MONTHYEARML17153A2852017-05-25025 May 2017 License Renewal Application Project stage: Other ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application Project stage: Other ML17156A0932017-06-20020 June 2017 Receipt and Availability of the License Renewal Application for River Bend Station, Unit 1 Project stage: Other ML17186A1592017-07-10010 July 2017 License Renewal Application - Supplemental Information Needed for Acceptance of Requested Licensing Action, Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 Project stage: Acceptance Review ML17180A0772017-07-27027 July 2017 Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 Project stage: Other ML17157B3672017-07-31031 July 2017 License Renewal Application Online Reference Portal Project stage: Other ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 Project stage: Meeting ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 Project stage: Meeting ML17187A0352017-08-0707 August 2017 Determination of Acceptability and Sufficiency for Docketing and Proposed Review Schedule Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 (CAC No. MF9747 and MF9778 Project stage: Other ML17180A1362017-08-0909 August 2017 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17187A0372017-08-0909 August 2017 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17173A1332017-08-0909 August 2017 FRN River Bend Acceptability for Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene Project stage: Request ML17240A3322017-09-0707 September 2017 License Renewal Application Review Status Letter (CAC No. MF9747 and MF9778) Project stage: Other ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 Project stage: Meeting ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review Project stage: Other ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17293A6152017-10-19019 October 2017 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A Project stage: Approval ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17348B1672018-01-0404 January 2018 Status Letter - December Project stage: Other ML18002A3692018-01-0808 January 2018 Extension Letter Request Response Project stage: Other ML18233A1822018-08-23023 August 2018 License Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778) Project stage: Acceptance Review 2017-07-27
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML22231B1762022-09-0707 September 2022 Pre-Submittal Meeting - 10 CFR 50.69 and TSTF-505 License Amendment Requests (EPID L-2022-LRM-0065) (Slides) ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21314A0642021-11-10010 November 2021 Pre-submittal Presentation: River Bend Nuclear Station, Unit 1 Relief Request to Adopt Performance Based Testing for Pressure Isolation Valves (Pivs); November 10, 2021 ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21266A1122021-08-16016 August 2021 August 16 Predecisional Enforcement Conference Redacted License Slide - September 22, 2021 ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A0022021-01-25025 January 2021 Public Meeting Slides - River Bend Waste LAR Pre-Sub 1-25-2021 ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20262H2662020-09-22022 September 2020 Pre-Submittal Meeting - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to COVID-19 Pandemic ML19346C9042019-12-17017 December 2019 Pre-Submittal Meeting - Proposed License Amendment Request - Incorporate Tornado Missile Risk Evaluator (TMRE) Into the River Bend Licensing Basis December 17, 2019 ML18283B9402018-09-13013 September 2018 Revised Proprietary Identification for Gnf Pre-Submittal Meeting Presentation on River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18275A2722018-09-13013 September 2018 Enclosure 2 - River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18228A7432018-08-23023 August 2018 Pre-Submittal Meeting Proposed License Amendment Request Spent Fuel Pool Neutron Absorber Inserts and Criticality Safety Analysis ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17283A3102017-10-12012 October 2017 10/12/2017, Meeting Slide Regarding NRC Pre-application Meeting River Bend Station Spent Fuel Pool Inserts and Criticality Safety Analysis ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 ML17249A2502017-09-0606 September 2017 Updated Entergy Handout for River Bend and NRC Public Conference Call on September 11, 2017, to Discuss Technical Specification Task Force Traveler 542 ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 ML17142A3552017-05-25025 May 2017 05/25/2017 River Bend Station (RBS) License Renewal Application (LRA) NRC Presentation ML17074A3522017-03-29029 March 2017 3/29/2017, Entergy Presentation for River Bend Station Pre-submittal Meeting for Control Building Air Conditioning New Technical Specification License Amendment ML16119A3422016-04-28028 April 2016 Summary of Regulatory Conference to Discuss Safety Significance of River Bend Station Control Building Chilled Water System Apparent Violation ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1134706402011-12-13013 December 2011 Predecisional Enforcement Conference Summary NRC Investigation Report 4-2010-064 ML1117901522011-05-20020 May 2011 Summary of Annual Performance Assessment Meeting for River Bend Station ML1032601252010-11-19019 November 2010 Presentation Slides for the RBS Decommissioning Pec Public Meeting ML1029403512010-10-19019 October 2010 10/182010 Summary of Public Meeting with Entergy Operations to Discuss Initiatives to Improve Plant Reliability ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0920907732009-07-28028 July 2009 July 28, 2009 Meeting Slides from Entergy Operations(River Bend Station) to Discuss Ri ISI ML0719002022007-07-0909 July 2007 Summary of Meeting with Entergy Operations, Inc., Regarding Discussion of River Bend Station Plans for Improving Human Performance and Corrective Action Program ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0607204302006-03-0101 March 2006 March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0514501982005-05-25025 May 2005 Summary of Annual Performance Assessment Meeting for River Bend Station ML0510304092005-04-13013 April 2005 Summary of Meeting with Entergy Operations, Inc. River Bend Station Performance and Improvement Initiatives ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0318902592003-07-0202 July 2003 Summary of Regulatory Conference with Entergy Operations, Inc. River Bend Station ML0314003602003-04-17017 April 2003 Meeting Summary for Annual Performance Assessment for River Bend Station 2023-12-14
[Table view] |
Text
License Renewal Pre-Application Coordination Meeting #1 River Bend Nuclear Generating Station, Unit 1 (RBNGS 1)
April 25, 2017 Emmanuel Sayoc, Safety Review Project Manager 1
Agenda
- Application requirements overview
- Staff recommendations overview
- Logistical considerations
- Application of lessons learned
- Second Pre-application coordination meeting overview 2
Contact Information Safety Project Manager Emmanuel Sayoc (301) 415-4084 emmanuel.sayoc@nrc.gov Environmental Project Manager TBD 3
License Renewal Process Environmental Consultation Review & Comment License Renewal NRC Renewal Application Hearings*
Decision Submitted to NRC Safety Review by Review ACRS
- If a Request for Hearing is Granted 4
Safety Review Application Safety Evaluation Onsite Accepted and Audits Inspections by NRC Safety Evaluation ACRS Meeting NRC Decision Report Issued Hearings 5
Environmental Review Application Public Scoping Prepare Draft Accepted Meeting EIS by NRC Public Comment Issue Draft Address Public Meeting on EIS for Comments Draft EIS Public Comment Prepare and Issue Hearings Record of Decision Final EIS 6
The Application &
Supporting Documents
- Letter to the Document Control Desk with a CD application
- The Application and Appendices o 3 hard copies o 50 CDs with Application and Appendices w/
active links, FSAR, Drawings
- Drawings o 1 CD o 4 hard copy 18x22 w/ no SGI
- AMR table 2 items in MS Excel file 7
Logistical Considerations
- NRC requests recommendations and contact info for the following:
o Public Meeting Venue o Public Libraries o Local Publications and News Papers o Hotel and Lodging
Application Overview NRC requests a brief on the application:
- Application main sections
- Break Down o New or existing o Consistent o Exceptions o Enhancements o Plant specific
- Time Limited Aging Analysis (TLAA) 9
Site Information
- Major plant modifications that could affect the safety or environmental review
- Identify the 15 most risk significant systems/components 10
Lessons Learned NRC requests that Entergy incorporate procedural and logistical lessons learned
- Communication with corporate and site organizations
- RAI content and logistics 11
Lessons Learned Review safety technical issues from previous applications, apply lessons learned:
- Fluence levels and modeling
- Concrete alkali-silica reaction
- Selective leaching of aluminum bronze
- Condition of reactor vessel head closure studs 12
Lessons Learned Review safety technical areas of interest in previous applications, apply lessons learned (as applicable):
- Electrical cables water submerged in underground manholes
- Boraflex degradation in spent fuel pool storage
- Containment liner degradation
- Insufficient small bore weld inspection sample sizes
- Insufficient environmentally-assisted fatigue methodology
- Insufficient description, Reactor Vessel Surveillance AMP
- Insufficient TLAAs on RPV materials not in beltline
- Insufficient description, EQ of electrical cables AMP
- Insufficient description, bolting integrity (air filled sys.) AMP 13
Review Schedule
- Provide regular updates on application submission
- Nominal review schedule - 22 months (no hearings)
- Staff is working on optimization initiatives in schedule and safety evaluation report development
- Safety and Environmental PMs will provide a schedule 14
Next Meeting Coordination Meeting #2 (May 2017)
- Public meeting o HQ PM and technical staff o Licensee o Regional and Resident Staff
- Licensee to provide overview of application and items from this meeting 15
Questions?
16