Letter Sequence Other |
---|
|
Results
Other: ML17153A285, ML17153A286, ML17156A093, ML17157B367, ML17180A077, ML17187A035, ML17240A332, ML17262A200, ML17269A051, ML17278A775, ML17279A874, ML17284A100, ML17298B174, ML17348B167, ML18002A369
|
MONTHYEARML17153A2852017-05-25025 May 2017 License Renewal Application Project stage: Other ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application Project stage: Other ML17156A0932017-06-20020 June 2017 Receipt and Availability of the License Renewal Application for River Bend Station, Unit 1 Project stage: Other ML17186A1592017-07-10010 July 2017 License Renewal Application - Supplemental Information Needed for Acceptance of Requested Licensing Action, Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 Project stage: Acceptance Review ML17180A0772017-07-27027 July 2017 Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 Project stage: Other ML17157B3672017-07-31031 July 2017 License Renewal Application Online Reference Portal Project stage: Other ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 Project stage: Meeting ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 Project stage: Meeting ML17187A0352017-08-0707 August 2017 Determination of Acceptability and Sufficiency for Docketing and Proposed Review Schedule Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 (CAC No. MF9747 and MF9778 Project stage: Other ML17180A1362017-08-0909 August 2017 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17187A0372017-08-0909 August 2017 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17173A1332017-08-0909 August 2017 FRN River Bend Acceptability for Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene Project stage: Request ML17240A3322017-09-0707 September 2017 License Renewal Application Review Status Letter (CAC No. MF9747 and MF9778) Project stage: Other ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 Project stage: Meeting ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review Project stage: Other ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17293A6152017-10-19019 October 2017 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A Project stage: Approval ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17348B1672018-01-0404 January 2018 Status Letter - December Project stage: Other ML18002A3692018-01-0808 January 2018 Extension Letter Request Response Project stage: Other ML18233A1822018-08-23023 August 2018 License Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778) Project stage: Acceptance Review 2017-07-27
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 2023-10-06
[Table view] Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 2024-09-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 2017 Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 Entergy Operations, Inc.
5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
PLAN FOR THE OPERATING EXPERIENCE REVIEW AUDIT REGARDING THE RIVER BEND STATION UNIT 1, LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF9747)
Dear Mr. Maguire:
By letter dated May 25, 2017, Entergy Operations, Inc. (Entergy) submitted an application for renewal of operating license NPF-47 for the River Bend Station, Unit 1. The staff of the U.S.
Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants.
The staff plans to conduct its Operating Experience Review at the Nuclear Energy Institute office in Rockville, Maryland from October 2, 2017, through October 13, 2017, in accordance with the enclosed operating experience review audit plan. If you have any questions, please contact me by telephone at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov.
Sincerely,
/RA/
Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Audit Plan
- 2. Audit Needs List cc w/encl: Listserv
ML17262A200 OFFICE PM:RPGB:DLR LA:RPGB:DLR PM:RCCB:DLR NAME ESayoc YEdmonds BRogers DATE 9/25/2017 9/21/2017 9/25/2017 OFFICE BC: RPGB:DLR BC: RCCB:DLR PM:RPGB:DLR NAME SStuchell SBloom ESayoc DATE 9/25/2017 9/25/2017 9/25/2017
Audit Plan Plan For The Operating Experience Review Audit Regarding The River Bend Station Unit 1, License Renewal Application October 2-13, 2017 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Enclosure 1
Plan For The Operating Experience Review Audit Regarding The River Bend Station Unit 1, License Renewal Application
- 1. Background The NRC staff performs an independent review of plant specific operating experience to identify examples of age related degradation, as documented in the applicants corrective action program database. These activities are performed as part of the staffs review of the River Bend Station (RBS) license renewal application.
- 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (10 CFR), Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.
Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, and NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010.
- 3. Regulatory Audit Scope The scope of this license renewal regulatory audit of RBS is the staffs independent review of plant specific operating experience. The review is performed to identify pertinent examples of age related degradation, as documented in the applicants corrective action program database. The results of the audit will be used to support the staffs further review of aging management programs (AMP), time limited aging analyses (TLAAs) and aging management review line items to provide a basis for the staffs conclusions on the ability of the applicants proposed AMP and TLAAs to manage the effects of aging in the period of extended operation.
The staff will use risk insights to focus the breadth and depth of its review of plant specific operating experience. However, the staffs review is not limited to risk significant systems and components because 10 CFR Part 54 is a deterministic rule. The staff must conclude that there is reasonable assurance that activities will continue to be conducted in accordance with the current licensing basis and the effects of aging will be managed during the period of extended operation for all structures and components within the scope of 10 CFR Part 54.
- 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List
- 5. Team Assignments Area of Review Assigned Auditors Documentation of plant specific operating Allik, Brian experience as described in the River Bend Chereskin, Alexander Station corrective action program database. Fu, Bart Disciplines include mechanical, materials, Gavula, James structural, electrical and systems. Holston, William Lehman, Bryce Medoff, James Mink, Aaron Nold, David Prinaris, Andrew Sadollah, Mohammad Sun, Summer Wong, Albert Yoo, Mark Buford, Angela Cuadrado de Jesus, Samuel Gardner, William Hoang, Dan Huynh, Alan Lopez, Juan Min, Seung Nguyen, Duc Otto, Ngola Rogers, Billy Sayoc, Emmanuel Thomas, George Yoder, Matthew Steve Jones
- 6. Logistics The audit will be conducted on location at the Nuclear Energy Institute office, located in Rockville, Maryland, from of October 2 through October 13, 2017. Entrance and exit briefings will be held at the beginning and end of this audit, respectively.
- 7. Special Requests The staff requests River Bend to provide electronic access to Entergy information, as discussed in the Audit Needs List. The NRC staff requests a suitable facility for the audit team to caucus during the audit and to hold meetings between staff and Entergy personnel.
- 8. Deliverables An audit report should be issued to River Bend within 90 days from the end of the audit.
Operating Experience Review for the River Bend Station Unit 1, License Renewal Application Audit Needs List
- 1. Operating Experience Keyword Review Results The staff requests electronic access, using Entergy equipment, to the results of the operating keyword list query of Entergys corrective action database. The results are expected to be in an excel workbook, organized by keywords.
- 2. Corrective Action Program Database The staff requests electronic access, using Entergys equipment, to the Entergys corrective action database to perform independent searches of the database.
- 3. License Renewal Portal The staff requests electronic access, using Entergys equipment, to the license renewal portal.
Enclosure 2