Responds to Generic Ltr 81-04 Re Emergency Procedures & Training for Blackout Events.Delay Requested Until 820115 for Completion of Required Programs
ML19343D581
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/29/1981
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
W3P81-0714, W3P81-714, NUDOCS 8105050375
Download: ML19343D581 (2)


Text

-

jb081

~

I~ LOUISIANA 2.a a nanoNoE srnEEr o so m P O W E R & L i G H T! P O BOX 6000

  • (504) 366-2345 70174 UTIUTIES SYSTEM April 29, 1981 W3P81-0714 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation e Nuclear Regulatory Commission \ \p Washington, D.C. 20555 U 9

SUBJECT:

Emergency Procedures and Training j for Station Blackout Events (NRC Generic Letter 81-04) fy l,l/iY01 m .b

; g u.s, ,, .g WA co

REFERENCE:

NRC letter dated February 25, 1981 w,33@ross[sj to all Licensees of Operating Nuclear (3b. d&j Plants and Applicants for Operating Licenses J[

In order to adequately address the Waterford 3 capability of mitigating a station blackout event from both the procedural and training aspects it would be necessary for our training programs to be developed based upon approved station off-normal and emergency procedures.

Based upon our present fuel load schedule of October, 1982, it is not expected that the required procedures and therefore the subsequent train-ing programs will be completed within the required time frame of the referenced letter.

We, therefore, request a delay in completion from the stated six months to January 15, 1982. This will enable our staff to adequately address all of the necessary emergency procedures related to station' blackout events and to subsequently develop the necessary training programs.

Our planned facility procedures and training programs which will be developed or revised to cover this event will include but tot be limited to the following topics:

- Loss of AC Power

- Loss of Offsite Power

- Emergency Diesel Generator

- Normal and Emergency Lighting g i V9+i 1

'810 5 0 3 '.. Fl 5  !

F l l

./

er Mr. D.G. Eisenhut i Page 2 April 29, 1981

- Reactor Coolant Pump Operation

- Cold License Training

- Replacement Training

- Requalification Training The above items will be completed and available for review by January 15, 1982, and will address all actions as requested by the referenced letter.

Very truly yours, L.V. Mhurin Assistant Vice President Nuclear Operations LVM/WRN/pc cc: Messrs. E. Blake W.M. Stevenson O