| Start date | Site | Title |
---|
ML24311A187 | 7 November 2024 | Summer | V.C. Summer EDG SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0 |
CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 | 9 October 2024 | Browns Ferry | Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 |
ML24241A006 | 28 August 2024 | Braidwood | Attachment 1: Braidwood Generating Station - Form OAR-1 Owners Activity Report |
IR 05000335/2024002 | 13 August 2024 | Saint Lucie | Integrated Inspection Report 05000335-2024002 and 05000389-2024002 |
IR 05000298/2024002 | 25 July 2024 | Cooper | Integrated Inspection Report 05000298/2024002 |
05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping | 2 July 2024 | Beaver Valley | Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping |
05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function | 27 June 2024 | South Texas | Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function |
ML24135A081 | 14 May 2024 | Millstone | 5/16/2024, Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides |
IR 05000335/2024001 | 10 May 2024 | Saint Lucie | Integrated Inspection Report 05000335/2024001 and 05000389/2024001 |
IR 05000338/2024001 | 10 May 2024 | North Anna | Integrated Inspection Report 05000338/2024001 and 05000339/2024001 |