Submits Interim Rept Re Status of Significant Const Deficiencies 6 & 10 Concerning Emergency Diesel Generator Shafts & Springs & Emergency Generator Roller Pin, Respectively.Final Rept Will Be Submitted by 791101
ML19253A927
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7909120503
Download: ML19253A927 (2)


Text

.

- - -f '

l OUISIANA E====mi P Q W E A & Li G H T! *242 C. SCx:suncNce s:nesr BCC8

  • NEW CALEANS. LOUIS!ANA 7C174
  • dC4) 356-2345 WecLE 3CUTH urtres systaa August 31, 1979 ,,a
. =, sm.%e =,uw LPL 11903 Q-3-A35.07.06 Q-3-A35.07.10 3-A1.01.04 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plara Drive, Suita 1000 Arlington, Texas 76012 SU3 JECT: Waterford SES Unit 3 Docket No. 50-382 Status of Significant Construction Deficiencies No. 6 " Emergency Diesel Generators - Defective Shafts and Springs" No. 10 " Defective Emergency Generator Roller Pin"

REFERENCE:

a) L?&L Letter, LPL 10343 dated December 29, 1978 b) L?&L Letter LPL 10233 dated December 5, 1978 -

as amended by LPL 10316 dated December 19, 1978

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(eT , LP&L has previously submi:ted interim reports of the two Significant Construction Deficiencies concerning the emergency diesel generators. Based on communications with Cooper-Bessemer, the

=anufacturer of the diesel generators, L?&L reported in the referenced letters that modifications correcting the deficiencies were scheduled to be completed and final reports submitted by August 31, 1979.

Cooper-Sessemer has acw informed us that the last of the modification assemblies are now planned for shipment from the fac:ory by September 7, 1979. This delay by Cooper-Bessemer does not adversely impact Waterford 3 censtruction needs and is acceptable.

Based on the above, we will now submit final reports for Significant Construction Deficiency No. 6 and No. 10 by November 1, 1979.

Yours very truly, J

^

D. L. Aswell DLA :!?G : sed r>- . rw e \E OtgUka.;O 9Q

(

7909120 90 3 f

, el

tr. K. V. Seyfrit 2 August 31, 1979 .

cc: /)1 Director Of fice of Inspection and Enforcement U. S. :Iuclear Regulatorv Commission Washington, D. C. 20535

2) Director Office of Management Infor:ation and Program Control U. S. :Tuclear Regulatory Cocsission 9ashington, D. C. 20555 O

b * $

O t.' O r; .,,s.J,

.