Letter Sequence Other |
---|
|
Results
Other: ML17153A285, ML17153A286, ML17156A093, ML17157B367, ML17180A077, ML17187A035, ML17240A332, ML17262A200, ML17269A051, ML17278A775, ML17279A874, ML17284A100, ML17298B174, ML17348B167, ML18002A369
|
MONTHYEARML17153A2852017-05-25025 May 2017 License Renewal Application Project stage: Other ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application Project stage: Other ML17156A0932017-06-20020 June 2017 Receipt and Availability of the License Renewal Application for River Bend Station, Unit 1 Project stage: Other ML17186A1592017-07-10010 July 2017 License Renewal Application - Supplemental Information Needed for Acceptance of Requested Licensing Action, Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 Project stage: Acceptance Review ML17180A0772017-07-27027 July 2017 Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 Project stage: Other ML17157B3672017-07-31031 July 2017 License Renewal Application Online Reference Portal Project stage: Other ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 Project stage: Meeting ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 Project stage: Meeting ML17187A0352017-08-0707 August 2017 Determination of Acceptability and Sufficiency for Docketing and Proposed Review Schedule Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 (CAC No. MF9747 and MF9778 Project stage: Other ML17180A1362017-08-0909 August 2017 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17187A0372017-08-0909 August 2017 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17173A1332017-08-0909 August 2017 FRN River Bend Acceptability for Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene Project stage: Request ML17240A3322017-09-0707 September 2017 License Renewal Application Review Status Letter (CAC No. MF9747 and MF9778) Project stage: Other ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 Project stage: Meeting ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review Project stage: Other ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17293A6152017-10-19019 October 2017 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A Project stage: Approval ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17348B1672018-01-0404 January 2018 Status Letter - December Project stage: Other ML18002A3692018-01-0808 January 2018 Extension Letter Request Response Project stage: Other ML18233A1822018-08-23023 August 2018 License Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778) Project stage: Acceptance Review 2017-07-27
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 2023-10-06
[Table view] Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 10, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 Entergy Operations, Inc.
5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
PLAN FOR THE AGING MANAGEMENT PROGRAM REGULATORY AUDIT REGARDING THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF9747)
Dear Mr. Maguire:
By letter dated May 25, 2017, Entergy Operations, Inc. (Entergy) submitted an application for Renewal of Operating License No, NPF-47 for the River Bend Station, Unit 1 (RBS). The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.
The staff plans to conduct its Aging Management Program Regulatory Audit remotely from NRC headquarters offices (in-office audit) from October 16, 2017 through November 3, 2017, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me by telephone at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov.
Sincerely,
/RA Albert Wong for/
Emmanuel Sayoc, Project Manager License Renewal Project Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
Audit Plan cc w/encl: Listserv
ML17269A051 OFFICE PM:MRPB DMLR LA:MRPB:DMLR PM:MRPB:DMLR NAME ESayoc (Albert Wong for) YEdmonds BRogers DATE 10/6/2017 10/6/2017 10/6/2017 OFFICE BC:MRPB:DMLR (A) PM: MRPB DMLR NAME WBurton ESayoc (Albert Wong for)
DATE 10/6/2017 10/10/2017
Audit Plan Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE
License Renewal Aging Management Program Regulatory Audit Plan River Bend Station, Unit 1
- 1. Background By letter dated May 25, 2017, Entergy Operations, Inc. (Entergy), submitted to the U.S. Nuclear Regulatory Commission (NRC or the staff) its application for Renewal of Operating License No.
NPF-47 for the River Bend Station, Unit 1 (RBS). RBS requested renewal of the operating license for an additional 20 years beyond the 40-year current license term, which expires on August 29, 2025. The staff from the Division of Materials and License Renewal will lead a regulatory audit to gain a better understanding of Entergys aging management programs (AMPs), aging management review (AMR) items, Time-Limited Aging Analyses (TLAA) and associated bases and documentation as applicable.
- 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, and NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010.
- 3. Regulatory Audit Scope The scope of this regulatory audit is to: (a) examine Entergys AMPs, AMR items, and TLAAs for RBS; and (b) verify Entergys claims of consistency with the corresponding GALL Report AMPs, and AMR items, and (c) assess the adequacy of the TLAAs. Enhancements and exceptions will be evaluated on a case-by-case basis. The staffs review of enhancements and exceptions will be documented in the safety evaluation report.
During this audit, the staff will audit Program Elements 1 - 6 (scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria), and Program Element 10 (operating experience) of the applicants AMPs against the elements of the associated AMP described in the GALL Report. Program Elements 7 - 9 (corrective actions for general recommendations such as compliance with Appendix B, confirmation process, and administrative controls) are audited by another NRC project team during the scoping and screening methodology audit, and are evaluated separately. In addition, the staff will verify that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated.
The staff will also examine the applicants program bases documents and related references for AMPs, AMR items, and TLAAs, perform selected in-plant walkdowns, and interview applicant representatives to obtain additional clarification.
The staff will use risk insights to inform the prioritization of its review of documentation associated with AMPs, AMR items, and TLAAs. The staff will use risk insights to focus the breadth and depth of its review of plant specific operating procedures and operating experience.
However, the staffs review is not limited to risk significant systems and components because 10 CFR Part 54 is a deterministic rule and the staff must conclude that there is reasonable
assurance that activities will continue to be conducted in accordance with the current licensing basis and the effects of aging will be managed during the period of extended operation for all structures and components within the scope of Part 54.
The staff has reviewed the list of risk significant systems and components (from PRA, Revision
- 5) provided in a presentation to the staff on May 25, 2017. The staff augmented this list with the fire protection and fire water systems because they are typically risk significant when considering external events.
- 4. Information and Other Material Necessary for the Regulatory Audit The project team will review the license renewal application, the AMP basis documents and other Entergy supporting documents as appropriate.
For the in-office audit October 16, 2017 - November 3, 2017:
- The project team would like continued Entergy document review capability via the CERTREC document portal. Document requests for upload to the portal shall be made as needed via the NRC safety project manager to the appropriate Entergy licensing manager.
- The NRC staff would like to hold break-out sessions, via telephone conference calls and/or official internet based desktop sharing means, with Entergy and RBS subject matter experts to discuss various basis documents, references, condition/corrective action reports, and interview Entergy representatives to obtain additional clarification related to the license renewal review. Break-out sessions for various technical review areas will occur at predesignated time slots during the audit, with preassigned NRC and Entergy representatives. NRC staff will provide discussion topics and technical requests/questions to the NRC safety project manager, who will then relay the information to the Entergy licensing manager. All break-out sessions will be coordinated via the NRC safety project manager and the Entergy licensing manager.
- 5. Team Assignments Assigned Auditor Area of Review Emmanuel Sayoc Project Manager James Gavula Chemistry and Corrosion Brian Allik Chemistry and Corrosion William Gardner Chemistry and Corrosion Alan Huynh Chemistry and Corrosion Sadollah Mohammed Electrical Duc Nguyen Electrical William Holston Mechanical and Materials Aaron Mink Mechanical and Materials Bart Fu Mechanical and Materials Mark Yoo Mechanical and Materials James Medoff Mechanical and Materials Seung Min Mechanical and Materials Naeem Iqbal Mechanical and Materials Amrit Patel Mechanical and Materials Angela Buford Structural Juan Lopez Structural Andrew Prinaris Structural Samuel Cuadrado DeJesus Structural Bryce Lehman Structural George Thomas Structural Dan Hoang Structural
- 6. Logistics The regulatory audit will be conducted with an in-office (at NRC HQ) audit portion from October 16, 2017 through November 3, 2017. Entrance and exit briefings will be held at the beginning and end of the in-office audit. Status calls during the in-office (at NRC HQ) audit will take place weekly.
- 7. Special Requests The staff requests the applicant to make available the license renewal application program basis documentation and license renewal drawings (hard copy), and their condition report database (electronic version access) for independent searches by the regulatory audit team. Electronic copies of the Key-word Search Results should be made available for the staffs use. Applicant personnel responsible for or involved with the various programs should also be available.
- 8. Deliverables An audit report should be issued to Entergy within 90 days from the end of the audit.