms October, 1982 as the Waterford 3 fuel load date.

As indicated in the above reference, Waterford 3 construction completion is in advance of October, 1982; therefore, it is imperative that the October, 1982 fuel load date not slip.

Yours very truly, D. L. Aswell DLA/RWP/dde cc: W. M. Stevenson E. Blake 3oo/