ML18219A101

From kanterella
Jump to navigation Jump to search
Comment (D) E-mail Regarding T.P. 3&4 SLR EIS Scoping
ML18219A101
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/2018
From: White S
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
NRC/NRR/DMLR
References
83FR23726, L-2018-LNE-0001
Download: ML18219A101 (1)


Text

From: swhite1960@everyactioncustom.com To: TurkeyPoint34SLREIS Resource

Subject:

[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL"s Turkey Point)

Date: Tuesday, July 17, 2018 5:52:51 PM

Dear NRC Staff,

As a resident of South Florida, I am very concerned about the operation of Turkey Point until the early 2050s, especially since the plant is already contaminating nearby resources such as Biscayne Bay National Park and threatening our regions drinking water resources.

I request that the NRC independently evaluate the pollution leaking from the cooling canal system and study alternative cooling technologies that could protect the environment, such as the installation of cooling towers, which are already used for the natural gas plant onsite (Unit 5) and were approved by the NRC for use at the proposed new Turkey Point reactors (Units 6 & 7) that are unlikely to ever be built.

The NRC needs to be aware that Turkey Point and the area around it has already experienced the negative effects of sea level rise and storm surges. The NRC needs to study a range of sea level rise projections and consider those impacts on the plant, the cooling canal system, and the surrounding community, including for emergency evacuation procedures and planning.

Thank you.

Sincerely, Susan White 58 Shoreland Dr Key Largo, FL 33037-4753