July 23, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd Juno Beach, FL 33408
SUBJECT:
TURKEY POINT NUCLEAR GENERATING UNITS 3 AND 4 - REPORT FOR THE OPERATING EXPERIENCE REVIEW AUDIT REGARDING THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW (EPID NO. L-2018-RNW-0002)
Dear Mr. Nazar:
By letter dated January 30, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18037A812) and supplemented through Revision 1 dated April 10, 2018 (ADAMS Accession No. ML18113A132), Florida Power & Light Company (FPL or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for subsequent license renewal of Operating License Nos. DPR-31 and DPR-41 for the Turkey Point Nuclear Generating Units 3 and 4 (Turkey Point), respectively. The staff of the U.S.
Nuclear Regulatory Commission (NRC) completed its operating experience review audit at the EXCEL Services Corporation offices in Rockville, Maryland, from May 7 through May 18, 2018, in accordance with the operating experience review audit plan (ADAMS Accession No. ML18086A705). I have enclosed the audit report.
If you have any questions, please contact me by telephone at 301-415-3306 or by e-mail at Lois.James@nrc.gov.
Sincerely,
/RA Lois M. James, Senior Project Manager License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Audit Report cc w/encl: Listserv
- concurred by email OFFICE PM:MRPB:DMLR LA:MRPB:DMLR PM:MRPB:DMLR BC:MRPB:DLR NAME LJames YEdmonds BRogers*
EOesterle*
DATE 07/19/2018 07/19/2018 07/23/2018 07/09/2018 OFFICE PM:MRPB:DMLR NAME LJames DATE 07/23/2018
Enclosure Audit Report Operating Experience Review Audit Regarding the Turkey Point Nuclear Generating Units 3 and 4, Subsequent License Renewal Application May 7-18, 2018 Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION, DIVISION OF LICENSE RENEWAL Docket Nos:
50-250 and 50-251 License No:
Florida Power & Light Company Facility:
Turkey Point Nuclear Generating Units 3 and 4 Location:
Rockville, Maryland Dates:
May 7-18, 2018 Reviewers:
L. James, Senior Project Manager, Division of Materials and License Renewal (DMLR)
B. Rogers, Senior Reactor Engineer, DMLR B. Allik, Materials Engineer, DMLR R. Beaton, Reactor Systems Engineer, Division of Safety Systems (DSS)
T. Brimfield, Reactor Systems Engineer, DSS A. Buford, Structural Engineer, Division of Engineering (DE)
A. Chereskin, Chemical Engineer, DMLR S. Cuadrado de Jesus, Structural Engineer, DE C. Fairbanks, Senior Materials Engineer, DMLR B. Fu, Materials Engineer, DMLR W. Gardner, Physical Scientist, DMLR J. Gavula, Mechanical Engineer, DMLR D. Hoang, Structural Engineer, DE K. Hoffman, Materials Engineer, DMLR W. Holston, Senior Mechanical Engineer, DMLR A. Huynh, Materials Engineer, DMLR N. Iqbal, Fire Protection Engineer, Division of Risk Assessment A. Johnson, Materials Engineer, DMLR R. Kalikian, Materials Engineer, DMLR B. Lehman, Structural Engineer, DE J. Lopez, Structural Engineer, DE D. Nguyen, Electrical Engineer, DE A. Prinaris, Structural Engineer, DE A. Rezai, Materials Engineer, DMLR F. Sacko, Electrical Engineer, DE M. Sadollah, Electrical Engineer, DE C. Sydnor, Materials Engineer, DMLR G. Thomas, Senior Structural Engineer, DE J. Tsao, Senior Materials Engineer, DMLR O. Yee, Materials Engineer, DMLR M. Yoder, Senior Chemical Engineer, DMLR Approved By:
David Alley, Chief Vessels & Internals Branch Division of Materials and License Renewal Steve Bloom, Chief Chemical, Corrosion, & Steam Generator Branch Division of Materials and License Renewal Eric Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal Steve Ruffin, Chief Piping & Head Penetration Branch Division of Materials and License Renewal Tania Martinez-Navedo, Chief Electrical Engineering, New Reactors, & License Renewal Branch Division of Engineering Brian Wittick, Chief Structural Engineering Branch Division of Engineering Report for the Operating Experience Review Audit Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application
- 1. Introduction The U.S. Nuclear Regulatory Commission (NRC or the staff) conducted an audit of Florida Power & Light Companys (FPLs or the applicants) plant-specific operating experience (OpE) related to the Turkey Point Nuclear Generating Units 3 and 4 (Turkey Point), as part of the staffs review of the Turkey Point subsequent license renewal application (SLRA) at the EXCEL Services Corporation located in Rockville, Maryland, from May 7-18, 2018. The purpose of the audit was for the NRC staff to perform an independent review of plant specific OpE to identify examples of age related degradation, as documented in the applicants corrective action program database. The regulatory bases for the audit was Title 10 of the Code of Federal Regulations, Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, (10 CFR Part 54). The staff also considered the guidance contained in NUREG-2192, Rev. 0, Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (SRP-SLR), dated July 2017, and NUREG-2191, Rev. 0, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, dated July 2017.
The identified OpE examples will be further evaluated during the staffs subsequent technical review and auditing of aging management programs (AMPs), time limited aging analyses (TLAAs) and aging management review (AMR) line items. The staffs identification and evaluation of pertinent OpE and additional related documentation, provides a basis for the staffs conclusions on the ability of the applicants proposed AMPs and TLAAs to manage the effects of aging in the period of extended operation.
- 2. Audit Activities The following sections discuss the areas reviewed by the staff and identified examples of pertinent OE.
SLRA AMP B.2.2.1, Fatigue Monitoring Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cycles, fatigue usage, cumulative usage and usage factor.
No significant plant specific operating experience associated with the AMP B.2.2.1, Fatigue Monitoring Program was noted by the staff during its review.
SLRA AMP B.2.2.3, Concrete Containment Unbonded Tendon Prestress Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: tendon, buttonhead, dome, shim stack, and grease leakage.
The table below lists the documents that were reviewed by the staff and were found relevant to the LRA Section B.2.2.3 Concrete Containment Unbonded Tendon Prestress. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00445083 U3, Indications Noted - Containment Building Visual Inspections 09/22/2007 AR 00438310 High As-Found Lift Off Forces, Tendon 12V06 of U3 (Force> 70%
GUTS) 03/02/2007 AR 00482549 Unable to Achieve Liftoff on Tendon 56V20 of U4 01/26/2007 AR 01747712 Vertical Tendon ( 34V08) of U3, Unable to be Stressed to Overstress Force 03/22/2012 AR 01748216 Dome Tendon (1D12) of U3, Unable to be Stressed to Overstress Force 03/24/2012 AR 01751146 Horizontal Tendon (42H26) of U3, Unable to be Stressed to 80%
Overstress 04/02/2012 AR 01767036 U Containment - Vertical Tendon Gallery Degraded Concrete 05/14/2012 AR 02183748 Protruding Wire in U3 Tendon 12V01 (Bottom End) 02/03/2017 AR 02184466 U3 Loss of Tendon Grease Exceeds 10% of Volume 02/08/2017 AR 01679310 Leakage from Tendon Ends in U3/U4 Tendon Gallery 08/19/2011 AR 01959317 Unusual Stains - U3 NE Containment Building Tendon Caps 04/18/2014 AR 00437652 Misalignment of Shim Stack on Tendon 51H35 of U3 02/16/2007 AR 00437147 Buttonheads Missing from Tendon Number 13H31 of U3 01/30/2007 AR 02184350 U3, Grease Leakage from tendon End Caps 02/08/2017 AR 01786466 U3 Containment Tendon (Leaking Oil) 07/21/2012 AR 02196366 U4, Containment Inspection Excessive Grease Leakage 04/04/2017 SLRA AMP B.2.2.4, Environmental Qualification of Electric Equipment Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Environmental Qualification, EQ, EQ self-assessment, EQ audit, EQ inspection, Q list, EQ Reanalysis, and adverse localized environment.
The table below lists the documents that were reviewed by the staff and were found relevant to the Environmental Qualification of Electric Equipment. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02124359 During the performance of section 4.26 of EQ Inspection in procedure 0-GME-102.11, it was noted that steps 4.26.5, 4.26.6, and 4.26.10.C contain vague guidance and cannot be performed as written. The Table 1 referenced in the above steps as well as the inspections to be performed in step 4.26.5 are non-existent.
04/11/2016 AR 01951016 Engineering - Valve Team has inspected and recommends that: 1) the motor terminal block be replaced. 2) if needed to partially disassemble the limit switch to ensure the grease has been completely replaced, use steps in 0-GME-102.11, ( ACCELERATED MOV, INSPECTION, OVERHAUL AND EQ INSPECTION (SMB 0 THROUGH 3 AND SB-2/SB). 3) The remaining terminals and components should be cleaned per the original WO scope as stated in the 0-PME-102.07 PM procedure.
03/23/2014 AR 00460771 Performed a preventive maintenance inspection on MOV-3-350. As part of the EQ Inspection, the technicians reported two anomalies: (1)
Broken insulating (chipped) barriers on the power terminal block and (2)
A potentially degraded Raychem installation. The cause can be attributed to physical impact most likely during cover removal or installation.
01/20/2009 AR 00404809 Westinghouse identifies 8 issues/errors in their methodology to predict peak containment pressures during LOCA/Containment Response analyses. Of these 8 issues/errors, 4 apply to PTN with an overall predicted impact of +2.42 psi to the calculated peak pressure in the analysis of record. The Equipment Qualification and the double-ended hot leg (DEHL) break LOCA Containment Response analyses are not affected by these issues/errors.
09/25/2005 AR 00408222 Three EQ components lack adequate documentation in QA [quality assurance] records for material used to maintain qualified life.
Walkdowns and review of Passport provided evidence that parts replaced are qualified to maintain qualification.
12/19/2006 AR 00535577 It is possible to replace EQ components while substantial qualified life is still remaining. Procedures were changed to address inadequacies in the maintenance and planning process.
10/31/2005 AR 01840489 Changes to solenoid valves were provided on engineering change drawings, but details for cable scheme change and splice detail were not included. Recommended actions included providing detail information to ensure EQ qualification is maintained.
03/09/2013 SLRA AMP B.2.3.1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD Audit Activities. The staff conducted an independent search of the applicants operating experience database using the keywords: cracking, leak, wear, loss of material, failure, degradation, flaw, inspection, repair, and weld.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document Title Revision / Date FPLCORP020-REPT-072 Aging Management Program Basis Document - ASME Section XI Inservice Inspection, Subsections IWB, IWC and IWD Rev. 1 01/05/2018 NDE 4.5 Non-Destructive Examination Procedure Rev. 4 03/28/2008 ENG/CSI-NDE 037 Strategic Plan for Stream Generator Integrity Rev. 2 02/2016 PTN-LR-02-0027 License Renewal Screening Results Summary Report 03/11/2002 FPLCORP020-REPT-120 Aging Management Program Basis Document - Operating Experience (OE [OpE]) Program Report Rev. 0 FPLCORP120-REPT-028 Subsequent License Renewal Aging Management Review Reactor Vessel Rev. 0 FPLCORP020-REPT-032 Aging Management Program Basis Document - Reactor Coolant System and Connected Piping Rev. 1 AR 00459396 RPV head BMV lessons learned 03/26/2009 AR 00467808 License Renewal Self-Assessment.
07/21/2009 AR 00054958 Dry boric acid found 09/23/2004 AR 00453123 Dry boric acid found 04/12/2008 SLRA AMP B.2.3.2, Water Chemistry Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: amine, chloride, conc, conductivity, dissolved oxygen, fluoride, H2, hydrazine, hydrogen water chemistry, lithium, mineral, noble, sulfate, and water chemistry.
The table below lists the documents that were reviewed by the staff and were found relevant to the Water Chemistry program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00406091 Chemistry Fundamental Practices Are Not Consistent 06/27/2008 AR 00449822 PTN Quality Report, QR [quality report] 08-005, Weakness 02/06/2008 AR 00485264 Evaluate The Human Performance and Programmatic Aspects 03/25/2009 AR 00523999 Notification for HU [human performance] Event 09/16/2009 AR 00577951 Loss of Hydrazine Feed to Both Unit 3 and Unit 4 09/06/2010 AR 01939916 3&4-ONOP-071.1 Condensate DO [dissolved oxygen]
2/10/2014 AR 02207771 Level 1 Assessment - 3T29 Start-Up Chemistry 5/30/2017 AR 02062755 Demineralizing and Maintaining Equipment Adequacy 7/26/2015 AR 02092680 RCS [reactor coolant system] Purification Return to Service 11/19/2015 SLRA AMP B.2.3.3, Reactor Head Closure Stud Bolting Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: bolt, bolting, closure stud, stress corrosion cracking, wear, and cracking.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document Title Revision / Date FPLCORP020-REPT-075 Aging Management Program Basis Document - Reactor Head Closure Stud Bolting Rev. 1 FPLCORP120-REPT-028 Subsequent License Renewal Aging Management Review Reactor Vessel Rev. 0 AR 00467808 License Renewal Self-Assessment 07/21/2009 Document Title Revision / Date FPLCORP020-REPT-120 Aging Management Program Basis Document - Operating Experience (OE) Program Report Rev. 0 0-GMM-043.17 Reactor Head Closure Stud Handling and Transport Rev. 6 AR 02121743 Reactor Head Stud Tensioning 03/31/2016 AR 00459733 Discrepancy occurred during Reactor Vessel Head stud tensioning 04/05/2009 AR 01846875 Tensioner would not disengage from Stud #31 02/10/2013 AR 01770520 Reactor Head Closure Studs #35 and #37 original threads damaged 05/25/2012 SLRA AMP B.2.3.4, Boric Acid Corrosion Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: BAC, boric acid, corrode, corros, drop, and leak.
The table below lists the documents that were reviewed by the staff and found relevant to the Boric Acid Corrosion program. These documents were identified during the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02039217 Repetitive Boric Acid Leakage Corrective Action 04/19/2015 AR 02024658 Ineffective Action / Recurrent Boric Acid at Threaded Connection 3-799E 02/11/2015 AR 02024547 Ineffective Action / Recurrent Boric Acid at FI-4-942 02/10/2015 AR 02024438 Ineffective Action / Recurrent Boric Acid at Threaded Connections PI 1595B 02/10/2015 AR 02024221 Ineffective Action / Recurrent Boric Acid at PI-4-957C-1 02/09/2015 AR 01752559 Boric Acid Leaking Past Gasket Is Causing Corrosion on Containment Spray Pump 04/05/2012 AR 00406332 2009-19932 Potential Through-Wall Leak on 8-Inch AC-151-RS 07/13/2009 AR 00406517 2010-2246 While Performing A Planned Walkdown for Boric Acid, Two Potential Through-Wall Leaks Identified in Toe of Weld on 4-Inch Spent Fuel Drain Piping 01/29/2010 SLRA AMP B.2.3.5, Cracking of Nickel-Alloy Components and Loss of Material Due to Boric Acid-Induced Corrosion in Reactor Coolant Pressure Boundary Components Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Nickel, Inconel, Alloy 600, Alloy 82/182, Dissimilar, PWSCC, SCC, Boric, Corrosion, BAC, BMI, Penetration, Nozzle, and Crack.
The table below lists the documents that were reviewed by the staff and were found relevant to AMP B.2.3.5 Cracking of Nickel-Alloy Components and Loss of Material Due to Boric Acid-Induced Corrosion in Reactor Coolant Pressure Boundary Components. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00460082 2009-10422-Bare Metal Visual Inspection of the Reactor Vessel The licensee identified dried boric acid residue, staining, and general corrosion on the outside surface of the reactor vessel (RV) bottom head during baseline bare metal VE visual examinations performed in accordance with ASME Code Case N-722-x as mandated by 10 CFR 50.55a(g)(6)(ii)(E). The root cause analysis suggested that the leakage occurred from the refueling cavity seal from above when the cavity was flooded during past refueling outages, and not from the bottom mounted nozzle (BMN) penetrations. The licensee confirmed by chemical analysis that the origin of boric acid was not from the BMN leakage. The corrosion analysis has confirmed that leaving boric acid residue and rust on the RV bottom head may cause negligible corrosion rate when the plant is at ambient temperature, and will not adversely affect the bottom head base metal integrity.
04/06/2009 AR 01742043 BMI Visual Reveals Staining & General Corrosion The licensee compared the results of the required bare metal VE visual examinations performed in 2012 to the results of the 2009 examinations, and found no changes to the conditions of the RV bottom head and no evidence of pressure boundary leakage from BMN.
03/07/2012 AR 2088999 PTN3 Results of Bottom Mounted Nozzle Examination The licensee identified 47 relevant indications (staining and discoloration) in the BMN. None of the indication was related to BMN leakage. The origin of discolored streaks on RV bottom head was determined to be from previous leakage on the cavity seal, sand boxes or NIS covers.
11/05/2015 AR 1994996 Boric Acid Identified at Closure Head Nozzle Penetration #59 The licensee identified boric acid around RV upper head penetration nozzle No. 59 while performing the bare metal VE visual examinations in accordance with ASME Code Case N-729-x as mandated by 10 CFR 50.55a(g)(6)(ii)(D). The root casue analysis found residue of boric acid trailing down the CRDM column around the annulus of nozzle and down the slope on the closure head. The licensee performed supplemental volumetric leak path assessment and found no evidence of pressure boundary leakage from the penetration nozzle.
09/30/2014 Document Title Revision / Date AR 02096392 Westinghouse Technical Bulletin (TB)-07-2 Rev 3, Reactor Vessel Head Adapter Thermal Sleeve Wear The licensee noted that it will perform the visual examinations of the RV thermal sleeves for ID/OD wear in conjuction with Code Case N-729-x required volumetric examinations of the penetration nozzles. Completion date for this visual examination was expected to be 03/08/2016.
12/09/2015 SLRA AMP B.2.3.6, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: austenitic, brittle, embrittle, embrittlement, cast stainless, thermal aging, cass, and cf8.
No significant plant-specific operating experience associated with the Thermal Aging Embrittlement of Cast Austenitic Stainless Steel program was noted by the staff during its review.
SLRA AMP B.2.3.7, Reactor Vessel Internals Audit Activities. The staff conducted an independent search of the applicants operating experience database using various combinations of non-case-sensitive keywords: 10 CFR 21, baffle bolt, clevis insert, clevis bolt, core barrel, fuel pins, guide card, guide tube, CRGT, CRDM, MRP, MRP-227, NEI 03-08, NSAL, technical bulletin, TB-12-5, and TB-16-4.
The table below lists the documents that were reviewed by the staff and were found relevant to the Reactor Vessel Internals Program described in LRA AMP B.2.3.7. These documents were identified in the staffs search of the applicants operating experience database and were provided by the applicant during the audit. The results of the staffs review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02128780 Operating experience (OpE) event report addresses MRP-227-A inspections of baffle bolts at Indian Point, Unit 2 and findings of significant bolting degradation at this unit. The CR documents and assesses the baffle-bolt degradation OpE for impact and relevance to PTN.
04/29/2016 AR 00474947 OpE CR addresses the 10-year ASME Code,Section XI inservice inspection of core barrel lower lateral restraint components at DC Cook Unit 1 and discovery of failed cap screws at this location. CR assesses this OpE for potential applicability to PTN.
05/06/2010 AR 01743690 AR 01748641 Both CRs address Westinghouse Technical Bulletin (TB), TB-12-5, Baffle Bolt Degradation, describing the results of apparent cause evaluation for baffle bolt failures at DC Cook Unit 2 in 2010. CRs document the applicants evaluation of the TB and actions to implement recommendations of the TB. TB recommended actions include monitoring site inspection activities for evidence of baffle bolt failure and monitoring industry activities related to evaluation of baffle bolts.
03/12/2012 03/26/2012 Document Title Revision / Date AR 01953095 CR addresses visual findings of surface damage due to abrasive wear for several lower radial support structure components at PTN Unit 3.
Abrasive wear of the surfaces was determined to be caused by foreign material that was identified during a previous outage. Vendor evaluation in the CR determined that this surface damage will not affect the integrity or functionality of these core support structure components and is not an issue for operability.
03/30/2014 AR 01953186 This CR documents the same condition as CR 01953095, specifically for the PTN 3 core barrel flange and reactor vessel core support ledge seating surfaces. The CR cites additional vendor reports for photos of these indications.
03/30/2014 AR 01972603 CR documents an error in the previous vendor fatigue calculation for the PTN baffle-former bolts. It also addresses an FSAR change based on the revised vendor analysis. Updated design cycles were incorporated into an FSAR change package, including 50.59 screen, based on the new vendor analysis.
06/17/2014 AR 01988655 CR addresses Westinghouse TB-14-5, Reactor Internals Lower Radial Support Clevis Insert Cap Screw Degradation. CR documents the applicants evaluation of the TB and actions to implement recommendations of the TB.
09/03/2014 AR 02025425 CR documents OpE evaluation regarding fuel failures at other sites due to baffle jetting. The CR documents a review of critical configuration differences for the PTN baffle-barrel assembly relative to other Westinghouse downflow configuration plants to determine if program enhancements or configuration changes are needed.
02/13/2015 AR 02124311 CR documents that the measured ligament wear for one of the control rod guide tube (CRGT) guide cards exceeds the allowable value in WCAP-17451. CR states that the CRGT guide cards were found to be acceptable for continued service; however a 100 percent re-inspection of the guide cards will need to be performed prior to 8.8 EFPY [effective full power years].
04/10/2016 Procedure Change Request (PCR) 02135601 The PCR addresses a change to the site procedure for the PTN RPV internals AMP to add the guidance in MRP 2016-001. The PCR also documents an update to FSAR Section 16.1.6 and 50.59 review based on the results of the NRC staffs assessment of the PTN RPV internals AMP for 60 years of operation.
06/02/2016 AR 02142706 AR 02143080 Both CRs address Westinghouse NSAL-16-1 regarding baffle-former bolt OpE and 10 CFR Part 21 evaluation. The NSAL documents inspections at Indian Point 2 and Salem 1, which revealed degraded baffle-former bolts. A 10 CFR Part 21 evaluation was performed for this issue, and the NSAL provides recommended actions. The PTN CRs addresses the review of NSAL-16-1 and associated OpE regarding baffle bolts for applicability to PTN.
07/08/2016 07/12/2016 AR 02152500 CR addresses Westinghouse TB-16-4 regarding OpE for fuel alignment pins with malconized surface treatment. The TB identifies fuel alignment pin surface degradation for an unnamed plant, which is not PTN. Based on review of the OpE, the TB identifies potentially susceptible plants as those that have Type 304 stainless steel pins with a malconized surface treatment; this includes PTN. CR evaluates PTN OpE with fuel alignment pins and addresses the recommendations of the TB.
8/26/2016 Document Title Revision / Date PCR 02244882 This PCR specifically updates the site procedure for the PTN RPV internals AMP to incorporate the NEI 03-08 interim industry guidance for baffle bolts provided in MRP letter MRP 2017-009, regarding baffle-former bolt inspections for PWR plants defined in NSAL-16-1; this includes PTN. PCR also notes that this interim guidance was implemented for the PTN 4 fall 2017 outage inspections.
1/16/2018 AR 02231145 CR addresses the PTN 4 baffle bolt inspection results for the PTN 4 outage in fall 2017. Per the acceptance criteria of WCAP-17887, more than one uninspectable or failed bolt per panel requires additional predictive stress evaluation. The PTN 4 baffle bolt inspection results exceeded this threshold. 2 bolts were found to have cracking indications, and 16 were suspect. All bolts remain installed and held in place by their locking mechanisms. Westinghouse analysis for the as found baffle bolting condition at PTN 4 demonstrates acceptability for one operating cycle. Additional predictive analysis will be used to establish re-inspection interval for PTN baffle bolts and address FSAR impact.
10/18/2017 SLRA AMP B.2.3.8, Flow-Accelerated Corrosion Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cavitat, CHECWORK, erosi, FAC, flow accel, and flow assist.
The table below lists the documents that were reviewed by the staff and found relevant to the Flow-Accelerated Corrosion program. These documents were identified during the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01638881 Flow-Accelerated Corrosion (FAC) Location 98, Component I-CSA-E-2 Is Less Than That Required 04/07/2011 AR 01630150 Reinspection of Feedwater Heaters 4E5A, 4E5B, 4E6A, and 4E6B 03/16/2011 AR 00455118 2008-36074 Chemistry Updates Are Not Being Provided to Maintain the Integrity of the FAC Models 11/20/2008 AR 00451182 2008-9553 FAC Location 49, at Valve 4-30-993 03/19/2008 SLRA AMP B.2.3.9, Bolting Integrity Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: moly, SCC, stress corrosion cracking, leak, bolt, torq, and corro.
The table below lists the documents that were reviewed by the staff and were found relevant to the Bolting Integrity Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00505246 Corrosion on T7 Lube Oil Storage Tank 07/19/2007 AR 00448631 Heavily corroded packing bonnet bolting on AFW valves 11/27/2007 AR 00478493 C AFW turbine governor valve stem anti-rotation device degradation 10/11/2014 AR 02114501 DWDS-007A Active Leakage at Packing Gland 03/02/2016 AR 02114505 DWDS-007B Active Leakage at Packing Gland 03/02/2016 SLRA AMP B.2.3.10, Steam Generators Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: steam generator, indication, tube, tubesheet, tube-to-tubesheet, PWSCC, foreign material exclusion, secondary side cleaning, divider plate, foreign object, and FOSAR.
The table below lists the documents that were reviewed by the staff and were found relevant to the Steam Generators Aging Management Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 2195707 3C Steam Generator Eddy Current Testing Results 04/02/2017 AR 01955728 TP3-27 Tube End Indication Outside Area of Interest 04/07/2017 AR 01955164 Required SG ECT Exam Identified After Equip Demob 04/05/2014 FPLCORP020-REPT-081, Rev. 2 Aging Management Program Basis Document - Steam Generators 01/26/2018 ER-AP-121, Rev. 4 Steam Generator Integrity 12/02/2016 AR 02196587 SG 3C Secondary Side FOSAR Results 04/05/2017 AR 02196549 SG 3B Secondary Side FOSAR Results 04/05/2017 Document Title Revision / Date MA-AA-101-1000, Rev. 19 Foreign Material Exclusion Procedure 04/10/2018 AR 01887637 Steam Generator INPO Operating Experience 07/08/2013 SLRA AMP B.2.3.11, Open-Cycle Cooling Water System Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: steam generator, indication, tube, tubesheet, tube-to-tubesheet, PWSCC, foreign material exclusion, secondary side cleaning, divider plate, foreign object, and FOSAR.
The table below lists the documents that were reviewed by the staff and were found relevant to the Steam Generators Aging Management Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 2195707 3C Steam Generator Eddy Current Testing Results 04/02/2017 AR 01955728 TP3-27 Tube End Indication Outside Area of Interest 04/07/2017 AR 01955164 Required SG ECT Exam Identified After Equip Demob 04/05/2014 FPLCORP020-REPT-081, Rev. 2 Aging Management Program Basis Document - Steam Generators 01/26/2018 ER-AP-121, Rev. 4 Steam Generator Integrity 12/02/2016 AR 02196587 SG 3C Secondary Side FOSAR Results 04/05/2017 AR 02196549 SG 3B Secondary Side FOSAR Results 04/05/2017 MA-AA-101-1000, Rev. 19 Foreign Material Exclusion Procedure 04/10/2018 AR 01887637 Steam Generator INPO Operating Experience 07/08/2013 SLRA AMP B.2.3.12, Closed Treated Water Systems Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: bacteria, clog, cooler, corros, foul, heat exch, leak, MIC, and 89-13.
The table below lists the documents that were reviewed by the staff and found relevant to the Closed Treated Water Systems program. These documents were identified during the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02052260 RV-700B Relief Valve Lifted When 3B Component Cooling Water (CCW)
Pump Started - Recurring Problem 06/04/2015 AR 02024280 Excessive Noise Heard at Heat Exchanger End with Throttled Flow 02/10/2015 AR 01990403 Tube Plugs Not Installed in 3C CCW Heat Exchanger Since the Eddy Current Testing (ECT) 09/11/2014 AR 01990401 3C CCW Heat Exchanger ECT Not Performed in the 2-year Frequency 09/11/2014 AR 01944754 Relief Valve RV-4-747 Lifts When Two CCW Pumps Running. AR Is to Require Non-Destructive Examination of Inlet Line Welds Each Time Relief Valve Lifts 03/01/2014 AR 01943455 RV-3-747A Lifted 02/24/2014 AR 01941355 RV-3-747A Lifted During 3-OSP-030.1, 3B and 3C CCW Inservice Test (IST) 02/15/2014 AR 01927177 During PM/IST Run of 4-B CCW Pump RV-4-747B Lifted 12/12/2013 AR 01852259 Install Support on Line to RV-4-747B Per EC 278231 02/28/2013 AR 01754818 Unit 3 CCW Oxygen Levels Changed from 200 to 2500 PPB 04/12/2012 AR 01709153 RV-4-747B CCW Weld Leak 11/22/2011 AR 01702616 Remove and Rebuild Valve CV-3-2906 Due to Valve Liner Degradation 11/02/2011 AR 00485114 2008-38101 Unit 3 CCW Leakage 01/02/2009 SLRA AMP B.2.3.13, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: crane, bolt, torq, corro, crack, fatigue, cycle, defor, and deflect.
The table below lists the documents that were reviewed by the staff and found relevant to the Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems.
These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00445053 H4 Spent Fuel Cask Crane Safety Issues 09/15/2007 AR 00521546 Inspection Findings of Spent Fuel Cask Crane H4 and Associated Structures Coating 01/28/2009 AR 00460184 Corrosion of Spent Fuel Crane Structural Member 04/15/2009 AR 01744605 U3 Spent Fuel Storage and Handling Building Degraded Steel 03/14/2012 AR 01746356 Turbine Building Gantry Crane Degraded Steel 03/19/2012 AR 01759959 U3 Polar Crane Degraded Structural Steel and Coating 04/26/2012 AR 01840419 Turbine Gantry Crane East Rail Walkway Extension Damage 11/18/2013 AR 01978655 Crane Trolley/Bridge Rails, Support Beams, Bolting Corroding 07/17/2014 AR 02023033 H2 Intake Crane Bridge Rails Corroded 02/04/2015 SLRA AMP B.2.3.14, Compressed Air Monitoring Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: instrument air, dew, air, and clog.
The table below lists the documents that were reviewed by the staff and were found relevant to the Compressed Air Monitoring program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00405192 Instrumental Air Through Wall Leak 11/02/2006 AR 00456677 Service Air is Highly Degraded 07/23/2008 AR 02157562 High Dew Point 09/23/2016 AR 02217968 Dew Point Reading High 08/01/2017 Document Title Revision / Date AR 02219375 Poor Performance Instrumental Air Dryer 08/09/2017 AR 00461790 Aftercooler Fan Not Running 02/18/2009 AR 01620508 Clogged Instrumental Air From Water Drain 02/16/2011 SLRA AMP B.2.3.15, Fire Protection Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: fire barrier, triennial fire inspection report, fire door, halon, halon pressure, and fire door assemblies.
The table below lists the documents that were reviewed by the staff and were found relevant to the Fire Protection Aging Management Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date PTN-FPER-16-002 Fire Protection Evaluation Record: Evaluation of Fire Doors 018-1, 020-1, 026-1, 027-1 for NFPA 805 Compliance 12/01/2016 AR 02082267 Replacement of Fire Door 132-1 For CSR 02/06/2017 PTN-FPER-16-001 PTN 805 Overview MAINT v0 01/18/2016 AR 02237869 Recovery Plan Needed for Fire Barrier Penetration 11/28/2017 AR 02110294 Fire Protection Change Management Plan 02/02/2017 DBD 5610-016-DB-001 Design Basis Document-Fire Protection System NFPA 805 Design Basis 02/29/2016 WO-4053444801 Fire Hydrant Semi-Annual Inspection 01/31/2018 WO-4058364201 3 Halon Cylinders Observed with Less than Required Pressure 03/02/2018 WO-40534448-02 Halon Station System Semi-Annual Inspection 10/28/2017 WO-40511396 Fire Hyd/Halon Sys Semi-Annual Inspection 07/19/2017 AR 02230896 Smoke Detectors not Tested within Required Frequency 02/28/2018 Document Title Revision / Date AR 02194365 Cable Spreading Room Halon Transfer Switch Tab Broken 03/30/2017 AR 02154509 A Inverter Room Reserve Cylinder Low Pressure 09/12/2016 AR 02084620 Halon Bottle Failed Acceptance Criteria 10/26/2015 AR 02045017 FD 106-1 Halon Seal Damage 05/06/2015 AR 02030054 Degrading Halon Seal 03/11/2015 AR 01999910 Potential Corrosion Damage on Halon Cylinder 11/24/2014 AR 00533383 Halon Cylinder Failed Acceptance Criteria 04/16/2010 AR 02245313 Fire Door Does Not Close Automatically 01/22/2018 AR 02245311 D106-CR Door Difficulty Closing On Its Own 01/22/2018 AR 02240228 Fire Door 072-1 3B EDG Door, Does Not Latch 12/12/2017 AR 02240109 D133-3 Fire Door for 4B EDG Air Start Room - Does Not Open 12/11/2017 AR 02236527 Fire Door Not Latching Properly 11/16/2017 AR 02232824 Fire Door 133-1 Does Not Automatically Close 10/26/2017 AR 02228308 Fire Door D028-1 Does Not Consistently Latch 10/04/2017 AR 02227796 Fire Door 139-1 Wont Close Unassisted 10/02/2017 AR 02224289 Fire Door 104-3 Has Bad Seal 09/11/2017 AR 02222972 Fire Door 58-2 Not Opening 08/30/2017 AR 02221237 Fire Door 58-2 in Aux BLDG not Latching On Its Own 08/23/2017 AR 02211669 Fire Door Damaged 06/22/2017 Document Title Revision / Date AR 02209642 Door Not Self Closing 06/09/2017 AR 02208584 Fire Door 027-1 Found Not Latching On Its Own During Rounds 06/05/2017 AR 02207534 Fire Door 134-2 Does Not Close Unassisted 05/27/2017 AR 02207483 Fire Door 58-2 Not Closing 05/26/2017 AR 02205879 Fire Door 46-2 Does Not Close Properly 05/18/2017 SLRA AMP B.2.3.16, Fire Water System Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: block, clog, foul, leak, recur, residue, silt, spray, sprinkler, tank, and through-wall.
The table below lists the documents that were reviewed by the staff and were found relevant to the Fire Water System Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00405413 Leak in weld on 10-inch fire main piping.
04/26/2007 AR 00440984 Small leak in the 1-inch inspector test drain line on the first floor of the nuclear maintenance building in the area of the fire system riser.
05/02/2007 AR 00440545 Through wall leakage in the fire main header.
05/03/2007 AR 00507320 An approximately 2-inch diameter fire line is corroded and leaking at the screwed fitting near a sprinkler head above No. 3 waterbox inlet piping, upstream of drain valve 3-10-1311.
09/12/2007 AR 00513828 During an inspection of the deluge piping for Unit 4 transformer, quite a bit of debris was noted in the valves and piping. Some white chalky buildup; possibly from raw water lime content was noted.
04/04/2008 AR 00513751 The 3A emergency diesel generator (EDG) deluge drain check valve is not draining because it is clogged 04/05/2008 AR 00462447 Fire water system pipe leak at the raw water storage tank (RWST) in a 2-inch pipe at threaded connection. No visible signs of extensive external corrosion.
01/26/2009 Document Title Revision / Date AR 01618249 There is a leak at the connection between the pipe and elbow just downstream of valve 10-619. The leak is a slow drip when in standby and continuous spray when the electric driven fire pump is running.
02/09/2011 AR 01656877 The drain line for RWST-2 is plugged. Water has accumulated and is not draining.
06/01/2011 AR 01766399 Degraded coatings on the RWSTs.
05/11/2012 AR 01766399 Minor corrosion is bleeding through holidays in the protective coating around the bottom ring and anchorages for RWSTs I and II.
05/11/2012 AR 01800862 Fire suppression system piping is leaking at a piping union west and above the U3 4A low pressure feed water heater.
09/07/2012 AR 01824738 The 4-10-1301 sprinkler valve just south of the cable spreading room on the mezzanine deck is leaking directly on top of the secondary response center. This is causing mild flooding in the room.
11/17/2012 AR 01824931 A 1-inch pipe with a spray nozzle is broken off of the fire protection loop around the lube oil tank at U4.
11/18/2012 AR 01871471 Water is leaking onto the floor in the response center. The water is coming from the overhead and running down inside the wall, possibly from the fire sprinkler system.
05/02/2013 AR 01877303 Valve 3-10-1303 is leaking externally at a rate of approximately 30 drops per minute (dpm).
05/25/2013 AR 01887603 Action request associated with removing an approximate 3-foot section of 3-inch pipe and replacing it with new pipe. The work area is located in the heating, ventilation, and air conditioning room located on the east side of the building.
07/08/2013 AR 01950652 Through-wall leak on the fire water jockey pump recirculation line. The leak is shooting a 10 to 15 foot stream of water into the air.
03/22/2014 AR 01979733 External corrosion on RWST-1.
07/23/2014 AR 01990890 The deluge fire system just west of the U4 lube oil reservoir has a pin hole leak coming from the joint elbow above valve 4-10-1600. The leak is a constant spray, not drops.
09/12/2014 AR 02003846 The RWST-2 overflow drain line is plugged again.
10/31/2014 AR 02021813 Piping near valve 4-10-1600, alarm test valve for U4 turbine building sprinklers, is leaking by a previously installed patch and spraying approximately 1 gallon per minute (gpm).
This action request is also linked to 01990890.
01/29/2015 AR 02065087 Valve 4-10-1303, U4 turbine building east sprinkler system sectional isolation valve for the 18-foot elevation sprinklers is leaking at a rate of 200 DPM.
08/05/2015 Document Title Revision / Date AR 02120372 While performing test, the acceptance criteria was found unsatisfactory because two of four nozzles on the north side of the emergency diesel generator building were found to be not spraying enough water.
03/25/2016 AR 02124480 Water was noted to be leaking through the lighting fixture in document control. It has been determined that the pipe that is leaking is a fire sprinkler pipe.
04/11/2016 AR 02154122 While performing spray/sprinkler partial flow test, solenoid valve SV-3-54BS-1 appeared to have a low volume of flow as identified by the fire protection subject matter expert.
09/06/2016 SLRA AMP B.2.3.17, Outdoor and Large Atmospheric Metallic Storage Tanks Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: blister, coat, delam, flak, flaw, holiday, leak, min wall, peel, tank, and through wall.
The table below lists the documents that were reviewed by the staff and were found relevant to the Outdoor and Large Atmospheric Metallic Storage Tanks Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00502385 The U3 diesel oil storage tank (DOST) berm is filling with 3 inches of water.
02/05/2007 AR 00551328 Rust is present on the top of the demineralized water storage tank (DWST) just east of the new maintenance building.
1/24/2008 AR 00452475 The U3 EDG fuel oil storage tank berm sump pump is not working. This is the fourth pump maintenance has installed in this berm to prevent rainwater from accumulating in the berm.
The installed pump has been inoperable for a year 04/02/2008 AR 00514893 Coating near the base of the primary water storage tank (PWST) is flaking off.
06/26/2008 AR 00457100 External corrosion at the roof joint for U4 condensate storage tank (CST).
08/25/2008 AR 00454768 While performing the cleaning, coating and repairs of the U4 CST, several areas of heavy corrosion and possible metal degradation were detected. Based on followup ultrasonic thickness measurements, loss of material varied between one-sixteenth of an inch to three-eights of an inch.
11/12/2008 AR 00461549 The U3 and U4 CST holdown bolts are corroded.
01/20/2009 AR 00463528 External corrosion on the dome of the DWST.
02/18/2009 Document Title Revision / Date AR 00467274 A 1/2-inch wide by 5/8-inch long section of the U3 CST has a corroded area 0.103" deep.
07/07/2009 AR 00485648 Small corrosion hole in roof of U3 CST.
01/27/2010 AR 00469365 External corrosion on the roof of the U3 PWST.
02/10/2010 AR 00473934 External corrosion on the roof and roof to wall joint on the U4 PWST.
02/10/2010 AR 01670028 Pinhole leak in the roof of the U3 refueling water storage tank (RWST).
07/18/2011 AR 01714507 Degraded coatings on the U4A DOST.
12/09/2011 AR 01714512 Degraded coatings on the U4B DOST 12/09/2011 AR 01759972 Degraded coatings on the DWST 04/26/2012 AR 01766399 Minor corrosion bleeding through holidays in protective coating around bottom ring and anchorages of RWSTs I and II. There was also a failed joint seal between RWST I foundation and concrete yard pavement.
05/11/2012 AR 01766370 The top coat for the DWST is peeling and flaking and as a result, revealing the underlying coatings. No bare metal has been exposed.
05/11/2012 AR 01796341 The base plate on the north side of the DWST shows visible corrosion. The tank shows loose and flaking paint in several locations.
08/22/2012 AR 01796590 Visible corrosion exists of the top northwest side of the PWST as evidenced bY rust staining. The tank base shows visible corrosion around the entire tank.
08/23/2012 AR 018169904 The U3 DOST basin berm sump pump is pumping at a lower flow rate than normal. It could take too long to pump down in inclement weather.
10/26/2012 AR 01831734 The fire pump fuel oil storage tank has spalling in its side walls.
In some areas it appears to have lost as much as half the wall thickness.
12/11/2012 AR 02133442 The U3 DOST berm is partially filled with water to the point that the sample valve is underwater.
05/22/2016 AR 02137525 The U3 DOST berm drain valve is not draining properly and water is accumulating.
06/12/2016 SLRA AMP B.2.3.18, Fuel Oil Chemistry Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: diesel fuel, biological, corrosion, inspection, and biofuel.
The table below lists the documents that were reviewed by the staff and were found relevant to the Fuel Oil Chemistry program. These documents were provided by the applicant. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00452971 Visual Inspection Results of Storage Tank 08/17/2010 AR 00573799 Tank Wall is Significantly Degraded 08/08/2012 SLRA AMP B.2.3.20, One-Time Inspection Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: tank, corrosion, and inspection.
No significant plant specific operating experience associated with the One-Time Inspection program was noted by the staff during its review.
SLRA AMP B.2.3.21, Selective Leaching Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: dealloy, degraph, dezinc, selective leach, zinc, dealum, dezinc, graphiti, and cast iron.
The table below lists the documents that were reviewed by the staff and were found relevant to the Selective Leaching program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01735146 License renewal C auxiliary feedwater lubricating oil cooler inspection.
02/16/2012 AR 01842355 Soft material found on circulating water pipe spool pieces.
01/24/2013 AR 02247382 Intake cooling water piping showing graphitic corrosion at penetration.
01/31/2018 AR 01863640 Internal graphitization on circulating water pump discharge cast iron pipe.
04/06/2013 SLRA AMP B.2.3.22, ASME Code Class 1 Small-Bore Piping Audit Activities. The staff conducted an independent search of the applicants operating experience database using the keywords: weld, cracking, crack, failure, socket, sockolet, weldolet, butt weld, thermal, fatigue, and leakage.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document Title Revision / Date FPLCORP020-REPT-093 Aging Management Program Basis Document - ASME Code Class 1 Small-Bore Piping Rev. 1 AR 00467808 License Renewal Self-Assessment.
07/21/2009 FPLCORP020-REPT-120 Aging Management Program Basis Document - Operating Experience (OE) Program Report Rev. 0 PTN-ENG-LRAM-00-039 Small-Bore Class 1 Piping Inspection License renewal Basis Document Rev. 3 PTN-ENG-SENS-11-062 Turkey Point Units 3 and 4 ASME Code Class 1 Small-Bore Piping One-Time Inspection Plan Rev. 1 AR 00406070 RCS Leak 08/07/2008 AR 02148592 Pinhole crack or leak 08/08/2016 SLRA AMP B.2.3.23, External Surfaces Monitoring of Mechanical Components Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: corros, leak, rust, and wall thin.
The table below lists the documents that were reviewed by the staff and found relevant to the External Surfaces Monitoring of Mechanical Components program. These documents were identified during the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 021003233 Section of Spent Fuel Pool Heat Exchanger Pipe Missing Paint and Rusty 01/16/2016 AR 02027363 CCW Piping Corrosion - Walkdowns of the Unit 3 and Unit 4 CCW Areas 02/23/2015 AR 02026617 Service Air Pipe Severely Corroded - Numerous Locations Show Signs of Extensive Rust and Some Lines are Rotted Through 02/19/2015 AR 02024325 Long Term Strategy for Component Cooling Water System External Corrosion 02/10/2015 AR 02009943 Component Cooling Water Pump A - Poor Coatings / Material Condition Due to Corrosion 11/29/2014 Document Title Revision / Date AR 01763530 Corroded CCW Header Piping on 10-foot Elevation 05/03/2012 AR 00438970 2007-8515 While Performing PMT for Work Order (WO) 36023630-02 Additional Through-Wall Leaks in Instrument Air Identified. Actions for Existing Leaks (WO 36023630) and to Repair the East End Corrosion Observed (WO 36025913) 03/23/2007 SLRA AMP B.2.3.24, Flux Thimble Tube Inspection Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: flux thimble, thimble tube, and thimble tubing.
No significant plant specific operating experience associated with the AMP B.2.3.24, Flux Thimble Tube Inspection Program was noted by the staff during its review.
SLRA AMP B.2.3.25, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: biofoul, crack, corrosion, wall loss, through wall, foul, leak, microbiologic, and loss of material.
No significant plant-specific operating experience associated with the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program was noted by the staff during its review.
SLRA AMP B.2.3.26, Lubricating Oil Analysis Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: lube, oil analysis, lubricating, and water intrusion.
The table below lists the documents that were reviewed by the staff and were found relevant to the Lubricating Oil Analysis program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00458909 Lubricating Oil Sample 10/04/2008 AR 00405732 Water Intrusion Into Pump/Motor Oil Roll-up 11/28/2007 AR 00442260 Water Contamination in B Service Water Pump 06/29/2007 AR 00444924 Water Intrusion/Corrosion 09/19/2007 Document Title Revision / Date AR 00444974 Oil Samples Continue to Find Water in 4P11A 09/20/2007 AR 00454462 Air Compressor had Water in the Oil 06/23/2008 AR 00456270 B Service Water Pump Oil Sample 07/15/2008 AR 00457151 Upper Bearing Oil Cloudy 08/17/2008 AR 00461108 Oil Sample From C Service Water Pump Bearing 01/05/2009 AR 00463193 CWP Bearing Oil Appears to have Water in it 03/24/2009 SLRA AMP B.2.3.27, Monitoring of Neutron-Absorbing Materials other than Boraflex Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Boral, Metamic, neutron absorb, neutron-absorb, and neutron monitoring.
The table below lists the documents that were reviewed by the staff and were found relevant to the Monitoring of Neutron-Absorbing Materials other than Boraflex program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01973423 Metamic Insert Surveillance Not Ready 6/20/2014 SLRA AMP B.2.3.28, Buried and Underground Piping and Tanks Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: buried, coat, corrosion, concrete, crack, wrap, wall loss, vault, underground, through wall, piping, min wall, PCCP, pinhole, microbiologic, loss of material, holiday, flaw, excavat, spalling, and leak.
The table below lists the documents that were reviewed by the staff and were found relevant to the Buried and Underground Piping and Tanks program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02066294 Repair of a suspected buried service water pipe leak.
08/11/2015 AR 02014369 Turkey Point asset management plan tracking.
12/19/2014 AR 01940055 Drawing does not reflect service water valve.
02/11/2014 AR 00462055 External corrosion of buried service water piping.
01/29/2009 AR 00464785 Corrosion at air/ground interface at fire hydrant shut-off valve.
10/08/2009 AR 00485197 External corrosion of buried fire protection piping.
01/26/2009 AR 01955813 Intake cooling water buried piping inspection UT results.
04/07/2014 AR 00529702 Buried fire main leakage between valves 10-PIV-5 and 10-PIV-6.
11/07/2009 AR 00460508 Previously documented leaking valve potentially undermining central alarm station building foundation.
12/11/2008 AR 02055286 Unsatisfactory asset protection for turbine plant cooling water supplemental cooling system.
06/19/2015 SLRA AMP B.2.3.29, Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: blister, coat, delam, flak, flaw, holiday, leak, lined, lining, min wall, peel, and spall.
The table below lists the documents that were reviewed by the staff and were found relevant to the Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00505579 Flaking coatings exist on the 4A component cooling water (CCW) heat exchanger outlet nozzle.
08/02/2007 AR 01810931 The intake cooling water (ICW) butterfly valve liners associated with the 4B CCW heat exchanger have experienced delamination. Corrective actions on U3 included removing the rubber liner from selected valves and recoating with epoxy material.
10/08/2012 SLRA AMP B.2.3.30, ASME Section XI, Subsection IWE Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: bellows, blister, bolt, chase, containment, corrosion, coating, degrad, IWE, leak, liner, loss of material, pit, and moisture barrier.
The table below lists the documents that were reviewed by the staff and were found relevant to the ASME Section XI, Subsection IWE Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00408065 Applicability of NRC Information Notice 2004-09 Corrosion of Steel Containment and Containment Liner to PTN 07/16/2004 AR 01964311 Review of NRC IN 2014-07 Degradation of Leak-Chase Channel Systems 05/07/2014 AR 00477248 2010-16138 NRC IN 2010-12: Containment Liner Corrosion 6/23/2010 AR 01715669 NRC IN 2011-15 Steel Containment Degradation and Associated LR Aging Management Issues 12/13/2011 AR 1920613 Issues Replacing Anodes for Containment Cathodic Protection 11/14/2013 AR 02216534 Containment Cathodic Protection System Non-Functional 7/24/2017 AR 00463140 2009-8032 Disbondment of Moisture Barrier Sealant U4 and U3 3/18/2009 AR 00471865 2009-34064 Boric Acid Build-up on RX Sump Liner Walls 12/4/2009 AR 00589321 Failure and Degradation of Reactor Sump Liner Coating U3 10/22/2010 AR 01633252 Boric Acid and Water on Moisture Barrier Near 001 and 002 VA, U4 3/24/2011 AR 01637516 Pitting in U4 Liner Plate on 14 Elevation 4/4/2011 AR 01743085 As-Found Condition of U3 Dome 3/9/2012 AR 02086323 U3 Containment Degraded/Damaged Moisture Barrier 10/27/2015 AR 02089681 U3 Containment Degraded/Damaged Moisture Barrier 11/7/2015 AR 02086711 U3 Through wall Hole Identified - Toe Plate 14 EL by Elevator 10/28/2015 Document Title Revision / Date AR 02229327 Indication of Corrosion on U4 Liner Plate 10/10/2017 AR 02231437 Unit 4 Containment Liner (Interior Dome) 10/19/2017 AR 02231476 IWE Exam - Liner Under Support Above P45 Evidence of Corrosion 10/19/2017 AR 00591357 Planning of ISI/IWE Inspections in RX Cavity - PT3-25, U3 10/30/2010 AR 00591353 Potential Exists for Degraded Containment Lining in Unit 4 10/30/2010 AR 01826874 As-Found Condition of the U4 Containment Liner Plate 306 11/26/2012 AR 0212651 Boric Acid and Staining on Reactor Sump Liner Plates 4/19/2016 AR 00589321 Unit 3 Failure and Degradation of Reactor Sump Liner Coating Including Through-wall Corrosion 10/22/2010 AR 00598307 OE32389 - Containment Liner Through Wall Degradation -
Turkey Point U3 (Event Date 10/22/2010) 12/1/2010 AR 00590334 Turkey Point Plant Event #46362, Containment Liner Corrosion Degradation 10/27/2010 AR 01600683 Liner Plate Wall Thickness Below TS Design Feature Value U3 12/10/2010 AR 01637519 Degraded Coatings, Rust on Liner Plate and Penetrations 64A and 64C 4/4/2011 AR 01743064 As-Found Condition of U3 Containment From 14 Elevation 3/9/2012 AR 02090843 U3 IWE Liner Exam - Various Areas of Degradation Identified EL 14 to 120 11/12/2015 AR 02124513 U4 ASME Section XI IWE Liner Coating Liner 4/11/2016 AR 02123227 ASME Section XI - Liner Discoloration, Rust and Flaking Paint 4/5/2016 AR 00444852 2007-28896-RV-3-382 W/O 37000665 Failed As Left Test (Bellows Leak) 9/18/2007 SLRA AMP B.2.3.31, ASME Section XI, Subsection IWL Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: concrete, tendon, containment, spall, moisture, rebar, corrosion, post tension, prestress, inservice, ISI, and IWL.
The table below lists the documents that were reviewed by the staff and were found relevant to the ASME Section XI, Subsection IWL Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01737608 Concrete surface indications in Unit 4 dome 08/25/2012 AR 00410669 Potential Tendon Degradation from Water Intrusion 10/20/2004 AR 00423389 Unit 4 Containment building concrete spalling found after Hurricane Wilma 04/02/2007 AR 00428533 Degraded Concrete and Wood Embedded Under Concrete 03/19/2006 AR 00430868 Leaking Tendon Caps 06/19/2006 AR 0043147 Buttonheads Missing from Tendon Number 13H31 02/09/2007 AR 00437533 Water Observed in Tendons During 35th Year Tendon Inspection 02/09/2007 AR 00437888 Tendon Grease Seeping from Non-Structural Concrete Fill 03/08/2007 AR 00438214 Small Presence of Water from Shim Stack and Level 03/09/2007 AR 00478759 Containment Coatings Degradation 05/23/2005 AR 00484335 Concrete Crack/Delamination on the 14 Elevation 04/23/2008 AR 01767040 Reinforced Concrete Foundations and Walls Below Groundwater 06/13/2012 AR 01787985 Structural Deficiencies 09/13/2012 AR 02089681 Corrosion/Spalling at Containment Walls 05/20/2014 AR 01746929 Failing Concrete Patch Job 05/25/2012 AR 01678456 Delayed Actions to Repair Degraded Concrete 10/26/2011 AR 00585119 Issues identified by NRC License Renewal Audits 08/31/2011 Document Title Revision / Date AR 01836596 Concrete Degradation Outside of Acceptance Criteria 01/08/2013 AR 00591357 Deficiencies Identified During Tendon Galley Inspections 10/30/2010 SLRA AMP B.2.3.32, ASME Section XI, Subsection IWF Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: IWF, support, hanger, pipe support, and corrosion.
The table below lists the documents that were reviewed by the staff and were found relevant to the ASME Section XI, Subsection IWF Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02124329 High Head Safety Injection Support Out of Tolerance 10/26/2016 AR 00449073 Pipe Support has Hole Rusted Thru at Base Plate 03/11/2008 AR 00423389 Visual Examination Record VT-3 Mechanical and Welded Attachments 04/02/2007 AR 00428533 Corroded Pipe Support Post for Unit 4 Primary Water Makeup Pumps 03/19/2006 AR 00453130 Corrosion Damage on CCW Head Tank and Zinc Coating Degradation Observed on Hilti Bolting 04/24/2008 AR 00453223 Lack of Thread Engagement and Clearances Out of Tolerance 10/27/2008 SLRA AMP B.2.3.33, 10 CFR Part 50, Appendix J Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Appendix J, ILRT, and LLRT.
The table below lists the documents that were reviewed by the staff and were found relevant to the LRA Section B.2.3.33, 10 CFR Part 50, Appendix J. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02010647 Type B/C LLRT Not Performed Following Repairs 12/03/2014 AR 02058127 Appendix J LLRT of Airlock Equalizing Valve Issue 07/02/2015 AR 02065134 NRC Identified - Late Entry into TS 4.0.3 08/06/2015 AR 00463140 U3, Disbondment of the Moisture Barrier Sealant 03/18/2009 AR 01783251 U3, ILRT Delays Encountered During Personnel Hatch Closure 07/10/2012 AR 01845318 U4, Containment Purge Exhaust Valves Failed LLRT 02/05/2013 AR 02239231 Acceptance Criteria for Appendix J 12/06/2017 AR 00405527 U3, Penetration 31 Failed LLRT (CV-3-4659B) 09/20/2007 AR 00405870 U3, LLRT Failure on PEN 23 (POV-3-2600 and POV-3-2601) 03/01/2008 AR 02085628 U3, Packing Leak (Operable but Degraded) 10/26/2015 AR 02089841 U3, Vent Valve for Emergency Air Lock to Containment Failed 11/09/2015 AR 02124577 U4, LLRT Failures for PT4-29 RFO (4 LLRT Failures in 18 mo.)
04/11/2016 AR 00405907 U4, Outage Scope for LLRTs Requires Adjustment 04/01/2008 SLRA AMP B.2.3.34, Masonry Walls Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: masonry, block, block wall, crack, and CMU.
The table below lists the documents that were reviewed by the staff and were found relevant to the Masonry Wall Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01883581 Long Crack on North Wall in 3A SWGR Load Center 06/19/2013 Document Title Revision / Date AR 01765520 Flood Wall Breaches Identified During O-ADM-116 Walkdown 05/9/2012 AR 00473607 2010-1560 - Fall Power Block Roof Inspection Findings 01/22/2010 AR 001803016 NEI 12-07 Flooding Inspection: Perimeter Flood Protection Barrier 09/14/2012 SLRA AMP B.2.3.35, Structures Monitoring Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: leach, pile, corros, sliding, ASR, groundwater, crack, struct, underground, chlor, spall, steel, and conc.
The table below lists the documents that were reviewed by the staff and were found relevant to the Structures Monitoring Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01687929 Potential in-leakage of groundwater into the auxiliary building 09/20/2011 AR 02041346 4A EDG west grating, concrete floor, air tunnel deterioration (spalling, delamination of concrete and steel corrosion) 04/17/2015 AR 02043489 Concrete on the U3 main steam platform has eroded exposing rebar 04/26/2015 AR 02086087 Concrete falling from turbine building deck to mezzanine with apparent pieces of rebar.
10/27/2015 AR 02140186 3B ICW pump base grout deterioration and steel corrosion 06/24/2016 AR 02144384 3A EDG ceiling rebar concrete cover depth less than minimum 07/18/2016 AR 02030479 Turbine deck corroded with exposed rebars and spalling concrete 03/16/2015 AR 0203396 Spent fuel pool liner leak chase system shows evidence of leakage 03/15/2015 AR 0205396 Corroded nuts at the base of turbine building support column KBC361 09/30/2015 AR 00440745 Corroded supports / beams at the intake structures 05/09/2007 AR 01832359 Increased degradation of plant vent stack support - excessive corrosion 12/12/2012 Document Title Revision / Date AR 01796338 U-4 yard structures degraded concrete - deficiencies outside license renewal acceptance criteria 08/22/2012 AR 0417924 Degraded containment moisture barrier sealant 04/15/2005 AR 01839987 U-4 Containment elevation 14 - degraded concrete (joint sealant deterioration, concrete spall, water leakage, leaching stain) 01/16/2013 AR 00448795 Manhole 315 has major structural damage to east wall (cracking, rebar rust and expansion) 12/03/2007 AR 00484335 Concrete crack/delamination on the 14-ft elevation of containment 04/11/2008 SLRA AMP B.2.3.36, Inspection of Water-Control Structures Associated with Nuclear Power Plants Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: steel, concrete, crack, corrosion, loosening bolt, spall, intake structure, discharge structure, and cooling canals.
The table below lists the documents that were reviewed by the staff and were found relevant to the RG 1.127, Inspection of Water Control Structures Associated with Nuclear Power Plants.
These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00448795 Man hole 315 has major structure damage 01/08/2009 AR 00457080 Significant corrosion in Unit 3 ICW pipe pit l 08/08/2008 AR 02159893 Degraded coating & material condition @ ICW structure 10/03/2016 AR 00573132 Degradation of U-3 ICW valve pit wall 08/12/2010 AR 02134432 Degradation of steel support 05/26/2016 AR 02146030 Degradation of steel support 07/26/2016 AR 00403585 Significant grass event requiring units to reduce power 04/16/2007 AR 01944993 Degraded concrete and rebars @ 4B2 East side 03/03/2014 AR 01832119 Corrosion on steel beam 12/12/2012 AR 01768157 Intake structure degraded steel and concrete 05/17/2012 AR 00471655 Support is corroded 12/15/2009 AR 00467130 Bending I-beam @ weir pit 06/25/2009 SLRA AMP B.2.3.37, Protective Coating Monitoring and Maintenance Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Carboline, Carboguard, coating, delamin, delamination, liner, lining, paint, peel, and service level + coat.
The table below lists the documents that were reviewed by the staff and were found relevant to the Protective Coating Monitoring and Maintenance program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00411237 Surface Coatings Preparations of Containment Wall 10/22/2004 AR 00589321 Failure and Degradation of Reactor Sump Liner Coating 10/22/2010 AR 01997173 Coatings Material Not Stored in Compliance with Spec 10/08/2014 AR 02090419 As-Left Containment Coatings Walkdown for PT3-28 RFO 11/10/2015 AR 02123163 ASME Section XI - Moisture Barrier Damage Identified 04/05/2016 AR 02123227 ASME Section XI - Liner Discoloration Rust & Flaking Paint 04/05/2016 SPEC-C-004 Protective Coatings for Areas Outside the Reactor Containment 10/07/2015 SPEC-C-034 Protective Coatings for Service Level 1 Applications Inside the Reactor Containment Building 09/03/2015 AR 02126499 As-Left Coatings Walkdown for the PT4-29 Refueling Outage 04/19/2016 AR 00404032 New Parameters for Service Level 1 Coatings 07/09/2004 SLRA AMP B.2.3.38, Electrical Insulation for Electrical Cables and Connections Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cable, embrittlement, cracking, discoloration, melting, swelling, surface contamination, insulation, and adverse localized.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Insulation for Electrical Cables and Connections Not Subject to 10 CFR 50.49 EQ Requirements. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00459490 Connection and insulation degradation of the 3C SWGR were observed during a water intrusion walkdown. Connections may have aged and have experienced condensation, water intrusion. SWGR is monitored in the maintenance rule at plant level. WR 39004418 and WR 39004419 have been initiated and visual inspections to be performed.
03/09/2010 AR 01633311 Several of the cables outer jackets were brittle and cracking while performing W.O. 40011545 removal of 480V and control cables for the replacement of the aux. transformer.
08/10/2011 AR 01644297 Thermography survey identified high temp jumper wires (81.6c to 127.6c). Temp appear to be a result of heat dissipation from surrounding energized components. Exposure to the above temperature could reduce the long term service life of the insulation.
Perform detailed inspection of the subject wires, visual inspection for signs of heat damage, discoloration, hardening, brittle or cracked.
12/29/2011 AR 01821365 Conduits on catwalk by discharge area are corroded at the coupling and have separated causing stress on cables. The insulation on the cables has pulled apart on at least one joint.
12/01/2012 AR 1830160 The 4B East Condenser Pit Sump Pump cable to the control box for 4P28A and 4P28B is dry rotted with the wires visible through the small cracks in the cable insulation.
12/07/2012 AR 01822656 Insulation is degraded on busbars for 4C RCP motor and needs to be repaired before the motor is re-energized.
01/09/2013 AR 01840798 Troubleshooting effort for AR 01829500, found severely degraded field power lead to the I/P for PCV-4-455A. The cable insulation had signs of severe overheating and was grounding on the inside of the conduit, near the valve body. Cable requires replacement. AR 1835634 found severely heat damaged cables inside a flex conduit that was located in close proximity to uninsulated valve body. Suggest Cable Engineering investigate both issues, look for common cause, determine additional inspections looking for potential other issues and determine additional generic corrective actions for unit 4 prior to startup.
03/22/2013 AR 01951439 Noticed cracked wire insulation at breaker 6, panel 3b11. Wire is located at the top right of the breaker, while working w/o 40247176-01.
03/28/2014 AR 01951441 Noticed cracked wire insulation at breaker 6, panel 3b12. Wires are located at the top and middle right of the breaker, while working w/o 40247176-01.
03/28/2014 AR 02173115 SCRF-T3R29-00014 Outage scope form approves work to be performed in outage in response to OX31. Need a Work Order generated. AR#2150948 documents 3B2 Circulating Water Pump Stopping due to degraded control cables.
12/08/2016 SLRA AMP B.2.3.39, Electrical Insulation for Electrical Cables and Connections Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: intermediate range monitor, power range monitor, source range monitor, instrumentation circuit, neutron flux, radiation monitor, thermal transient, moisture intrusion, electrical insulation, sensitive circuit, high voltage circuit, and low-level current signal.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Insulation for Electrical Cable and Connections Not Subject to 10 CFR 50.49 Requirements used in Instrumentation Circuits. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01740821 The erratic IRM indications were caused by degraded cable shielding at cable connectors. The degraded shielding allowed electrical noise to couple to the signal conductor and cause inaccurate IRM indications.
03/03/2012 AR 01779578 A high-voltage cable in the IRM A control room drawer was found to have a broken insulating shield, which caused the IRM spike.
06/26/2012 AR 02122559 During WO: 40350753-01 Unit 4 NIS Power Range Detector CHAR Early Test, found N-4-44 High Voltage Cable-Center Conductor to Inner Shield Insulation Resistance OUT OF SPEC LOW at 544 Mohm (minimum allowed 3.0 E+09 ohms) as per 0-CMI-059.10 Table 3.
Suspect possible moisture issue. This AR generated for Engineering to evaluate. No WR generated per engineering request.
04/29/2016 SLRA AMP B.2.3.40, Electrical Insulation for Inaccessible Medium-Voltage Power Cables Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cable, manhole, submerge, insulation, sump pump, tan delta, degraded cable, and vault.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Insulation for Inaccessible Medium-Voltage Power Cable Not Subject to 10 CFR 50.49 EQ Requirement. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01652075 Work Request #37015660 was generated per AR#449310 to plug leaks inside the wall of manhole 430 that was allowing saltwater enter the vault.
05/16/2011 AR 01880109 While performing inspection of manhole (MH) 427, water was discovered inside, about half inch above the sump pump level. Sump pump does not appear to be working properly. One of the MH also has small hole due to rust/corrosion.
06/06/2013 AR 2240914 While performing manhole inspection, water was found in MH 735.
The water sample was obtained and delivered to chemistry for sampling as required by 0-GMM-102.33.
12/15/2017 AR 01663455 While performing manhole inspection in accordance with (I/A/W)
Work Order (WO) 40055120-01, about 6 inches of water was discovered inside the MH 733.
06/23/2011 AR 01663452 While performing manhole inspection I/A/W WO #40055120-01, 6 inches of water was discovered inside MH 403.
06/23/2011 AR 01663450 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered in MH 404.
06/23/2011 AR 01663457 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered inside MH 319.
06/23/2011 AR 01789026 18 inches of water was found in MH 606 and was pumped out.
07/30/2012 SLRA AMP B.2.3.41, Electrical Insulation for Inaccessible Instrument and Control Cables Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cable, manhole, submerge, insulation, sump pump, tan delta, degraded cable, and vault.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Insulation for Inaccessible Instrument and Control Cables Not Subject to 10 CFR 50.49 EQ Requirement. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01652075 Work Request #37015660 was generated per AR#449310 to plug leaks inside the wall of manhole 430 that was allowing saltwater enter the vault.
05/16/2011 AR 01880109 While performing inspection of manhole (MH) 427, water was discovered inside, about half inch above the sump pump level. Sump pump does not appear to be working properly. One of the MH also has small hole due to rust/corrosion.
06/06/2013 AR 2240914 While performing manhole inspection, water was found in MH 735.
The water sample was obtained and delivered to chemistry for sampling as required by 0-GMM-102.33.
12/15/2017 AR 01663455 While performing manhole inspection in accordance with (I/A/W) Work Order (WO) 40055120-01, about 6 inches of water was discovered inside the MH 733.
06/23/2011 AR 01663452 While performing manhole inspection I/A/W WO #40055120-01, 6 inches of water was discovered inside MH 403.
06/23/2011 AR 01663450 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered in MH 404.
06/23/2011 AR 01663457 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered inside MH 319.
06/23/2011 Document Title Revision / Date AR 01789026 18 inches of water was found in MH 606 and was pumped out.
07/30/2012 SLRA AMP B.2.3.42, Electrical Insulation for Inaccessible Low-Voltage Power Cables Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: cable, manhole, submerge, insulation, sump pump, tan delta, degraded cable, and vault.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Insulation for Inaccessible Low-Voltage Power Cables Not Subject to 10 CFR 50.49 EQ Requirement. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01652075 Work Request #37015660 was generated per AR#449310 to plug leaks inside the wall of manhole 430 that was allowing saltwater enter the vault.
05/16/2011 AR 01880109 While performing inspection of manhole (MH) 427, water was discovered inside, about haft inch above the sump pump level. Sump pump does not appear to be working properly. One of the MH also has small hole due to rust/corrosion.
06/06/2013 AR 2240914 While performing manhole inspection, water was found in MH 735.
The water sample was obtained and delivered to chemistry for sampling as required by 0-GMM-102.33.
12/15/2017 AR 01663455 While performing manhole inspection in accordance with (I/A/W) Work Order (WO) 40055120-01, about 6 inches of water was discovered inside the MH 733.
06/23/2011 AR 01663452 While performing manhole inspection I/A/W WO #40055120-01, 6 inches of water was discovered inside MH 403.
06/23/2011 AR 01663450 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered in MH 404.
06/23/2011 AR 01663457 While performing manhole inspection I/A/W WO #40055120-01, about 6 inches of water was discovered inside MH 319.
06/23/2011 AR 01789026 18 inches of water was found in MH 606 and was pumped out.
07/30/2012 SLRA AMP B.2.3.43, Electrical Cable Connections Not Subject to 10 CFR 50.49 EQ Requirements Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: loose connection, cable connection, increased resistance, discoloration, thermography, thermal cycling, ohmic heating, vibration, chemical contamination, corrosion, and oxidation.
The table below lists the documents that were reviewed by the staff and were found relevant to the Electrical Cable Connections Not Subject to 10 CFR 50.49 Requirements. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 01612567 An overheated connection was found in the U3 screen wash pump starter (breaker cubicle 30913, MCC 3E). Thermography shows a significant hot spot on "C" phase (over a 100 degree delta in temperature.
01/26/2011 AR 1636437 Thermography survey performed on 4B EDG electrical cabinet (4E04B) identified a bolted connection measuring approximately 199 F, approximately 55 F above the reference temperature. Based on this inspection, it was determined that the cable is in good condition and does not show any signs of degradation. It is recommended to schedule corrective maintenance during the upcoming 4B CMM window scheduled for June 07, 2011.
04/01/2011 AR 01729836 During 3A EDG monthly surveillance run, Pdm identified terminal connection TBVR-21 (cabinet 3E04A) which is associated with the 3A EDG TP2 Test Block on the voltage regulator circuitry at 13 F hotter than reference wires. Thermography was taken while the EDG was 100%
loaded. Replace/repair during regular maintenance schedule.
01/31/2012 AR 1740358 Thermography survey on 3A RCP 4.16 kV electrical penetration conductor inside containment identified a thermal anomaly on the B phase. CR 2009-13852 (AR 466049466049 was initiated. The B phase indicated approximately 167F, 42F above the reference phase. The condition was evaluated and it was determined that no immediate corrective actions were required. A potential exists that the indicated temperature on the surface of the ceramic insulator was due to indirect
/internal heating and the actual heat source could be 55F to 70F higher than indicated.
03/02/2012 SLRA AMP B.2.3.44, High-Voltage Insulators Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: insulator, thermography, corona, high voltage, arcing, silicone rubber, and switchyard.
The table below lists the documents that were reviewed by the staff and were found relevant to the High-Voltage Insulators program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience are documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00469461 More than 1,700 High Critical Component Failure (HCCF) events and failure reports from 2007 and 2008 were analyzed by the Industry's Equipment Reliability Working Group (ERWG). Ensure transformer high voltage bushings are included in PM templates. Ensure transformer high voltage bushings are being routinely monitored for degradation or leakage. Ensure action has been taken to prevent animal intrusion into key switchyard components.
03/11/2010 AR 01889530 IER L3-13 Automatic Reactor Scram Following a 500-kV Insulator Flashover. Lessons learned: 1. Ensure the Electrical Engineering staff fully understands the limitations of polymer insulators in high contamination environments, and include proper specification, inspection, and maintenance activities in their design and selection.
Ensure the design review includes evaluation of equivalent salt deposit density (ESDD) and non-soluble deposit density (NSDD) contamination levels at installed locations of high-voltage equipment. Ensure specifications for bushing and insulator design changes include an evaluation of local environmental conditions and that they meet the appropriate contamination designation, such as, heavy contamination.
01/16/2013 AR 1726913 During discussion of impacts on AR 01726618, 3B HDP motor dirty filters, the Initial Screening Team determined there may be negative impacts on the switchyard insulators and main, aux, C-BUS and Start Up transformers due to road dust accumulations on insulators. Recommend Site Area Operations ensure that insulators are not impacted by road dust.
01/23/2012 SLRA AMP B.2.4.1 Pressurizer Surge Line Fatigue Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: surge line, through wall, thermal, pressurizer, fatigue, cracking, leakage, failure, and weld.
The table below lists the documents that were reviewed by the staff and were found relevant to the Pressurizer Surge Line Fatigue program. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document Description Revision / Date 00417806 Insurge During Pressurizer Bubble Collapse (Unit 4) 04/11/2005 00514901 Problem with Oxygen Removal from the Pressurizer (Unit 4) 05/05/2008 00453780 PCV-4-455A Pressurizer Spray Valve Has An Active Packing Leak (Unit
- 4) 04/30/2008 02102753 Current Procedures Do Not Count Pressurizer Fatigue Cycles 01/14/2016 02130519 RCS/Pressurizer Pressure Oscillating (Unit 3) 05/8/2016 SLRA AMR Further Evaluation (3.6.2.2.3) - Transmission Conductors, Switchyard Bus, and Connections LRA Table 3.6.2 item corresponding to LRA Table 3.6.1-4, transmission conductors composed of aluminum, steel and steel alloy exposed to air-outdoor LRA Table 3.6.2 item corresponding to LRA Table 3.6.1-5, transmission connectors composed of aluminum, steel and steel alloy exposed to air-outdoor LRA Table 3.6.2 item corresponding to LRA Table 3.6.1-6, transmission switchyard bus and connections composed of aluminum, steel and steel alloy exposed to air-outdoor LRA Table 3.6.2 item corresponding to LRA Table 3.6.1-7, transmission conductors composed of aluminum, steel and steel alloy exposed to air-outdoor Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: transmission conductor - loss of strength - corrosion, transmission connectors - oxidation - loss of preload, switchyard buses, transmission conductor, loss of preload, increased resistance of connection due to oxidation, and wind induced abrasion. No significant plant-specific operating experience associated with the transmission conductors and switchyard buses was noted by the staff during its review.
SLRA AMP TLAA Section 4.3.1 Metal Fatigue of Class 1 Components, 4.3.2 Metal Fatigue of Piping Components, and 4.3.3 Environmentally Assisted Fatigue Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: design cycles, CUF, EAF and fatigue cracking.
No significant plant specific operating experience associated with the TLAA Section 4.3.1 through 4.3.3 was noted by the staff during its review.
SLRA TLAA Section 4.3.4, Reactor Vessel Underclad Cracking Audit Activities. The staff conducted an independent search of the applicants operating experience database using various combinations of the keywords: reactor vessel, RPV, cladding, crack, and flaw.
No significant plant-specific operating experience associated with TLAA Section 4.3.4, Reactor Vessel Underclad Cracking, was noted by the staff during its review.
SLRA TLAA Section 4.3.5, Reactor Coolant Pump Flywheel Audit Activities. The staff conducted an independent search of the applicants operating experience database using the keyword: flywheel.
No significant plant-specific operating experience associated with TLAA Section 4.3.5, Reactor Coolant Pump Flywheel, was noted by the staff during its review.
SLRA TLAA Section 4.5, Concrete Containment Tendon Prestress Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: Liftoff, Force, Trending, and Tendon Surveillance.
The table below lists the documents that were reviewed by the staff and were found relevant to the LRA Section TLAA Section 4.5, Concrete Containment Tendon Prestress. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 00438310 High As-Found Liftoff Forces, Tendon 12V06 of U3 (Force> 70% GUTS) 03/02/2007 AR 00482549 Unable to Achieve Liftoff on Tendon 56V20 of U4 01/26/2007 AR 01747712 Vertical Tendon (34V08) of U3, Unable to be Stressed to Overstress Force 03/22/2012 AR 01748216 Dome Tendon (1D12) of U3, Unable to be Stressed to Overstress Force 03/24/2012 AR 01751146 Horizontal Tendon (42H26) of U3, Unable to be Stressed to 80%
Overstress 04/02/2012 AR 02190686 Results of U4 During 45th Year Tendon Surveillance 03/10/2017 AR 00437147 Buttonheads Missing from Tendon Number 13H31 of U3 (Calculation of Lift-Off Forces/Trending) 01/30/2007 SLRA TLAA 4.6, Containment Liner Plate, Metal Containments, and Penetrations Fatigue Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: corros, crack, struct, steel, and liner.
The table below lists the documents that were reviewed by the staff and were found relevant to the Structures Monitoring Program. These documents were identified in the staffs search of the applicants operating experience database. The results of the review of relevant operating experience is documented in the In-Office Audit Report.
Relevant Documents Reviewed Document Title Revision / Date AR 02090843 IWE liner examination - various areas of degradation identified 11/12/2015 SLRA TLAA Section 4.7.6, Crane Load Cycle Limit Audit Activities. The staff conducted an independent search of the applicants operating experience database using keywords: crane, crack, fatigue, cycle, defor, and deflect.
No significant plant-specific operating experience associated with the TLAA Section 4.7.6, Crane Load Cycle Limit, was noted by the staff during its review.
- 3. Applicant Personnel Contacted During Audit PARTICIPANTS ORGANIZATION Bill Maher Florida Power & Light Company (FPL)
Paul Jacobs FPL Terry McCool FPL Brian Messitt FPL Rick Orthen FPL Steve Franzone FPL Chris Louison FPL James V. Wicks Enercon Jeffrey Head Enercon Aaron Halstrom Enercon Stephen Hale Enercon Jared Monroe Enercon Joanne Morris Enercon Tony Ploplis Enercon
- 4. Exit Meeting An exit meeting was held with the applicant on May 18, 2018, to discuss the results of the operating experience audit. The staff may issue requests for additional information to support completion of the staffs SLRA review