ML18004A066

From kanterella
Jump to navigation Jump to search

Entergy - Anchor Darling Double Disc Gate Valve Information and Status
ML18004A066
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 12/20/2017
From: Halter M
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNR0-2017-00025
Download: ML18004A066 (13)


Text

  • ~Enter~

CNR0-2017-00025 December 20, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.

Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mandy Halter Director, Nuclear Licensing

Subject:

Anchor Darling Double Disc Gate Valve Information and Status Arkansas Nuclear One, Units 1 & 2 Docket Nos. 50-313 & 50-368 License Nos. DPR-51 & NPF-6 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Waterford 3 Steam Electric Station Docket No. 50-382 License No. NPF-38 Indian Point Energy Center, Units 2 & 3 Docket Nos. 50-247 & 50-286.

License Nos. DPR-26 & DPR-64 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35

References:

1) Letter from Greg Krueger (NEI) to John Lubinski (U.S. Nuclear Regulatory Commission), Anchor Darling Double Disc Gate Valve Industry Resolution Plan Update (Project 689), dated August 4, 2017
2) Letter from Joe Pollock (NEI) to Brian Holian (U.S. Nuclear Regulatory Commission), NSIAC Concurrence on Anchor Darling Double Disc Gate Valve Industry Response Actions (Project 689), dated October 26, 2017
3) BWROG Topical Report TP-16-1-112, Revision4, Recommendations to

Dear Sir or Madam:

In Reference 1, the Nuclear Energy Institute (NEI) provided the NRC a resolution plan for the U.S. Nuclear Industry to address the known Anchor Darling Double Disk Gate Valve (ADDDGV) issues. Reference 2 indicated each utility will provide a listing of their Anchor Darling valve population with active safety functions along with relevant valve information, including the results of susceptibility evaluations, repair status, and a repair schedule for each susceptible valve not yet repaired. This letter serves to provide this information for Entergy Operation, Inc.

and Entergy Nuclear Operations, Inc.

_4,0 D (

rJf<{(_

CNR0-2017-00025 Page 2 of 3 The Attachment 1 to this letter contains the following information for each ADDDGV.

Plant Name, Unit, and Valve ID.

System.

Valve Functional Description.

Valve Size.

Active Safety Function (open, close, both).

Are multiple design basis post-accident strokes required? (yes/no).

Expert Panel Risk Ranking (high, medium, low).

Result of susceptibility evaluation (susceptible or not susceptible).

Is the susceptibility evaluation in general conformance with TP 16-1-112R4 (Reference 3)?

Does the susceptibility evaluation rely on thread friction? If yes, was the coefficient of friction greater than 0.1 O? For cases where thread-friction was relied upon, information is provided whether the coefficient of friction was above or below 0.1.

Was an initial stem-rotation check performed? If yes, include rotation criteria (i.e. s1 O degrees or S5 degrees).

Was the diagnostic test data reviewed for failure precursors described in TP16-1-112R4 (Reference 3)?

The valve's repair status (i.e. repaired or not repaired).

A repair schedule for each susceptible valve.

The Attachment 2 to this letter contains footnotes associated with each valve and commitments for repair of the applicable valves.

This letter also serves to confirm that Palisades Nuclear Plant does not use ADDDGVs to support any active safety function.

Should you have any questions or require additional information, please contact Mr. John Giddens, Senior Manager, Regulatory Assurance, at (601) 368-5756.

Respectfully,

/JltU?f !%ffi1 Mandy Halter Director, Nuclear Licensing MH/jjn/gpn Attachments: 1) Entergy Response to Anchor Darling Double Disk Gate Valve Part 21

2) Licensing Commitments and Notes cc: C. Bakken (ECH)

J. Elnitsky (ECH)

CNR0-2017-00025 Page 3 of 3 J. Ventosa (ECH)

C. Costanzo (ECH)

L. Coyle (ECH)

D. Jacobs (ECH)

L. Martin (ECH)

R. Anderson (ANO)

E. Larson (GGNS)

W. Maguire (RBS)

J. Dinelli (WF3)

T. Vitale (IPEC)

B. Sullivan (PIL)

C. Arnone (PAL)

J. Boyle (VY)

B. Ford (ECH)

J. Giddens (ECH)

All above w/o attachments NRC Region I Administrator NRC Region Ill Administrator NRC Region IV Administrator NRC Project Manager (ANO)

NRC Project Manager (GGNS)

NRC Project Manager (RBS)

NRC Project Manager (WF3)

NRC Project Manager (IPEC)

NRC Project Manager (PIL)

NRC Project Manager (PAL)

NRC Senior Resident Inspector (ANO)

NRC Senior Resident Inspector (GGNS)

NRC Senior Resident Inspector (RBS)

NRC Senior Resident Inspector (WF3)

NRC Senior Resident Inspector (IPEC)

NRC Senior Resident Inspector (PIL)

NRC Senior Resident Inspector (PAL)

Ms. Margaret O'Banion, Project Manager, NRC/NRR/DORL

ATTACHMENT 1 CNR0-2017-00025 ENTERGY ANCHOR DARLING DOUBLE DISK GATE VALVE LISTING to CNR0-2017-00025 Page 1 of 3 Plant Name ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO GGN GGN GGN GGN IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC Unit#

1 1

1 1

1 1

1 1

1 1

1 i

1 1

1 1

1 2

2 2

2 1

1 1

1 2

2 2

2 2

2 2

2 2

2 Valve ID System CV-2827 FW CV-1009 RCS CV-1213 RCS CV-1214 MU CV-1215 RCS CV-1216 MU CV-1221

  • MU CV-1233 MU CV-1234 MU CV-2215 ICW CV-2220 ICW CV-2221 ICW CV-2235 ICW CV-2625 FW CV-2630 FW CV-2675 FW CV-2680 FW 2CV-4653 RCS 2CV-4654 RCS 2CV-4655 RCS 2CV-4656 RCS 1B33F023A RECIRC 1B33F023B RECIRC 1833F067A RECIRC 1B33F067B RECIRC 744 RHR 746 RHR 747 RHR 769 ccw 784 ccw 797 ccw 882 SI 1802A SI 18028 SI 850A SI Valve Functional Description FW Crossover lsol.

Pressurizer Spray Isolation LD Ht Ex Inlet LD Ht Ex Inlet lsol.

LD Ht Ex Inlet LD Ht Ex Inlet.lsol.

RCS LD RB lsol.

RCS Makeup Block

  • RCS Makeup Blade ICW to LD. & RB Coolers

. -~. -

ICW to.LO &CRD Coolers ICW to C.RD.Cooler Supply ICW toLD &CRD Coolers..

.. MFW Block MFl/lf lsol.

'MFW Bloc~*

MFWlsol.'

Pressurizer Spray Isolation Pressurizer Spray Isolation Pressurizer Spray Isolation Pressurizer Spray Isolation RECIRC PMP A SUCT VLV RECIRC PMP B SUCT VLV RECIRC PMP A DISCH VLV RECIRC PMP B DISCH VLV RHR PUMPS DISCH TO RESIDUAL HXS ISOLATION RHR HX-22 OUTLET ISOLATION STOP RHR HX-21 OUTLET ISOLATION STOP RCPSTRV SUPPORT C(.W INLET ISOLATION RCPS BEARING WTR RETURN ISOLATION RCPS-RV SUPPORT CCW INLET ISOLATION RHR PUMPS SUCTION FROM RWST 21 RECIRCULATION PUMP DISCHARGE

  • STOP 22 RECIRCULATION PUMP DISCHARGE STOP 21 SAFETY INJECTION PUMP DISCHARGE STOP Are multiple Active design basis Safety Valve Size p9st-accident Function (inches) strokes (0/C/Both/

required?

None)

(yes/no).

14 None No 2.5 None No 2.5 None No 2.5 C

No 2.5 None No 2.5 C

No 2.5 C

No 2.5-C No 2.5 C

No 8

C Nil 8

C No 8

C,.

No

.. '3 t"

  • No 18 C

No 18 C

No 18 C

No 18

c.

No.

None 3

Note 1131 No None 3

Note 1131 No None 3

Note 1131 No None 3

Note 1131 No Ncine 24 Note ISi N/A None 24 Note 151 N/A 24 None N/A 24 None N/A 10 Close No 8

Both Yes 8

Both Yes 6

C No 6

C No 6

C No 10 Close NO 10 Both Yes 10 Both Yes 4

Close No ENTERGY ANCHOR DARLING DOUBLE DISK GATE VALVE LISTING Result of Is the susceptibility Does the For cases where thread-If yes, include Was the diagnostic A repair Expert Panel susceptibility evaluation in general friction was relied upon, test data reviewed for susceptibility If yes, was the Was an initial stem-rotation The valve's repair schedule for Risk Ranking evaluation conformance with information is provided failure precursors evaluation rely on COF greater than

. rotation 'check criteria (i.e.

status (i.e. repaired each (high, (susceptible or TP16-l-112 R4?

whether the coefficient described in thread friction?

0.10 (Yes/No) performed (Yes/No) SlO degrees or or not repaired) susceptible medium, low) not (Yes/No) of friction was above or TP16-1-112R4 (Yes/No)

SS degrees) valve susceptible)

Notes <11, t21 er {3J below0.1 (Yes/No)

(Yes/No)

Low Susceptible Yes - Note 131 No N/A N/A Yes - Note 1111

<20° N/A - Note 1121*

Not Repaired*

Spring 2018 In-Progress Low Note 1101 Yes - Note 131 No N/A N/A Yes

<20° Yes Not Repaired Note 1101 Low Susceptible Yes - Note 131*

N/A No N/A Yes

<20° Yes Repaired

'N/A Low In-Progress Yes - Note 131.

No N/A N/A Yes

<20° Yes Not Repaired Note 1101 Note 1101 Low Susceptible Yes - Note 131 No N/A N/A

.Yes

<20° Yes Repaired N/A Low In-Progress Yes - Note 131 No N/A N/A Yes

<20° Yes N_o.t Repaired Note 1101 Note 1101 Low Susceptible Yes - Note 131 N/A No N/A Yes - Note 1111

<20° Yes Repaired N/A Low Susceptible Yes - Note 131 No N/A N/A

_ Yes - Note.1:'1. *

<20° Yes..

Repaired N/A Low Susceptible Yes - Note 131 No N/A N/A Yes - Note 11:1

<20°...

. Yes Repaired N/A Not Yes - Note 131 Yes - Note 1111 *

'<20° Low Susceptible Ni;>

N/A' N/A Yes

  • J\\Jot Required N/A '

Not Y~s - Note 1111 Low Yes - Note 131 No N/A N/A

<20° Yes No.t ljequired.

_N/A Susceptible Not

,,, <20; Low Yes - Note 131 No N/A' N/A' Yes

  • ~*..

Yes Not Required.

N/A Susceptible Low Susceptible Yes - Note 131 No*

N/A'

. N/A Yes

'<20°:

Yes Repaired N/A Low Susceptible Yes - Note 131 No N/A N/A..

Yes - Note 1111.

<20~

  • Yes Not Repaired Spring 2018*

Low Susceptible Yes - Note 131 No N/A NIA.

Yes - Note 1111

,, <ioo Yes

  • . Not Repaired
  • Spring 2018 Low Susceptible Yes - Note 131 No N/A*

N/A Yes - Note 1111

<20°. ---.

Yes Not Repaired Spring 2018 Low Susceptible Yes - Note 131 No N/A

    • . N/A Yes

.... <20°.

Yes Not Repaired Spring 2018 Low Nii>.

N/ A -.Note 1121 Note 1131 Susceptible N/A N/A N/A N/A No N/A N/A Low Note 1131 Susceptible N/A N/A N/A N/A No N/A N/ A.: Note 1121 N/A N/A N/A Note 1131 Susceptible N/A N/A N/A N/A No N/A N/ A - Note 1121 N/A N/A N/A Susceptible.

N/A N/A N/A N/A No N/A N/ A - Note 1121 N/A N/A Note 1131 N/A Susceptible Yes - Note 131 No N/A N/A Yes s5 O N/A-Note 1121 N/A N/A N/A Susceptible Yes - Note 131 No N/A N/A Yes ss O N/ A - Note il2J' N/A N/A N/A Not N/A N/A N/A N/A No N/A N/A-Note 1121 Repaired 2004 N/A Susceptible Not N/A N/A N/A N/A Susceptible N/A No N/A N/ A - Note ll2i Repaired 2004 N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10° Yes Not repaired N/A High Not Yes - Note 131 Yes susceptible Yes Yes Yes

< 100 Yes Not repaired N/A Not High Yes - Note 131 Yes Yes susceptible Yes Yes

< 100 Yes Not repaired N/A Low Not Yes - Note 131 Yes No susceptible Yes Yes

< 100 Yes Not repaired N/A Low Not Yes - Note 131 Yes No susceptible Yes Yes

< 100 Yes Not repaired N/A Not Low Yes - Note 131 Yes No Yes No N/A Yes Nat repaired N/A susceptible Med Not Yes - Note 131 No Yes No N/A Yes

.. Not repaired N/A susceptible Yes Med Not Yes - Note 131 Yes Yes susceptible Yes Yes

< 10° Yes Not repaired N/A Med Not Yes - Note 131 Yes susceptible Yes Yes Yes

< 10° Yes

. Not repa.ired N/A Low Not susceptible Yes - Note 131 No No Yes No N/A Yes Not repaired.

N/A..

PAGE 1 OF 3

~~----------------------------------------

to CNR0-2017-00025 Page 2 of3 Plant Name IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC

.1ec _

IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC Unit#

2 2

2 2

2 2

2 2

2 2 -

2 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

Valve JD System 8508 SI 851A SI 8518 SI 885A SI 8858 SI 888A SI 888B SI 894A SI 894B SI 894C SI

- --894D-

-SI -- - -

FCV-625 CCW AC-MOV-743 RHR AC-MOV-744 RHR AC-MOV-745A RHR AC-MOV-745B RHR SI-MOV-1802A SI SI-MOV-18028 SI SI-MOV-1835A SI SI-MOV-183S B SI SI-MOV-1852A SJ SI-MOV-1852B SI SI-MOV-1869A SI SI-MOV-1869B SI SI-MOV-8S1A SI SI-MOV-8S1B SI SI-MOV-866A CONTAINMENT SPRAY SI-MOV-866B CONTAINMENT SPRAY SI-MOV-882 SI SI-MOV-883 SI SI-MOV-88SA SI Active Are multiple design basis Safety Valve Size post-accident Valve Functional Description Function (inches) strokes (0/C/Both/

required?

None)

(yes/no).

23 SAFETY INJECTION PUMP DISCHARGE 4

STOP Close No 22 SI PUMP TIE VALVE TO DISCHARGE OF 4

C No 2151 PUMP 22 SI PUMP TIE VALVE TO DISCHARGE OF 4

C No 23 SI PUMP RHR PUMP SUCTION FROM 12 CONTAINMENT SUMP Both Yes RHR PUMP SUCTION FROM 12 CONTAINMENT SUMP Both Yes SI PUMPS SUCTION FROM RESIDUAL HEAT EXHANGER 21 & 22 4

Both Yes SI PUMPS SUCTION FOM RESIDUAL HX-21,22 4

Both Yes ACCUMULATOR TANK 21 DISCHARGE STOP 8

None No ACCUMULATOR TANK 22 DISCHARGE STOP 8

None No ACCUMULATOR TANK 23 DISCHARGE STOP 8

None No ACCUMULATOR TANK-24 DISCHARGE STOP 8

None No RCP THERMAL BARRIER CCW RTRN 3

HEADER FLOW C

No RHR LOOP MINIFLOWTEST LINE STOP 3

C No RHR PUMPS DISCHARGE ISOLATION 10 C

No 32 RHR HX INLET ISOLATION 6

C No 32 RHR HX INLET ISOLATION 6

C No RECIRC PUMP DISCHARGE ISOLATION 10 Both Yes RECIRC PUMP DISCHARGE ISOLATION 10 Both Yes BIT OUTLET ISOLATION

-4 Both Yes BIT OUTLET ISOLATION 4

Both Yes BORON INJECTION TANK INLET STOP 4

None No BORON INJECTION TANK INLET STOP 4

None No 32 RHR HX OUTLET TO 51/RHR MINIFLOW 6

C ISOLATION No 31 RHR HX OUTLET TO SI/RHR MINIFLOW 6

ISOLATION C

No 32 SAFETY INJECTION PUMP DISCHARGE ISOLATION 4

Both Yes 32 SAFETY INJECTION PUMP DISCHARGE 4

ISOLATION Both No CONTAINMENT SPRAY PUMP #31 DISCHARGE STOP 6

Both Yes CONTAINMENT SPRAY PUMP #32 DISCHARGE STOP 6

Both Yes RHR PUMPS RWST SUCTION ISOLATION 10 C

No RHR PUMP RECIRC LINE TO RWST STOP 8

0 No CONTAINMENT SUMP RHR SUCTION 14 ISOLATION Both Yes ENTERGY ANCHOR DARLING DOUBLE DISK GATE VALVE LISTING Result of Is the susceptibility Does the For cases where thread-If yes, include Was the diagnostic A repair Expert Panel susceptibility evaluation in general friction was relied upon, test data reviewed for susceptibility If yes, was the Was an initial stem-rotation The valve's repair schedule for Risk Ranking evaluation conformance with information is provided failure precursors evaluation rely on COF greater than rotation check criteria (i.e.

status (i.e. repaired each (high, (susceptible or TP16-1-112 R4?

whether the coefficient described in medium, low) not (Yes/No) thread friction?

0.10 (Yes/No) of friction was above or performed (Yes/No) SlO degrees or TP16-1-112R4 or not repaired) susceptible susceptible)

Notes 111.121 o, 131 (Yes/No) below 0.1 (Yes/No) ss degrees)

(Yes/No) valve Low Not susceptible Yes - Note-':!...~

No No Yes Yes

< 10*

Yes Not repaired N/A Low Not Yes - Note 131 Yes Yes susceptible Yes Yes

< 10*

Yes Repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Repaired N/A Med Not Yes - Note 131 susceptible Yes Yes Yes Yes

< 10*

Yes Repaired N/A High Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A High Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Not Yes - Note 131 Low susceptible Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes-Note 131 Yes Yes Yes Yes

< 10*

Yes Repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes - Note 161 Not repaired Spring 2019 Note 1' 1 Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Susceptible Yes - Note 131 Yes No No Yes

< 10*

Yes - Note 161 Not repaired Spring 2019 Note 1'1 Low Not susceptible Yes - Note 131 Yes No No No

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes No No Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes No No Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Low Susceptible Yes - Note 131 Yes Yes

< 10*

Yes - Note 161 Not repaired Spring 2019 Note 1' 1 Yes Yes Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A Susceptible Yes - Note 131 Yes Yes Yes - Note 161 Not repaired Spring 2019 Low Note 1'1 Yes Yes

< 10*

Low Susceptible Yes - Note 131 Yes Yes Yes Yes - Note 161 Not repaired Spring 2019 Note 1' 1 Yes

< 10*

Low Susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes - Note 161 Not repaired Spring2019 Note 1' 1 Low Not Yes - Note 1' 1 Yes susceptible Yes Yes Yes

< 10*

Yes Not repaired N/A Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A PAGE 2 OF 3

~Attachment 1 to I

CNR0-2017-00025 Page 3 of3 ENTERGY ANCHOR DARLING DOUBLE DISK GATE VALVE LISTING I

Active Are multiple Result of Is the susc~ptibility Does the For cases where thread-If yes, include Was the diagnostic A repair design basis Expert Panel susceptibility evaluation in general friction was relied upon, test data reviewed for Safety susceptibility If yes, was the Was an initial stem-rotation The valve's repair schedule for Plant Valve Size post-accident Risk Ranking evaluation conformance with information is provided failure precursors Unit#

Valve ID System Valve Functional Description Function evaluation rely on COF greater than rotation check criteria (i.e.

status (i.e. repaired each Name (inches) strokes (high, (susceptible or TP16-1-112 R4?

whether the coefficient described in (0/C/Both/

required?

medium, low)

(Yes/No) thread friction?

0.10 (Yes/No) of friction was above or performed (Yes/No) SlO degrees or TP16-1-112R4 or not repaired) susceptible None) not (Yes/No)

SS degrees) valve (yes/no).

susceptible)

Notes 111,1210,(31 below 0.1 (Yes/No)

(Yes/No)

IPC 3

SI-MOV-885B SI CONTAINMENT SUMP RHR SUCTION ISOLATION 14 Both Yes Med Not Yes - Note 131 susceptible Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-888A SI LOW HEAD TO HIGH HEAD SI RECIRC STOP 4

Both Yes Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-888B SI LOW HEAD TO HIGH HEAD SI RECIRC STOP 4

Both Yes Med Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-889A css 32 RHR HX OUTLET TO SPRAY HEADER STOP 6

0 No Low Not Yes - Note 131 susceptible Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-889B css 31 RHR HX OUTLET TO SPRAY HEADER Susceptible Yes - Note 131 Yes - Note 161 STOP 6

0 No Low Note 191 Yes Yes Yes Yes

< 10*

Not repaired Spring 2019 IPC 3

SI-MOV-894A SI ACCUMULATOR TANK 31 DISCHARGE STOP 8

None No Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-894B SI ACCUMULATOR TANK 32 DISCHARGE STOP 8

None No Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-894C SI, ACCUMULATOR TANK 33 DISCHARGE STOP 8

None No Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A IPC 3

SI-MOV-894D SI ACCUMULATOR TANK 34 DISCHARGE STOP 8

None No Low Not susceptible Yes - Note 131 Yes Yes Yes Yes

< 10*

Yes Not repaired N/A PNP 1

M0-202-4A None N/A N/A N/A-Note 1121 N/A RECIRC REACTOR RECIRC PUMP A SUCTION VALVE 28x24x28 Note 151 No N/A N/A

. N/A N/A No N/A N/A PNP 1

M0-202-4B None i/A~*

N/A N/A N/A N/ A - Note 1121 N/A RECIRC REACTOR RECIRC PUMP B SUCTION VALVE 28x24x28 Note (SI No N/A N/A No N/A N/A PNP 1

M0-202-SA RECIRC REACTOR RECIRC PUMP A DISCHARGE 28x24x28 C

High Not

-~*-**"",,~~

Yes Yes No N/A Yes Not Repaired N/A VALVE No Susceptible Yes-Note f;i\\.~ 't Yes REACTOR RECIRC PUMP B DISCHARGE

  • _....,,..*r--.

Not PNP 1

M0-202-SB RECIRC 28x24x28 C

No High Yes-Note<*:

Yes Yes Yes No N/A Yes Not Repaired N/A VALVE Susceptible PNP 1

M0-1001-29B RHR LPCI LOOP B INJECTION VALVE #2 18 Both Yes High Susceptible Yes-Note 131 Yes Yes Yes No N/A Yes Not Repaired F/0 2018 Note 141 RBS 1

B33-MOVF023A RECIRC RX RECIRC PMP A DISCH HEADER LOOP A ISOL VLV OPER 24 None No N/A Susceptible N/A No N/A N/A No N/A N/A-Note 1121 N/A N/A RBS 1

B33-MOVF023B RECIRC RX RECIRC PMP B DISCH HEADER LOOP B ISOL VLV OPER 24 None No N/A Susceptible N/A No N/A N/A No N/A N/A-Note 1121 N/A N/A RX RECIRC PMP A SUCT HEADER LOOP A None Not Yes-Note 131 N/ A - Note 1121 Repaired RBS 1

B33-MOVF067A RECIRC 24 Note 151 No N/A Yes No N/A No N/A No*

ISOL VLV OPER Susceptible

__ 20Q7 RX RECIRC PMP B SUCT HEADER LOOP B None Not N/A-Note 1121 Repaired RBS 1

B33-M0VF067B RECIRC 24 No N/A Yes-Note 131 Yes No N/A No N/A No ISOL VLV OPER Note 151 Susceptible 2007 WF3 3

SI MVAAA407 A SI RC LOOP 2 SDC SUCTION OUTSIDE 14 0

Susceptible Yes-Nate IBI No N/A N/A Yes Jan/Feb No Low Note 1BI ss*

Yes Not Repaired CONTAINMENT ISOL 2019 WF3 3

SI MVAAA407 B SI RC LOOP 1 SDC SUCTION OUTSIDE 14 0

Susceptible Yes-Note 1' 1 No N/A N/A Yes Jan/Feb No Low Note IBI ss*

Yes Not Repaired CONTAINMENT ISOL 2019 Notes are listed in Attachment 2 PAGE3 OF3

ATTACHMENT 2 CNR0-2017-00025 LICENSING COMMITMENTS and NOTES The following table identifies commitments made in this document.

(Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRG for the NRC's information and are not regulatory commitments.)

to CNR0-2017-00025 Page 1 of 5 Plant Name ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO ANO GGN Unit#

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 2

2 1

Valve ID CV-2827 CV-1009 CV-1213 CV-1214 CV-1215 CV-1216 CV-1221 CV-1233 CV-1234 CV-2215 CV-2220 CV-2221 CV-2235 CV-2625 CV-2630 CV-2675 CV-2680 2CV-4653 2CV-4654 2CV-4655 2CV-4656 1B33F023A ENTERGY - LICENSING COMMITTMENTS and NOTES Regulatory Commitment Type Commitment Type Note(s)

-Commitment to Commitment Date One-Time Action Programmatic Repair or Outage Yes/No Yes/No Yes/No 3, 7, 11, 12 Yes - Note (7l Spring 2018 Yes No 3, 10 Note (lOl 3

Repair Complete 3, 10 Note (10l 3

Repair Complete 3, 10 Note (10l 3, 11 Repair Complete 3, 11 Repair Complete 3, 11 Repair Complete 3, 11 No 3, 11 No 3

-No 3

Repair Complete 3, 7, 11 Yes - Note (7l Spring 2018 Yes No 3, 7, 11 Yes - Note Pl Spring 2018 Yes No 3, 7, 11 Yes - Note (7l Spring 2018 Yes No 3, 7 Yes - Note (7l Spring 2018 Yes No 13 No 13 No 13 No 13 No 5, 12 No PAGE 1 OF 5 to CNR0-2017-00025 Page 2 of 5 Plant Name GGN GGN GGN IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC Unit#

1 1

1 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

Valve ID 1833F0238 1833F067A 1833F0678 744 746 747 769 784 797 882 1802A 18028 850A 8508 851A 8518 885A 8858 888A 8888 894A 8948 ENTERGY - LICENSING COMMITTMENTS and NOTES Regulatory Commitment Type Commitment Type Note(s)

Commitment to Commitment Date One-Time Action Programmatic Repair or Outage Yes/No Yes/No Yes/No 5, 12 No 12 Repair Complete 12 Repair Complete 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No 3

No PAGE 2 OF 5 to CN R0-2017-00025 Page 3 of 5 Plant Name IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC IPC Unit#

2 2

2 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

Valve ID 894C 894D FCV-625 AC-MOV-743 AC-Mov:..744 AC-MOV-745A AC:..MOV-7458 SI-MOV-1802A SI-MOV-1802B SI-MOV-1835A SI-MOV-1835B SI-MOV-1852A SI-MOV-1852B SI-MOV-1869A SI-MOV-1869B SI-MOV-851A SI-MOV-851B SI-MOV-866A SI-MOV-866B SI-MOV-882 SI-MOV-883 SI-MOV-885A ENTERGY - LICENSING COMMITTMENTS and NOTES Regulatory Commitment Type Commitment Type Commitment to Commitment Date Note(s)

One-Time Action Programmatic Repair or Outage Yes/No Yes/No Yes/No 3

No

-3 No 3

No 3

No 3

No 3

No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3

No 3

No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3

No 3

No 3

No 3

No 3

No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3

No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3

No 3

No PAGE 3 OF 5 to CNR0-2017-00025 Page 4 of 5 Plant Name IPC IPC IPC IPC IPC IPC IPC IPC IPC PNP PNP PNP PNP PNP RBS RBS RBS RBS Unit#

3 3

3 3

3 3

3 3

3 1

1 1

1 1

1 1

1 1

Valve ID SI-MOV-885B SI-MOV-888A SI-MOV-888B SI-MOV-889A SI-MOV-889B SI-MOV-894A SI-MOV-894B SI-MOV-894C SI-MOV-894D M0-202-4A M0-202-4B M0-202-5A M0-202-5B M0-1001-29B B33-MOVF023A B33-MOVF023B B33-MOVF067A B33-MOVF067B ENTERGY - LICENSING COMMITTMENTS and NOTES Regulatory Commitment Type Commitment Type Commitment to Commitment Date Note(s)

  • One-Time Action Programmatic Repair or Outage Yes/No Yes/No Yes/No 3

No 3

No 3

No 3

No 3, 6, 7, 9 Yes - Note (7l Spring 2019 Yes No 3

No 3

No 3

No 3

No 5, 12 No 5, 12

  • No 3

No 3

Na 3, 4, 7 Yes - Note (7l FO 2018 Yes No 5, 12 No 5, 12 No 3, 12 Repai! Complete 3, 12 Repair Complete PAGE 4 OF 5 to CN R0-2017-00025 Page 5 of 5 Plant Name WF3 WF3 Unit#

3 3

Valve ID SI MVAAA407 A SI MVAAA407 B NOTE 1 NOTE 2 NOTE3 NOTE4 NOTES NOTE 6 NOTE7 NOTES NOTE9 NOTE 10 NOTE 11 NOTE 12 NOTE 13*

ENTERGY - LICENSING COMMITTMENTS and NOTES Regulatory Commitment Type Commitment Type Commitment to Commitment Date Note(s)

One-Time Action Programmatic Repair or Outage Yes/No Yes/No Yes/No 7, 8 Yes - Note (7l Jan/Feb 2019 Yes No 7, 8 Yes - Note (7l Jan/Feb 2019 Yes No Applied Wedge Pin Torque based on maximum value from diagnostic test data Applied Wedge Pin Torque based on maximum actuator output torque (locked rotor)

Applied Wedge Pin Torque based on the limiting value of the spring pack capability or the valve/actuator weak link torque.

M0-1001-29B is a priority 1 based on being subject to flow induced vibration in which the disc pack is in a turbulent flow stream.

Recirculation suction valves are classified as safety related - pressure boundary only.

Anomaly noted in diagnostic test Repair of valve is based on availability of replacement parts Wedge pin analysis is based on valve being properly torqued during assembly.

Flowserve provided a letter confirming the torque value because their process had changed when valves were purchased in 2002, however no work documents could be provided by Flowserve.

Susceptible based on review of diagnostic trace. Not susceptible based on pin shear analysis and stem rotation Wedge pin shear analysis is in progress. Corrective action will be based on the results of this analysis.

Stem rotation was greater than 5 degrees Non GL96-0S MOV Valves are under review to potentially change their safety function and/or risk signifucance.

PAGE 5 OF 5