Informs of Delay in Phase 2 Inaccessible Piping Evaluation Rept, Due to Consultant Work Load & Increased Scope of Reanalysis Required.Rept to Be Submitted by 800515
ML19323E583
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/05/1980
From: Gilberts D
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-14, NUDOCS 8005270011
Download: ML19323E583 (1)


Text

WC NSp

~

NORTHERN STATES POWER COMPANY M I N N E A PO L.l s. M I N N E B OTA 55409 May 5, 1980 Mr. James G. Keppler Director - Region III Office of Inspection & Enforcement United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 IE Bulletin 79-14 Schedule foF feporting Phase 2

~

Inaccessible Piping Inspection Results Ke: Letter from L. J. Wachter (NSP) to J. G. Keppler (NRC) dated October 30, 1979.

In the above referenced letter we stated that the Phase 2 Inaccessible Piping Evaluation Report would be issued within 30 days fol' awing comple-tion of our refueling outage. Due to the work load of our consultant, NUTECH, INC., and the increased scope of the reanalysis required, the Phase 2 Inaccessible Piping Evaluation Report cannot be completed within the intended time frame. No operability concerns have been identified to date. The Phase 2 Inaccessible Piping Evaluation Report will be issued by May 15, 1980.

Yours very truly, D. E. Gilberts Vice President -