MONTHYEARML18037A8362018-01-31031 January 2018
[Table View]Appendix E - Turkey Point Nuclear Plant Units 3 and 4 Environmental Report Subsequent Operating License Renewal Stage Project stage: Other L-2018-086, Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information2018-04-10010 April 2018 Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information Project stage: Supplement ML18155A3292018-05-27027 May 2018 Comment (1) of Matthew Cook on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18155A3312018-05-28028 May 2018 Comment (2) of Hannah Gardiner Supporting License Renewal for Turkey Point Nuclear Plant Units 3 and 4 Project stage: Other ML18155A3332018-05-30030 May 2018 Comment (4) of John Karahalios Supporting License Renewal of Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 Project stage: Other ML18155A3322018-05-30030 May 2018 Comment (3) of Gabriel Ignetti on Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English Project stage: Request ML18155A3342018-05-31031 May 2018 Comment (5) of Elaine Trotter on Turkey Point Nuclear Plant, Units 3 and 4 Project stage: Request ML18162A0632018-05-31031 May 2018 Comment (6) of Anthony Denardo Supporting Turkey Point Nuclear Plant, Units 3 and 4 License Renewal Project stage: Other ML18187A2212018-05-31031 May 2018 Documents Provided by Laura Sue Wilansky to the U.S. Nuclear Regulatory Commission During the Turkey Point Nuclear Generating Units 3 and 4 Public Environmental Scoping Meeting on May 31, 2018 Project stage: Request ML18187A2242018-05-31031 May 2018 Documents Provided by Steve Schoedinger to U.S. Nuclear Regulatory Commission During the Turkey Point Unit 3 & 4 Public Environmental Scoping Meeting on May 31, 2018 Project stage: Request ML18162A0652018-06-0202 June 2018 Comment (7) of James Hopf Supporting Turkey Point Nuclear Plant, Units 3 and 4 License Renewal Project stage: Other ML18162A0672018-06-0303 June 2018 Comment (9) of Jonathan Bauer Objecting to Extension of the License of Florida Power & Light Company, Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18162A0662018-06-0303 June 2018 Comment (8) of D. Sotelo Opposing Turkey Point Nuclear Plant, Units 3 and 4 License Renewal Project stage: Other ML18162A0682018-06-0404 June 2018 Comment (10) of Diane Johnson on Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18162A0692018-06-0505 June 2018 Comment (11) of Sarah Fangman of Us Dept of Commerce, National Oceanic & Atmospheric Admin on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18162A0702018-06-0606 June 2018 Comment (12) of Ian Zink on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18162A0742018-06-0707 June 2018 Comment (13) of Robert Pike on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4 License Renewal Project stage: Other ML18179A1582018-06-0707 June 2018 Comment (28) of Kirk C. Zuelch on Behalf of Florida Keys Aqueduct Authority on Florida Power and Light Application for Renewal Project stage: Request ML18163A1132018-06-0909 June 2018 Comment (14) of Patricia Milone on Turkey Point Nuclear Plant Units 3 and 4 Project stage: Request ML18169A1522018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) SNO Requests Consultation Meeting with Nrc/Fpl at Turkey Point Nuclear Power Plant Project stage: Request ML18158A3352018-06-13013 June 2018 License Renewal Environmental Site Audit Regarding the Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application Project stage: Other ML18179A4952018-06-14014 June 2018 Comment (48) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A3412018-06-14014 June 2018 Comment (33) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4912018-06-14014 June 2018 Comment (47) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4892018-06-14014 June 2018 Comment (46) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4842018-06-14014 June 2018 Comment (45) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4762018-06-14014 June 2018 Comment (44) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4702018-06-14014 June 2018 Comment (43) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4622018-06-14014 June 2018 Comment (42) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4492018-06-14014 June 2018 Comment (41) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4372018-06-14014 June 2018 Comment (40) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4262018-06-14014 June 2018 Comment (39) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4152018-06-14014 June 2018 Comment (38) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A4042018-06-14014 June 2018 Comment (37) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A3902018-06-14014 June 2018 Comment (36) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A3632018-06-14014 June 2018 Comment (35) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A3542018-06-14014 June 2018 Comment (34) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A3332018-06-14014 June 2018 Comment (32) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2452018-06-14014 June 2018 Comment (31) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2442018-06-14014 June 2018 Comment (30) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2422018-06-14014 June 2018 Comment (29) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2392018-06-14014 June 2018 Comment (28) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2352018-06-14014 June 2018 Comment (27) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2332018-06-14014 June 2018 Comment (26) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18179A2322018-06-14014 June 2018 Comment (25) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18178A6742018-06-14014 June 2018 Comment (6) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18178A6812018-06-14014 June 2018 Comment (11) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18178A6802018-06-14014 June 2018 Comment (10) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request ML18178A6792018-06-14014 June 2018 Comment (9) E-mail Regarding T.P. 3&4 SLR EIS Scoping Project stage: Request 2018-06-13 |
ML18186A088 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 06/19/2018 |
From: | Besford S Public Commenter |
To: | Division of Materials and License Renewal |
NRC/NRR/DMLR | |
References | |
83FR23726, NRC-2018-0101 | |
Download: ML18186A088 (1) | |
Similar Documents at Turkey Point | |
---|---|
Category:E-Mail
MONTHYEARML24024A0182024-01-24024 January 2024
[Table view]LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21266A2602021-09-22022 September 2021 NRR E-mail Capture - (External_Sender) Partial Sea Turtle Carcass at Turkey Point ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21207A1212021-06-30030 June 2021 Fws to NRC, Biological Opinion Notifications to Fws Law Enforcement ML21158A2332021-06-0707 June 2021 NRR E-mail Capture - Acceptance Review: Turkey Point Units 3 and 4 Fifth Ten-Year ISI Extension of ISI RPV Welds from 10 to 20 Years (L-2021-LLR-0038) ML21154A0872021-06-0202 June 2021 NRR E-mail Capture - 06/02/2021 Print a Logbook Entry: Turkey Point Endangered Species Report Regarding Injured American Crocodiles ML21154A0862021-05-25025 May 2021 NRR E-mail Capture - Acceptance Review: Turkey Point - Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology ML21140A0672021-05-13013 May 2021 NRR E-mail Capture - (External_Sender) Regarding Doa American Crocodile Report 5-13-21 ML21131A1362021-05-0404 May 2021 NRR E-mail Capture - (External_Sender) 5/4/2021 Report Regarding Doa American Crocodile ML21097A1832021-03-30030 March 2021 NRR E-mail Capture - Endangered Species Death Report from Turkey Point Regarding Incident on 03/30/2021 ML21084A1312021-03-18018 March 2021 NRR E-mail Capture - (External_Sender) Deceased American Crocodile Found Outside FPL Property Line ML21056A0002021-02-24024 February 2021 NRR E-mail Capture - Endangered Species - 2/24/2021 Logbook Entry Regarding an American Crocodile ML21029A0172021-01-25025 January 2021 NRR E-mail Capture - 1/25/2021 Logbook Entry Regarding an American Crocodile Reported in the Owner Controlled Area ML21025A4152021-01-25025 January 2021 NRR E-mail Capture - 10 CFR 2.206 Petition Dated January 10, 2021 - Open Phase Condition Implementation ML20346A1022020-12-0808 December 2020 NRR E-mail Capture - Response: September 17, 2020 Submittal to the Nuclear Regulatory Commission ML20218A5502020-08-0505 August 2020 Florida Power & Light Letter L-2020-127: FPL QAPD for 10 CFR 52 Licenses FPL-2 Revision Summary 2024-01-05 Category:General FR Notice Comment Letter MONTHYEARML23312A0682023-11-0707 November 2023
[Table view]Comment (7) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23283A0582023-10-0606 October 2023 Comment (6) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23272A0062023-09-28028 September 2023 Comment (5) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23271A0242023-09-15015 September 2023 Comment (4) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23271A0232023-09-14014 September 2023 Comment (3) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23271A0222023-09-13013 September 2023 Comment (2) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23271A0212023-09-12012 September 2023 Comment (1) E-mail Regarding T.P. 3&4 Suppl Draft SEIS ML23262A7632023-09-10010 September 2023 Comment (1) of Gordon Howard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Florida Power& Light Company Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23103A0472022-11-28028 November 2022 Comment (7) E-mail Regarding T.P. 3&4 Suppl Dseis ML22312A5732022-11-0808 November 2022 Comment (2) of William Kenneth Dean on Notice of Intent to Prepare a Supplement to the Final Supplemental Environmental Impact Statement for the Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML22314A0952022-11-0707 November 2022 Comment (5) of Talbert Cypress on Reauthorizing the Turkey Point Nuclear Generating Station Beyond Its Intended Life Creates Immediate Harm and Manifold Risks ML23103A0352022-11-0707 November 2022 Comment (5) E-mail Regarding T.P. 3&4 Suppl Dseis ML22312A5762022-11-0707 November 2022 Comment (4) of Anonymous on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Florida Power& Light Company Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23103A0452022-11-0707 November 2022 Comment (6) E-mail Regarding T.P. 3&4 Suppl Dseis ML22312A5742022-11-0707 November 2022 Comment (3) of Caroline Reiser on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Florida Power& Light Company Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23103A0342022-10-18018 October 2022 Comment (4) E-mail Regarding T.P. 3&4 Suppl Dseis ML22294A1062022-10-17017 October 2022 Comment (1) of Gano Perez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Florida Power & Light Company Turkey Point Nuclear Generating, Unit Nos. 3 and 4 ML23103A0322022-10-17017 October 2022 Comment (3) E-mail Regarding T.P. 3&4 Suppl Dseis ML23103A0312022-10-16016 October 2022 Comment (2) E-mail Regarding T.P. 3&4 Suppl Dseis ML23103A0482022-10-14014 October 2022 Comment (8) E-mail Regarding T.P. 3&4 Suppl Dseis ML23102A0082022-10-11011 October 2022 Comment (1) E-mail Regarding T.P. 3&4 Suppl Dseis ML19154A0412019-05-31031 May 2019 Comment (4721) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0432019-05-31031 May 2019 Comment (4723) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0442019-05-31031 May 2019 Comment (4724) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0422019-05-31031 May 2019 Comment (4722) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0452019-05-31031 May 2019 Comment (4725) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0362019-05-30030 May 2019 Comment (4716) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0402019-05-30030 May 2019 Comment (4720) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0372019-05-30030 May 2019 Comment (4717) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0392019-05-30030 May 2019 Comment (4719) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0382019-05-30030 May 2019 Comment (4718) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0342019-05-29029 May 2019 Comment (4714) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0312019-05-29029 May 2019 Comment (4711) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0352019-05-29029 May 2019 Comment (4715) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0322019-05-29029 May 2019 Comment (4712) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0302019-05-29029 May 2019 Comment (4710) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0332019-05-29029 May 2019 Comment (4713) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0212019-05-28028 May 2019 Comment (4701) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0282019-05-28028 May 2019 Comment (4708) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0262019-05-28028 May 2019 Comment (4706) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0292019-05-28028 May 2019 Comment (4709) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0272019-05-28028 May 2019 Comment (4707) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0202019-05-28028 May 2019 Comment (4700) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0252019-05-28028 May 2019 Comment (4705) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0242019-05-28028 May 2019 Comment (4704) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0232019-05-28028 May 2019 Comment (4703) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0222019-05-28028 May 2019 Comment (4702) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0082019-05-27027 May 2019 Comment (4688) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0142019-05-27027 May 2019 Comment (4694) E-mail Regarding T.P. 3&4 SLR Draft SEIS ML19154A0112019-05-27027 May 2019 Comment (4691) E-mail Regarding T.P. 3&4 SLR Draft SEIS 2023-09-28 |
Text
From: staceylynn11@everyactioncustom.com To: TurkeyPoint34SLREIS Resource
Subject:
[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL"s Turkey Point)
Date: Tuesday, June 19, 2018 7:04:52 AM
Dear NRC Staff,
As a resident of South Florida, I am very concerned about the operation of Turkey Point until the early 2050s, especially since the plant is already contaminating nearby resources such as Biscayne Bay National Park and threatening our region's drinking water resources.
I request that the NRC independently evaluate the pollution leaking from the cooling canal system and study alternative cooling technologies that could protect the environment, such as the installation of cooling towers, which are already used for the natural gas plant onsite (Unit 5) and were approved by the NRC for use at the proposed new Turkey Point reactors (Units 6 & 7) that are unlikely to ever be built.
The NRC needs to be aware that Turkey Point and the area around it has already experienced the negative effects of sea level rise and storm surges. The NRC needs to study a range of sea level rise projections and consider those impacts on the plant, the cooling canal system, and the surrounding community, including for emergency evacuation procedures and planning.
Thank you.
Sincerely, Stacey Besford 191 Atlantic Circle Dr Tavernier, FL 33070-2604